Commissioning Check List E

Restricted
ANSI 59
CL-E134 Overvoltage Protection
Primary Injection Tests
Panama Colon PP BB001062
Power Plant Plant Code

System: Protection/ Synchronization and Metering (Generator)

Component: CHA10-U08-F01 – generator protection

Page: 1 of 1 Appendices:

No. Activity (Items not applicable to be marked N/A) Remarks Confirmed

1. Technical data: See device coversheet

Secondary injection checklist CL-E234 available 

2. Primary tests

Excite generator up to maximum voltage limit in AVR, mode


Record Phase voltages

UL1-E [V]
UL2-E [V]

UL3-E [V]
UL1-L2 [V]
UL1-L3 [V]
UL2-L3 [V]

U> set 126.5V, time delay 3 sec.

3. Evaluation

Margin to U>set acceptable (>3%) 

4. Remarks:

......................................................................................................................................................................................... 1

......................................................................................................................................................................................... 2

Department: ........................................................ Name: .......................................................................

Date:. ...................................................................... Signature: .............................................................

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization


of its content and communication thereof to others without express authorization are prohibited.
Project Site Execution Offenders will be held liable for payment of damages. All rights created by patent grant or
registration of a utility model or design patent are reserved.

You might also like