WOKATUBA ……………………………………..

PIPE HANDLING & STORING PROCEDURE


PROSEDUR PENANGANAN & PENYIMPANAN PIPA

No: WOK/P/HSE/1.1.1/01 (Rev : 0)


Effective Date: July 2018
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

Prepared By :
Disusun Oleh

………………………………
Originator
Pemrakarsa

Reviewed by : Approved By :
Ditinjau Ulang Oleh Disetujui Oleh

……………………. …………………………
HSE Direktur Operasional

Amendment History
Riwayat Perubahan

Effective Date No Revisi. Amendment Remarks


No Tanggal Efektif Nomor Perubahan Catatan
Revisi

1. August 2012 0

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 2 of 7
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

PIPE HANDLING & STORING PROCEDURE


PROSEDUR PENANGANAN & PENYIMPANAN PIPA

No: WOK/P/HSE/1.1.1/01 (Rev : 0)


Effective Date: July 2018

Table of Content Page Daftar Isi Hal

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 3 of 7
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

Daftar Isi
Halaman
1. Purpose 4 Tujuan 4
2. Scope 4 Ruang Lingkup 4
3. Reference(s) 4 Referensi 4
4. Definition 4 Definisi 4
5. Procedure and Responsibilities 5-7 Prosedur dan Tanggung jawab 5-7
6. Attachment 6 Lampiran 7

1 Purpose Tujuan
This procedure covers the company’s Prosedur ini meliputi metode perusahaan
method for operating safe pipe handling untuk penanganan dan Penyimpanan pipa
and storage. secara aman.
2 Scope Ruang Lingkup
2.1 This Procedure seeks to ensure project Prosedur ini memastikan kebijakan dan
compliance with WOK policy and peraturan Wokatuba Indonesia dan syarat
legislative, regulatory and client klien untuk sistem penanganan dan
requirements for pipe handling and Penyimpanan pipa di seluruh area
storage system on all WOK premises. Wokatuba Indonesia dipenuhi.
2.2 This Procedure applies to all WOK Prosedur ini berlaku untuk seluruh kegiatan
Indonesia activities and projects. dan proyek di area Wokatuba Indonesia

3 Reference(s) Referensi
3.1 OHSAS 18001 clause 4.4.6 OHSAS 18001 klausul 4.4.6
3.2 ISO 14001 clause 4.4.6 ISO 14001 klausul 4.4.6

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 4 of 7
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

4 Definition Definisi
Tool Box Meeting, is a meeting on Tool Box Meeting, Adalah suatu
safety before starting to work either day pertemuan yang membahas tentang
or night work shift to ensure the running keselamatan kerja sebelum mulai bekerja
safely and secure. baik itu siang atau malam agar pekerjaan
hari itu berjalan dengan aman dan selamat.

5 Procedure Prosedur Responsible /


Penanggung
Jawab
5.1 Only those people involved in Personil yang boleh berada di Related Dept
the handling and storage of pipe area kerja adalah personil yang
are to be in the working area. terlibat dalam penanganan dan
Penyimpanan pipa.
5.2 A tool box meeting will be held Tool box meeting akan Area Supv, HSE
by the Site Supervisor/Safety dilakukan oleh Supervisor area /
Representative who designating petugas safety yang berwenang
on the specific jobs. ditugaskan untuk pekerjaan
tersebut.
5.3 Safety instruction will be given Instruksi keselamatan akan Area Supv, HSE
to the team, and an inspection diberikan ke tim, dan inspeksi
of personnel for safety APD untuk personil mengacu
equipment refer to P-HSE-0009 pada P-HSE-0009 Prosedur
Personal protective equipment Alat pelindung diri
procedure

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 5 of 7
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

5.4 All vehicles not involved in the Seluruh kendaraan yang tidak Related Dept
operation will be moved away terlibat dalam pekerjaan
from the working area. dijauhkan dari area kerja.
5.5 When handling pipe, clear Ketika penanganan pipa, Crane operator,
communications must be komunikasi yang jelas harus Signal
exercised, hand signals to be dilaksanakan, isyarat tangan man
shown to and described to the terlihat, dan dijelaskan ke tim.
team.
5.6 While crane is in operation, do Ketika Pesawat angkat Related Dept,
not put hand or fingers or any of beroperasi, jangan Helper
body parts into the ends of or memposisikan tangan atau
between the pipes. anggota tubuh yang lainnya
diujung atau diantara pipa.
5.7 While rolling pipe, roll from the Ketika mendorong pipa, dorong
ends or from behind to avoid dari ujung atau belakang untuk
the pipe gets out of control. menghindari pipa yang tidak
terkendali.
5.8 Keep the area clear of Jaga area bebas dari halangan Related Dept
obstructions this includes excess termasuk kayu ganjal yang
Dunn age. lapuk.
5.9 Use Dunn age that strongly Gunakan kayu ganjal yang kuat
enough to support the weight of untuk menopang berat pipa.
pipe.
5.10 Pipe must be racked evenly, Rak pipa harus datar, join harus Related Dept
joint above joints in a vertical berada posisi vertical, sehingga
direction, so that it overhangs posisinya menggantung di atas
the rack or lumber by the same rak atau kayunya dengan
amount both ends. Pipe in ukuran yang sama dikedua
ground racks must not be ujungnya. Pipa dirak Bawah
racked higher than 10 (ten) feet tidak boleh disusun lebih tinggi
above the rack sills. dari 10 kaki atau lebih tinggi
dari batas rak.

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 6 of 7
WOKATUBA ………………………………………

PIPE HANDLING & STORING PROCEDURE

5.11 All layers of pipe must be racked Seluruh lapisan pipa harus Related Dept
tightly and secured with wedges disusun terikat dan aman
nailed to the Dunn ago. dengan paku pasak ke kayu
ganjal.
5.12 Exercise extreme caution when Harus ekstra hati-hati ketika
walking on pipe racks. berjalan diatas rak pipa.
5.13 When handling pipe be aware Ketika menangani pipa Related Dept
that overhead power lines and waspadalah terhadap kabel arus
other electrical equipment must listrik dan peralatan elektrik
be avoided. lainnya harus dihindari.
5.14 After completion job the Site Setelah pekerjaan selesai Area Supv,HSE
Supervisor/Safety supervisor area dan petugas Dept
Representative must walk safety harus berjalan di
around the staked pipe and pancang pipa dan memeriksa
check that all wedges are semua pasak aman dari
securely nailed down. Site dibengkokan menghadap
Manager should recheck the kebawah sebisa mungkin.
finished operation and give a Manajer area harus memeriksa
final report to Operation ulang pekerjaan yang selesai
Manager. dan memberikan laporan akhir
ke manajer operasional.

6 Attachment(s) Lampiran
N/A Tidak Ada

HSE Department Revision : 0


No : WOK/C/P/HSE/1.1.0/01 Date : July 2018
Page : 7 of 7

You might also like