Data Hujan Menitan Dalam Kurun Waktu 10 Tahun

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 35

Data Hujan Menitan dalam Kurun Waktu 10 tahun

Curah Hujan dengan durasi hujan menitan


No Tahun
5 10 15 30 45 60 120
1 2 3 4 5 6 7 8 9
1 2000 12.51 15 20.5 32.9 40.31 46.51 57.3
2 2001 14.7 21.7 25.2 38 47 48.5 54
3 2002 13 19 22 36.5 42.6 46.5 53.6
4 2003 7.4 16.5 23 36.4 43.3 50 54
5 2004 10 20 30 44.2 51.2 51.2 52.2
6 2005 13.5 20 25 35 44 46.3 61.2
7 2006 11 20 21 34 40 45.2 60.9
8 2007 19.9 29.9 41.9 59.8 62 65 66.7
9 2008 18 26 30 51.8 52 52 59.8
10 2009 10 20 30 50 55 57.5 62.5

I = R/t

Perhitungan Intensitas Hujan


Curah Hujan dengan durasi hujan menitan
No Tahun
5 10 15 30 45 60 120
1 2 3 4 5 6 7 8 9
1 2000 150.12 90 82 65.8 53.7 46.5 28.65
2 2001 176.4 130.2 100.8 76 62.7 48.5 27
3 2002 156 114 88 73 56.8 46.5 26.8
4 2003 88.8 99 92 72.8 57.7 50.0 27
5 2004 120 120 120 88.4 68.3 51.2 26.1
6 2005 162 120 100 70 58.7 46.3 30.6
7 2006 132 120 84 68 53.3 45.2 30.45
8 2007 238.8 179.4 167.6 119.6 82.7 65.0 33.35
9 2008 216 156 120 103.6 69.3 52.0 29.9
10 2009 120 120 120 100 73.3 57.5 31.25
Total Intensitas 1560.12 1248.6 1074.4 837.2 636.5 508.71 291.1
Intensitas Rata2 156.012 124.86 107.44 83.72 63.65 50.871 29.11

Perhitungan Standar Deviasi


Curah Hujan dengan durasi hujan menitan
No Tahun
5 10 15 30 45 60 120
1 2 3 4 5 6 7 8 9
1 2000 34.715664 1215.2196 647.1936 321.13 98.17 19.02 0.21
2 2001 415.67054 28.5156 44.0896 59.60 0.98 5.62 4.45
3 2002 0.000144 117.9396 377.9136 114.92 46.99 19.11 5.34
4 2003 4517.4529 668.7396 238.3936 119.25 35.06 0.76 4.45
5 2004 1296.8641 23.6196 157.7536 21.90 21.27 0.11 9.06
6 2005 35.856144 23.6196 55.3536 188.24 24.88 20.89 2.22
7 2006 576.57614 23.6196 549.4336 247.12 106.53 32.16 1.80
8 2007 6853.8529 2974.6116 3619.2256 1287.37 361.46 199.63 17.98
9 2008 3598.5601 969.6996 157.7536 395.21 32.25 1.27 0.62
10 2009 1296.8641 23.6196 157.7536 265.04 93.68 43.94 4.58
Jumlah 18626.413 6069.204 6004.864 3019.776 821.25385 342.51369 50.71
Standar Deviasi 45.49 25.97 25.83 18.32 9.55 6.17 2.37

Perhitungan Intensitas Hujan Rencana Durasi 5 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


Standar Deviasi K
- Rata Rencana
2 156.012 45.49 -0.199 146.97
5 156.012 45.49 1.058 204.14
10 156.012 45.49 1.848 240.10
15 156.012 45.49 2.227 257.34
20 156.012 45.49 2.606 274.58
25 156.012 45.49 2.770 282.02
50 156.012 45.49 3.588 319.22
100 156.012 45.49 4.323 352.67

Perhitungan Intensitas Hujan Rencana Durasi 10 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


Standar Deviasi K
- Rata Rencana
2 124.86 25.97 -0.199 119.70
5 124.86 25.97 1.058 152.34
10 124.86 25.97 1.848 172.86
15 124.86 25.97 2.227 182.70
20 124.86 25.97 2.606 192.54
25 124.86 25.97 2.770 196.79
50 124.86 25.97 3.588 218.02
100 124.86 25.97 4.323 237.12

Perhitungan Intensitas Hujan Rencana Durasi 15 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


- Rata Standar Deviasi K Rencana
2 107.44 25.83 -0.199 102.31
5 107.44 25.83 1.058 134.77
10 107.44 25.83 1.848 155.18
15 107.44 25.83 2.227 164.97
20 107.44 25.83 2.606 174.76
25 107.44 25.83 2.770 178.99
50 107.44 25.83 3.588 200.11
100 107.44 25.83 4.323 219.10

Perhitungan Intensitas Hujan Rencana Durasi 30 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


Standar Deviasi K
- Rata Rencana
2 83.72 18.32 -0.199 80.08
5 83.72 18.32 1.058 103.10
10 83.72 18.32 1.848 117.58
15 83.72 18.32 2.227 124.52
20 83.72 18.32 2.606 131.46
25 83.72 18.32 2.770 134.46
50 83.72 18.32 3.588 149.43
100 83.72 18.32 4.323 162.90

Perhitungan Intensitas Hujan Rencana Durasi 45 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


Standar Deviasi K
- Rata Rencana
2 63.7 9.55 -0.199 61.76
5 63.7 9.55 1.058 73.76
10 63.7 9.55 1.848 81.31
15 63.7 9.55 2.227 84.93
20 63.7 9.55 2.606 88.55
25 63.7 9.55 2.770 90.11
50 63.7 9.55 3.588 97.92
100 63.7 9.55 4.323 104.95

Perhitungan Intensitas Hujan Rencana Durasi 60 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


Standar Deviasi K
- Rata Rencana
2 50.871 6.17 -0.199 49.65
5 50.871 6.17 1.058 57.40
10 50.871 6.17 1.848 62.27
15 50.871 6.17 2.227 64.61
20 50.871 6.17 2.606 66.95
25 50.871 6.17 2.770 67.96
50 50.871 6.17 3.588 73.00
100 50.871 6.17 4.323 77.54

Perhitungan Intensitas Hujan Rencana Durasi 120 Menit dengan Metode Gumbel

Periode Ulang (tahun) Intensitas Hujan Rata Intensitas Hujan


- Rata Standar Deviasi K Rencana
2 29.11 2.37 -0.199 28.64
5 29.11 2.37 1.058 31.62
10 29.11 2.37 1.848 33.50
15 29.11 2.37 2.227 34.40
20 29.11 2.37 2.606 35.30
25 29.11 2.37 2.770 35.68
50 29.11 2.37 3.588 37.63
100 29.11 2.37 4.323 39.37
Waktu Periode Nilai K
Menit Jam Ulang
5 0.08 2 -0.199
10 0.17 5 1.058
15 0.25 10 1.848
20 0.33 15 2.227
30 0.50 20 2.606
45 0.75 25 2.770
60 1.00 50 3.588
120 2.00 100 4.323
240 4.00
300 5
umbel
Intensitas Hujan
Rencana
146.97
204.14
240.10
257.34
274.58
282.02
319.22
352.67

Gumbel
Intensitas Hujan
Rencana
119.70
152.34
172.86
182.70
192.54
196.79
218.02
237.12

Gumbel
Intensitas Hujan
Rencana
102.31
134.77
155.18
164.97
174.76
178.99
200.11
219.10

Gumbel
Intensitas Hujan
Rencana
80.08
103.10
117.58
124.52
131.46
134.46
149.43
162.90

Gumbel
Intensitas Hujan
Rencana
400.00
61.76
73.76
350.00
81.31
84.93
300.00
88.55
90.11 2
250.00 5
97.92
1
104.95
200.00 2
2
Gumbel 5
150.00
Intensitas Hujan 1
Rencana 1
100.00
49.65
57.40
50.00
62.27
64.61
0.00
66.95
50.871
67.96
73.00
77.54

