Professional Documents
Culture Documents
Tidal Turbine Project Scheduling
Tidal Turbine Project Scheduling
moment Diagrams
Contents:
• Moment and Bending moment
• What the Bending Moment does to the
Beam
• Sign convention for bending moments
• WHY WE DRAW BMD (APPLICATIONS)
• Technique to find BMD
Moment and Bending moment
How much
How much deflection? tensile stress?
Sign convention for bending moments:
The bending moment is considered as Sagging
Bending Moment if it tends to bend the beam to a
curvature having convexity at the bottom as
shown in the Fig. given below. Sagging Bending
Moment is considered as positive bending
moment.
Convexity