FOUNDATIONS FOR
STRUCTURES
61.02 EXCAVATION:
(i) 0 m UP TO 2 m
2*5.75*6.2*0.8 (abutments) m3 57.04
4*6.505*5.17*0.8 (retaining walls) m3 107.62
1*8.3*3.6*0.8 (piers) m 3
23.90
188.56 12,000
(ii) 2 m UP TO 4 m
2*5.75*6.2*0 (abutments) m3 0.00
4*6.505*5.17*0 (retaining walls) m 3
0.00
1*8.3*3.6*0 (piers) m3 0.00
0.00 12,000
61.04 BACKFILL TO
EXCAVATIONS UTILISING:
FALSEWORK, FORMWORK
AND CONCRETE FINISH
STEEL REINFORCEMENT
FOR STRUCTURES
18.11 900,000
NO-FINES CONCRETE;
JOINTS; BEARINGS;
PARAPETS AND DRAINAGE
FOR STRUCTURES
66.14 DOWELS/GUIDES
25 mm DIAMETER X 775 mm LONG
2*12 no 24.00 50,000
TOTAL - STRUCTURES
Total Amount
57.04
23.90
2,262,753
28
28
-
-
-
53,698,200
146,728,890
42,372,350
294,548,827
16,302,195
468,954,638
139,519,500
2,616,600
698,625
324,000
5,750,000
1,200,000
59,500,000
363,000
1,234,839,578
T16 UNIT T20 UNIT T32 UNIT T40
261.855 m
2582.938 kg 7092.96 kg
T16 T20 T25
3976.81 kg
T12 T16 T32
11134.22 kg
T16 T20 T32
18533.11 kg
T16 T20