Gumbel Rekapitulasi Perhitungan Intensitas


Intensitas Hujan Intensitas Hujan (mm/jam) tiap men
Rencana No Tahun
5 10 15
28.64 1 2 3 4 5
31.62 1 2 146.97 119.70 102.31
33.50 2 5 204.14 152.34 134.77
34.40 3 10 240.10 172.86 155.18
35.30 4 15 257.34 182.70 164.97
35.68 5 20 274.58 192.54 174.76
37.63 6 25 282.02 196.79 178.99
39.37 7 50 319.22 218.02 200.11
8 100 352.67 237.12 219.10

2 5 10 15
146.97 204.14 240.10 257.34
119.70 152.34 172.86 182.70
102.31 134.77 155.18 164.97
80.08 103.10 117.58 124.52
61.76 73.76 81.31 84.93
49.65 57.40 62.27 64.61
28.64 31.62 33.50 34.40
2 Tahun
5 Tahun
10 Tahun
20 Tahun
25 Tahun
50 Tahun
15 Tahun
100

itungan Intensitas
ensitas Hujan (mm/jam) tiap menitan
30 45 60 120
6 7 8 9
80.08 61.76 49.65 28.64
103.10 73.76 57.40 31.62
117.58 81.31 62.27 33.50
124.52 84.93 64.61 34.40
131.46 88.55 66.95 35.30
134.46 90.11 67.96 35.68
149.43 97.92 73.00 37.63
162.90 104.95 77.54 39.37

20 25 50 100
274.58 282.02 319.22 352.67
192.54 196.79 218.02 237.12
174.76 178.99 200.11 219.10
131.46 134.46 149.43 162.90
88.55 90.11 97.92 104.95
66.95 67.96 73.00 77.54
35.30 35.68 37.63 39.37
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk p

waktu (t) Intensitas Ixt I^2 I^2xt log t log I log t x log I
Hujan (I)
5 146.97 734.86 21600.73 108003.66 0.70 2.17 1.51
10 119.70 1197.00 14328.02 143280.16 1.00 2.08 2.08
15 102.31 1534.61 10466.75 157001.19 1.18 2.01 2.36
30 80.08 2402.40 6412.81 192384.36 1.48 1.90 2.81
45 61.76 2779.04 3813.86 171623.59 1.65 1.79 2.96
60 49.65 2978.71 2464.64 147878.26 1.78 1.70 3.02
120 28.64 3436.60 820.15 98418.37 2.08 1.46 3.03
Total 589.10 15063.21 59906.95 1018589.58 9.86 13.10 17.77

CARA SHERMAN CARA TALBOT


LOG a = 2.58 a= 4181.09
a = 376.23 b= 24.11

n= 0.50 I= a/(t+b)

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I
5 146.97 168.41 459.40 143.62 11.23 167.90
10 119.70 119.13 0.33 122.57 8.23 119.42
15 102.31 97.29 25.19 106.90 21.10 97.76
30 80.08 68.82 126.81 77.27 7.91 69.36
45 61.76 56.20 30.84 60.50 1.59 56.72
60 49.65 48.68 0.93 49.71 0.00 49.16
120 28.64 34.44 33.61 29.01 0.14 34.82
Total 677.11 50.20
I 10.62 2.89
, Ishiguro dan Sherman untuk periode ulang 2 Tahun

(log t)^2 t^0.5 Ixt^0.5 I^2xt^0.5


0.49 2.24 328.64 48300.70
1.00 3.16 378.52 45309.16
1.38 3.87 396.23 40537.53
2.18 5.48 438.62 35124.42
2.73 6.71 414.27 25584.13
3.16 7.75 384.55 19091.00
4.32 10.95 313.72 8984.33
15.27 40.16 2654.55 222931.28

CARA ISHIGURO
a= 383.03
b= 0.05

I= a/(t)^0.5+b

Ishiguro
(Ir-Ii)^2
437.86
0.08
20.72
114.95
25.40
0.23
38.24
637.49
10.31
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk peri

