Nil

12. Special requirements for hill roads


S. No. Design Km (From) Design Km (To) LHS/RHS
Nil

13. Change of Scope


The length of Structures and bridges specified hereinabove shall be treated as an
approximate assessment. The actual lengths as required on the basis of detailed
investigations shall be determined by the Contractor in accordance with the
Specifications and Standards. Any variations in the lengths specified in this Schedule-B
shall not constitute a Change of Scope, save and except any variations in the length
arising out of a Change of Scope expressly undertaken in accordance with the provisions
of Article 13.

14. Applicable Stretches of Typical Cross-section


Design Chainage (km)
S.No. Type
From To
1 267+500 273+382 TCS-2
3 273+382 273+722 TCS-3
4 273+722 279+995 TCS-2
5 279+995 281+030 TCS-3
6 281+030 283+090 TCS-2
7 283+090 284+100 TCS-3
8 284+100 286+260 TCS-2
9 286+260 286+380 TCS-1
10 286+300 286+780 TCS-2
11 286+780 286+860 TCS-1
12 286+860 288+240 TCS-2
13 288+240 288+780 TCS-1
14 288+780 289+400 TCS-2
15 289+400 289+575 TCS-1
16 289+575 290+635 TCS-3
17 290+635 293+040 TCS-2
18 293+040 293+300 TCS-3
19 293+300 295+915 TCS-2

15. Typical Cross Sections


Following Typical Cross Sections are enclosed. Start and end of the stretches
(Chainages) are indicated on the drawings: