RFI SUMMARY

Name of the Project: Two / Four Laning Of BRT Tiger Reserve Boundary To Banglore Section Of NH-209 (Existing Chainage From Km.287.520 To Km.461.550) In the State Of Karnataka On Hybrid
Annuity Mode Under NHDP Phase – IV
Client National Highway Authority of India
Independent Engineer TPF Getinsa Eurostudios S.L. in association with Segmental Consulting & Infrastructure Advisory Pvt Ltd.,
Concessionaire Sadbhav Bangalore Highway Private Limited
EPC Contractor Sadbhav Engineering Limited
Date Chainage
Sl.No. RFI No. Description of Work (Section II) Side Time Contact Person Contact no. Remarks
Submission Inspection From To
Structures
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
1 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 650 HAUNCH PORTION 352+424 BC BHS 10:30 AM MR. B.Rajesh 944027899

6-Aug-18 7-Aug-18 SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR


2 BRT/SEC-II/STR 651 WALL 1st LIFT 352+424 BC BHS 12:30 PM " "

SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR


3 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 652 R/WALL A1 SIDE RAFT 353+609 BC BHS 2:00 PM " "

4 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 653 POURING OF CRADLE CONCRETE 366+146 HPC LHS 10:00 AM " "

6-Aug-18 7-Aug-18 SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR


5 BRT/SEC-II/STR 654 ENCASING SLAB 366+146 HPC LHS 11:30 AM " "

6 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 655 PIPE LAYING & JOINTING 366+146 HPC RHS 1:00 PM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
7 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 656 HEAD WALL 2nd LIFT 366+146 HPC RHS 2:30 PM " "

6-Aug-18 7-Aug-18 SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR


8 BRT/SEC-II/STR 657 TOP SLAB 370+965 HPC RHS 4:00 PM " "

9 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 658 POURING OF CONCRETE FOR PIPE BED PCC 372+210 HPC LHS 11:00 AM " "
10 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 659 PIPE LAYING & JOINTING 372+210 HPC LHS 12:30 PM " "

6-Aug-18 7-Aug-18 SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR


11 BRT/SEC-II/STR 660 HEAD WALL 2nd LIFT 372+210 HPC LHS 3:00 PM " "

12 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 661 POURING OF CONCRETE FOR R2/WALL PCC 377+636 BHS 10:30 AM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
13 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 662 R/WALL A1 & A2 SIDE 3rd LIFT 338+670 MNB LHS 2:00 PM " "

14 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 663 LAYOUT MARKING AND OGL CHECKING 340+040 VUP BHS 11:00 AM " "
15 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 664 LEVEL CHECKING FOR EXCAVATION 340+040 VUP BHS 1:00 PM " "
16 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 665 POURING OF CONCRETE FOR PCC 340+040 VUP BHS 3:00 PM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
17 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 666 R/WALL A1 SIDE RAFT 353+609 BC BHS 4:30 PM " "

Highways Contact Person Contact no.


1 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1134 LEVEL AND FDD CHECING OF SG TOP LAYER 377+700 378+000 RHS 10:00 AM Mr.Biddappa 7625086409
2 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1135 FDD CHECKING OF EARTHEN SHOULDER 366+750 367+000 LHS 11:30 AM " "
3 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1136 LAYING LEVEL AND FDD CHECKING OF WMM TOP LAYER 366+750 367+000 LHS 1:00 PM " "
4 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1137 C & G 367+600 368+000 RHS 10:00 AM " "
5 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1138 FDD CHECKING OF EARTHEN SHOULDER 378+500 379+000 RHS 2:00 PM " "
6 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1139 LAYING LEVEL AND FDD CHECKING OF WMM TOP LAYER 378+500 379+000 RHS 3:00 PM " "
7 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1140 LEVEL AND FDD CHECKING OF OGL 367+800 368+000 RHS 11:30 AM " "
8 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1141 C & G 375+500 376+000 RHS 1:30 PM " "
9 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1142 C & G 377+000 377+500 RHS 2:30 PM " "
10 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1143 EXCAVATION UP TO SG 1st LAYER 375+600 375+800 RHS 3:30 PM " "
11 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1144 LEVEL AND FDD CHECKING OF SG TOP LAYER 375+600 375+800 RHS 4:00 PM " "
12 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1145 FDD CHECKING OF EARTHEN SHOULDER 361+000 361+310 RHS 11:00 AM " "
13 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1146 LAYING LEVEL AND FDD CHECKING OF WMM TOP LAYER 361+000 361+310 RHS 1:00 PM " "
14 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1147 C & G 368+000 369+000 RHS 12:00 PM " "
15 6-Aug-18 7-Aug-18 BRT/SEC-II/HW 1148 EXCAVATION UP TO SG 1st LAYER 368+000 368+400 RHS 2:00 PM " "
SUR
1 6-Aug-18 7-Aug-18 BRT/SEC-II/SUR " "
LAB
1 6-Aug-18 7-Aug-18 BRT/SEC-II/LAB Mr. DIPANKAR SARKAR 8618346246

For For