Intensitas
waktu (t) Ixt I^2 I^2xt log t log I log t x log I (log t)^2
Hujan (I)
5 204.14 1020.72 41675.01 208375.03 0.70 2.31 1.61 0.49
10 152.34 1523.35 23206.00 232060.02 1.00 2.18 2.18 1.00
15 134.77 2021.54 18162.72 272440.83 1.18 2.13 2.50 1.38
30 103.10 3093.01 10629.68 318890.52 1.48 2.01 2.97 2.18
45 73.76 3319.27 5440.75 244833.85 1.65 1.87 3.09 2.73
60 57.40 3443.88 3294.53 197671.80 1.78 1.76 3.13 3.16
120 31.62 3794.57 999.91 119989.60 2.08 1.50 3.12 4.32
Total 757.13 18216.34 103408.61 1594261.65 9.86 13.76 18.61 15.27

CARA SHERMAN CARA TALBOT CARA ISHIGURO


LOG a = 2.77 a= 4492.69 a=
a= 582.92 b= 17.48 b=

n= 0.57 I= a/(t+b) I=

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I (Ir-Ii)^2
5 204.14 233.86 882.94 199.88 18.20 238.70 1193.93
10 152.34 157.81 29.93 163.51 124.80 156.71 19.15
15 134.77 125.37 88.35 138.33 12.71 124.02 115.47
30 103.10 84.60 342.32 94.63 71.77 84.32 352.62
45 73.76 67.21 42.92 71.91 3.43 67.69 36.81
60 57.40 57.09 0.10 57.99 0.35 58.04 0.42
120 31.62 38.52 47.61 32.68 1.12 40.29 75.13
Total 1434.16 232.38 1793.53
I 15.46 6.22 17.29
dan Sherman untuk periode ulang 5 Tahun

t^0.5 Ixt^0.5 I^2xt^0.5


2.24 456.48 93188.15
3.16 481.73 73383.82
3.87 521.96 70343.92
5.48 564.70 58221.18
6.71 494.81 36497.68
7.75 444.60 25519.32
10.95 346.40 10953.50
40.16 3310.67 368107.56

CARA ISHIGURO
422.58
-0.47

a/(t)^0.5+b
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk perio

Intensitas
waktu (t) Ixt I^2 I^2xt log t log I log t x log I (log t)^2
Hujan (I)
5 240.10 1200.50 57647.57 288237.84 0.70 2.38 1.66 0.49
10 172.86 1728.59 29880.17 298801.70 1.00 2.24 2.24 1.00
15 155.18 2327.76 24081.99 361229.80 1.18 2.19 2.58 1.38
30 117.58 3527.32 13824.42 414732.48 1.48 2.07 3.06 2.18
45 81.31 3659.00 6611.50 297517.39 1.65 1.91 3.16 2.73
60 62.27 3736.42 3878.00 232680.02 1.78 1.79 3.19 3.16
120 33.50 4019.69 1122.08 134649.09 2.08 1.53 3.17 4.32
Total 862.80 20199.26 137045.71 2027848.31 9.86 14.11 19.06 15.27

CARA SHERMAN CARA TALBOT CARA ISHIGUR


LOG a = 2.86 a= 4739.97 a=
a= 722.44 b= 15.04 b=

n= 0.60 I= a/(t+b) I=

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I (Ir-Ii)^2
5 240.10 275.72 1268.67 236.47 13.16 285.46 2058.00
10 172.86 182.09 85.29 189.26 269.03 179.97 50.52
15 155.18 142.86 151.92 157.76 6.66 140.21 224.30
30 117.58 94.35 539.56 105.23 152.50 93.55 577.16
45 81.31 74.02 53.17 78.94 5.62 74.52 46.05
60 62.27 62.31 0.00 63.16 0.79 63.62 1.80
120 33.50 41.15 58.61 35.10 2.57 43.80 106.07
Total 2157.22 450.32 3063.92
s 18.96 8.66 22.60
an Sherman untuk periode ulang 10 Tahun

t^0.5 Ixt^0.5 I^2xt^0.5


2.24 536.88 128903.88
3.16 546.63 94489.39
3.87 601.02 93269.13
5.48 644.00 75719.44
6.71 545.45 44351.27
7.75 482.37 30038.86
10.95 366.95 12291.72
40.16 3723.29 479063.71

