Name of the Project: Two / Four Laning Of BRT Tiger Reserve Boundary To Banglore Section Of NH-209 (Existing Chainage From Km.287.520 To Km.461.550) In the State Of Karnataka On Hybrid
Annuity Mode Under NHDP Phase – IV
Client National Highway Authority of India
Independent Engineer TPF Getinsa Eurostudios S.L. in association with Segmental Consulting & Infrastructure Advisory Pvt Ltd.,
Concessionaire Sadbhav Bangalore Highway Private Limited
EPC Contractor Sadbhav Engineering Limited
Date Chainage
Sl.No. RFI No. Description of Work (Section II) Side Time Contact Person Contact no. Remarks
Submission Inspection From To
Structures
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
1 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 650 HAUNCH PORTION 352+424 BC BHS 10:30 AM MR. B.Rajesh 944027899
4 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 653 POURING OF CRADLE CONCRETE 366+146 HPC LHS 10:00 AM " "
6 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 655 PIPE LAYING & JOINTING 366+146 HPC RHS 1:00 PM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
7 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 656 HEAD WALL 2nd LIFT 366+146 HPC RHS 2:30 PM " "
9 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 658 POURING OF CONCRETE FOR PIPE BED PCC 372+210 HPC LHS 11:00 AM " "
10 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 659 PIPE LAYING & JOINTING 372+210 HPC LHS 12:30 PM " "
12 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 661 POURING OF CONCRETE FOR R2/WALL PCC 377+636 BHS 10:30 AM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
13 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 662 R/WALL A1 & A2 SIDE 3rd LIFT 338+670 MNB LHS 2:00 PM " "
14 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 663 LAYOUT MARKING AND OGL CHECKING 340+040 VUP BHS 11:00 AM " "
15 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 664 LEVEL CHECKING FOR EXCAVATION 340+040 VUP BHS 1:00 PM " "
16 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 665 POURING OF CONCRETE FOR PCC 340+040 VUP BHS 3:00 PM " "
SHUTTRING CHECKING REINFORCEMENT AND POURING OF CONCRETE FOR
17 6-Aug-18 7-Aug-18 BRT/SEC-II/STR 666 R/WALL A1 SIDE RAFT 353+609 BC BHS 4:30 PM " "