CARA ISHIGURO
451.03
-0.66

a/(t)^0.5+b
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk periode

waktu (t) Intensitas log t x log (log t)^2


Ixt I^2 I^2xt log t log I
Hujan (I) I
5 257.34 1286.70 66224.37 331121.83 0.70 2.41 1.68 0.49
10 182.70 1827.01 33379.61 333796.08 1.00 2.26 2.26 1.00
15 164.97 2474.60 27216.24 408243.66 1.18 2.22 2.61 1.38
30 124.52 3735.59 15505.14 465154.21 1.48 2.10 3.09 2.18
45 84.93 3821.92 7213.37 324601.43 1.65 1.93 3.19 2.73
60 64.61 3876.70 4174.67 250480.07 1.78 1.81 3.22 3.16
120 34.40 4127.64 1183.16 141978.65 2.08 1.54 3.19 4.32
Total 913.48 21150.17 154896.55 2255375.94 9.86 14.26 19.25 15.27

CARA SHERMAN CARA TALBOT CARA ISHIGURO


LOG a = 2.90 a= 4866.57 a=
a = 791.44 b= 14.14 b=

n= 0.61 I= a/(t+b) I=

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I (Ir-Ii)^2
5 257.34 295.94 1489.98 254.27 9.42 308.37 2604.21
10 182.70 193.74 121.82 201.60 357.34 191.07 70.09
15 164.97 151.21 189.36 167.01 4.15 147.90 291.39
30 124.52 98.99 651.69 110.26 203.48 97.95 705.95
45 84.93 77.26 58.81 82.29 6.98 77.79 51.00
60 64.61 64.80 0.04 65.64 1.06 66.29 2.81
120 34.40 42.42 64.44 36.28 3.55 45.49 123.10
Total 2576.14 585.97 3848.55
I 20.72 9.88 25.33
o dan Sherman untuk periode ulang 15 Tahun

t^0.5 Ixt^0.5 I^2xt^0.5


2.24 575.43 148082.19
3.16 577.75 105555.59
3.87 638.94 105408.06
5.48 682.02 84925.15
6.71 569.74 48388.72
7.75 500.48 32336.84
10.95 376.80 12960.82
40.16 3921.16 537657.37

CARA ISHIGURO
465.25
-0.73

a/
(t)^0.5+b
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk peri

Intensitas
waktu (t) Ixt I^2 I^2xt log t log I log t x log I
Hujan (I)
5 274.58 1372.91 75395.73 376978.65 0.70 2.44 1.70
10 192.54 1925.43 37072.78 370727.77 1.00 2.28 2.28
15 174.76 2621.45 30542.18 458132.71 1.18 2.24 2.64
30 131.46 3943.86 17282.26 518467.72 1.48 2.12 3.13
45 88.55 3984.84 7841.45 352865.15 1.65 1.95 3.22
60 66.95 4016.98 4482.27 268936.12 1.78 1.83 3.25
120 35.30 4235.60 1245.85 149502.45 2.08 1.55 3.22
Total 964.15 22101.07 173862.52 2495610.57 9.86 14.41 19.44

CARA SHERMAN CARA TALBOT


LOG a = 2.94 a= 4997.00
a= 861.63 b= 13.36

n= 0.62 I= a/(t+b)

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I
5 274.58 316.25 1736.14 272.22 5.60 331.55
10 192.54 205.38 164.82 213.94 457.93 202.15
15 174.76 159.55 231.43 176.22 2.12 155.57
30 131.46 103.62 775.38 115.25 262.73 102.33
45 88.55 80.49 64.92 85.63 8.55 81.05
60 66.95 67.29 0.12 68.12 1.37 68.96
120 35.30 43.70 70.63 37.47 4.73 47.19
Total 3043.44 743.02
I 22.52 11.13
t, Ishiguro dan Sherman untuk periode ulang 20 Tahun

(log t)^2 t^0.5 Ixt^0.5 I^2xt^0.5


0.49 2.24 613.99 168589.98
1.00 3.16 608.87 117234.42
1.38 3.87 676.86 118289.36
2.18 5.48 720.05 94658.82
2.73 6.71 594.02 52602.03
3.16 7.75 518.59 34719.50
4.32 10.95 386.66 13647.64
15.27 40.16 4119.03 599741.75

CARA ISHIGURO
a = 479.75
b= -0.79

I= a/(t)^0.5+b

Ishiguro
(Ir-Ii)^2
3245.56
92.36
368.55
848.55
56.27
4.04
141.55
4756.89
28.16
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk periode

Intensitas
waktu (t) Ixt I^2 I^2xt log t log I log t x log I (log t)^2
Hujan (I)
5 282.02 1410.11 79536.89 397684.44 0.70 2.45 1.71 0.49
10 196.79 1967.90 38726.25 387262.47 1.00 2.29 2.29 1.00
15 178.99 2684.81 32036.55 480548.27 1.18 2.25 2.65 1.38
30 134.46 4033.73 18078.87 542366.11 1.48 2.13 3.14 2.18
45 90.11 4055.14 8120.57 365425.53 1.65 1.95 3.23 2.73
60 67.96 4077.52 4618.38 277102.67 1.78 1.83 3.26 3.16
120 35.68 4282.18 1273.41 152809.02 2.08 1.55 3.23 4.32
Total 986.02 22511.40 182390.91 2603198.52 9.86 14.47 19.52 15.27

CARA SHERMAN CARA TALBOT CARA ISHIGURO


LOG a = 2.95 a= 5054.29 a=
a= 892.26 b= 13.05 b=

n= 0.63 I= a/(t+b) I=

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I (Ir-Ii)^2
5 282.02 325.04 1850.25 280.00 4.10 341.63 3553.38
10 196.79 210.41 185.38 219.26 505.09 206.93 102.77
15 178.99 163.14 251.03 180.18 1.42 158.86 405.01
30 134.46 105.61 832.35 117.40 290.90 104.22 914.36
45 90.11 81.89 67.71 87.07 9.29 82.46 58.64
60 67.96 68.36 0.16 69.19 1.51 70.11 4.64
120 35.68 44.25 73.41 37.99 5.30 47.93 149.96
Total 3260.29 817.62 5188.77
I 23.31 11.67 29.41
dan Sherman untuk periode ulang 25 Tahun

t^0.5 Ixt^0.5 I^2xt^0.5


2.24 630.62 177849.89
3.16 622.30 122463.15
3.87 693.22 124077.03
5.48 736.46 99022.05
6.71 604.50 54474.42
7.75 526.41 35773.80
10.95 390.91 13949.49
40.16 4204.42 627609.83

CARA ISHIGURO
486.07
-0.81

a/
(t)^0.5+b
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk peri

Intensitas
waktu (t) Ixt I^2 I^2xt log t log I log t x log I
Hujan (I)
5 319.22 1596.09 101900.23 509501.16 0.70 2.50 1.75
10 218.02 2180.22 47533.50 475334.98 1.00 2.34 2.34
15 200.11 3001.60 40042.68 600640.14 1.18 2.30 2.71
30 149.43 4483.03 22330.58 669917.50 1.48 2.17 3.21
45 97.92 4406.60 9589.19 431513.41 1.65 1.99 3.29
60 73.00 4380.15 5329.37 319761.92 1.78 1.86 3.31
120 37.63 4515.07 1415.68 169882.15 2.08 1.58 3.28
Total 1095.33 24562.75 228141.23 3176551.27 9.86 14.75 19.89

CARA SHERMAN CARA TALBOT


LOG a = 3.02 a= 5347.97
a = 1048.18 b= 11.75

n= 0.65 I= a/(t+b)

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I
5 319.22 369.16 2494.68 319.23 0.00 392.66
10 218.02 235.52 306.25 245.85 774.63 230.74
15 200.11 181.07 362.30 199.90 0.04 175.27
30 149.43 115.52 1150.06 128.09 455.70 113.62
45 97.92 88.81 82.99 94.23 13.63 89.48
60 73.00 73.70 0.49 74.53 2.34 75.88
120 37.63 47.02 88.26 40.59 8.79 51.63
Total 4485.03 1255.14
I 27.34 14.46
t, Ishiguro dan Sherman untuk periode ulang 50 Tahun

(log t)^2 t^0.5 Ixt^0.5 I^2xt^0.5


0.49 2.24 713.79 227855.85
1.00 3.16 689.45 150314.12
1.38 3.87 775.01 155084.62
2.18 5.48 818.48 122309.64
2.73 6.71 656.90 64326.22
3.16 7.75 565.47 41281.09
4.32 10.95 412.17 15508.05
15.27 40.16 4631.27 776679.58

CARA ISHIGURO
a = 518.24
b= -0.92

I= a/(t)^0.5+b

Ishiguro
(Ir-Ii)^2
5393.92
161.66
616.65
1282.33
71.38
8.28
196.03
7730.25
35.89
Perhitungan nilai tiap suku sebagai data masukkan dalam perhitungan rumus Talbot, Ishiguro dan Sherman untuk periode

waktu (t) Intensitas log t x log (log t)^2


Ixt I^2 I^2xt log t log I
Hujan (I) I
5 352.67 1763.34 124374.09 621870.45 0.70 2.55 1.78 0.49
10 237.12 2371.15 56223.62 562236.21 1.00 2.37 2.37 1.00
15 219.10 3286.48 48004.20 720063.00 1.18 2.34 2.75 1.38
30 162.90 4887.07 26537.15 796114.55 1.48 2.21 3.27 2.18
45 104.95 4722.66 11014.07 495633.17 1.65 2.02 3.34 2.73
60 77.54 4652.30 6012.19 360731.59 1.78 1.89 3.36 3.16
120 39.37 4724.50 1550.06 186007.62 2.08 1.60 3.32 4.32
Total 1193.64 26407.49 273715.39 3742656.59 9.86 14.98 20.19 15.27

CARA SHERMAN CARA TALBOT CARA ISHIGURO


LOG a = 3.08 a= 5620.07 a=
a = 1191.89 b= 10.83 b=

n= 0.66 I= a/(t+b) I=

I= a/t^n

waktu Sherman Talbot Ishiguro


I Rencana
Menit I (Ir-Is)^2 I (Ir-It)^2 I (Ir-Ii)^2
5 352.67 409.09 3183.65 354.92 5.06 439.34 7512.77
10 237.12 258.11 440.81 269.74 1064.56 252.08 223.81
15 219.10 197.15 481.57 217.54 2.44 189.95 849.69
30 162.90 124.39 1483.06 137.63 638.74 122.05 1668.91
45 104.95 95.01 98.67 100.66 18.43 95.78 84.07
60 77.54 78.48 0.89 79.34 3.25 81.07 12.46
120 39.37 49.52 102.97 42.96 12.85 54.97 243.23
Total 5791.61 1745.31 10594.94
I 31.07 17.06 42.02
o dan Sherman untuk periode ulang 100 Tahun

t^0.5 Ixt^0.5 I^2xt^0.5


2.24 788.59 278108.92
3.16 749.82 177794.70
3.87 848.57 185919.47
5.48 892.25 145349.97
6.71 704.01 73884.63
7.75 600.61 46570.25
10.95 431.29 16980.09
40.16 5015.14 924608.03

CARA ISHIGURO
547.75
-0.99

a/
(t)^0.5+b
Daerah panjang panjang (skala) lebar lebar (skala) Luas (cm2)
b1 5 5000 5 5000 25000000
b2 5 5000 2 2000 10000000
b3 8 8000 3 3000 24000000
b4 8 8000 4 4000 32000000
Total

Daerah (B) Ai (Km2) Ci L (km) S Tata Guna Lahan


B1 0.0726 0.4 0.25 0.00055 Perumahhan Perkampungan
B2 0.001 0.6 0.7 0.00055 Perumahan multi unit terpisah
B3 0.0024 0.8 0.4 0.00055 Industri Ringan
B4 0.0032 0.35 1.2 0.00055 Taman Tempat Bermain
Total 0.0091
Luas (km2) skala 1 : 1000 1000
0.0025
0.001
0.0024
0.0032
0.0091
L= 0.0091 km2

Ai L
NO. Ci S Tata Guna Lahan
KM2 KM
1 0.0025 0.4 0.25 0.00055 Perkampungan
2 0.0010 0.6 0.7 0.00055 Apartemen
3 0.0024 0.8 0.4 0.00055 Industri Ringan
4 0.0032 0.35 1.2 0.00055 Taman Bermain
Jumlah Total 0.0091

Curah Hujan Rencana


= 145 mm/jam

Debit Rencana masing - masing periode ulang ?

Ai Ai x Ci L R tc I
NO Ci S L^2
Km2 Km2 Km mm jam mm/jam
1 0.0025 0.4 0.0010 0.25 0.00055 145 0.410 91.041 0.0625
2 0.0010 0.6 0.0006 0.7 0.00055 145 0.907 53.666 0.49
3 0.0024 0.8 0.0019 0.4 0.00055 145 0.589 71.525 0.16
4 0.0032 0.35 0.0011 1.2 0.00055 145 1.373 40.694 1.44
Jumlah 0.0091 0.0046

Cdas 0.510
seingga Q 0.117 m3/det
0.87

diambil tc terbesar
B= 3.000 lebar saluran (cm)

hn A P R R^(2/3) A.R^2/3
0.125 0.389 3.352 0.116 0.238 0.093
0.130 0.407 3.368 0.121 0.244 0.099
0.135 0.423 3.382 0.125 0.250 0.106
0.300 0.990 3.848 0.257 0.404 0.400
0.000 0.000 3.000 0.000 0.000 0.000
0.000 0.000 3.000 0.000 0.000 0.000

;
B= 3.000 Q= 0.117 m3/det Q^2 = 0.014

hn A T Q^2/g A^3 A^3/T ∆


0.0600 0.184 3.120 0.001 0.006 0.002 0.001
0.0500 0.153 3.100 0.001 0.004 0.001 0.000
0.0400 0.122 3.080 0.001 0.002 0.001 -0.001
0.1170 0.365 3.234 0.001 0.049 0.015 0.014
0.0000 0.000 3.000 0.001 0.000 0.000 -0.001
0.0000 0.000 3.000 0.001 0.000 0.000 -0.001
g= 9.8
g= 9.8 A= 0.071 m2 d=

debit (lt/dt) 0 125 250 375 500 625 750


debit (m/dt) 0 0.125 0.25 0.375 0.5 0.625 0.75
tinggi tekan (m) 45 36 30 24 17 12 9
Effisiensi (%) 0 24 47 67 82 87 77
Vd (m/dt) 0.000 1.769 3.539 5.308 7.077 8.846 10.616
Kehilangan Tinggi (m) 0.000 1.597 6.389 14.374 25.554 39.928 57.497
Losses + Hs (m) 7.000 8.597 13.389 21.374 32.554 46.928 64.497

Dari grafik diperoleh nilai 69 % 0.69


efisiensi pompa nya adalah =
debit = 400 lt / dt = 0.4 m/dt
Hm = 23 m
massa jenis air = 1000

Daya (p) = 13333.333 wat


300 mm = 0.3 m KT (m) = 8*Vd2/2g Tinggi tekan statis

0
0
0 100
0
90
0.000
0.000 80
7.000
70

60
Efis
50
Ting
40 Los

30

20

10

0
0 100 200 300 400 500 600 700 800
Tinggi tekan statis = 7 m

Efisiensi
Tinggi tekan
Losses+Hs

00 800

You might also like