PROJECT : TUGU TANI APARTMENT

SUBJECT : MEP DESIGN CONCEPT (R3)


DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

I DATA
A APARTMENT
TOWER 1
Apartment
- 2 Bedroom 58 unit 167.71 m2
- 2 Bedroom + 1 58 unit 252.75 m2
- Penthouse 2 unit 177.49 m2
118 Total Unit 24,741.66 Total m2
Total Area 24,741.66 Total m2
- Classification Mid - High Class
- Occupancy (Assume) 80 %
- Population (Assume) 4 Person for 2 Bedroom
5 Person for 2 Bedroom + 1
7 Person for Penthouse
18.6 m2/person Public Area
536 Total Population
TOWER 2
Apartment
- 2 Bedroom 58 unit 167.71 m2
- 2 Bedroom + 1 58 unit 252.75 m2
- Penthouse 2 unit 177.49 m2
118 Total Unit 24,741.66 Total m2
Total Area 24,741.66 Total m2
- Classification Mid - High Class
- Occupancy (Assume) 80 %
- Population (Assume) 4 Person for 2 Bedroom
5 Person for 2 Bedroom + 1
7 Person for Penthouse
18.6 m2/person Public Area
536 Total Population
TOWER 3
Apartment
- 2 Bedroom 58 unit 167.71 m2
- 2 Bedroom + 1 58 unit 252.75 m2
- Penthouse 2 unit 177.49 m2
118 Total Unit 24,741.66 Total m2
Total Area 24,741.66 Total m2
- Classification Mid - High Class
- Occupancy (Assume) 80 %
- Population (Assume) 4 Person for 2 Bedroom
5 Person for 2 Bedroom + 1
7 Person for Penthouse
18.6 m2/person Public Area
536 Total Population

MEP DESIGN CONCEPT Page 1 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP DESIGN CONCEPT (R3)
DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

B BASEMENT
- Area
* Basement 1 5,469.29 m2
* Basement 2 5,469.29 m2
* Basement 3 5,469.29 m2
* Cores 438.66 m2
* Lobbies 289.80 m2
TOTAL BASEMENT 17,136.33 m2
* Parking 571.00 lots

C BUILDING
- Total Area 91,361.31 m2
- Building Height
* Apartment Tower 1 32 Floors
* Apartment Tower 2 32 Floors
* Apartment Tower 3 32 Floors
* Basement 3 Floors

II AIR CONDITIONING
1 SYSTEM
- Apartment Split Duct Standard / Multi Split
- Core Split Duct VRV (No Space fo Outdoor every Floor)
- Public Area Split Duct Standard / Multi Split
2 DESIGN TEMPERATURE
- Apartment 22 ± 2 ºC
- Public Area 24 ± 2 ºC
3 AC UNIT LOCATION
- Outdoor Service yard
- Indoor Unit Corridor
4 AC UNIT CAPACITY
Tower 1, 2 & 3
- 2 Bedroom 8 PK 116.59 m2 600
- 2 Bedroom + 1 12 PK 176.94 m2 600
- Penthouse 20 PK 224.79 m2 800

III PLUMBING
1 COLD WATER
A SYSTEM
- 4th Top Floor Booster Pump w/ VSD All Pumps
- Rest Floor Gravity
B DESIGN PRESSURE
- Apartment 1.5 - 4.0 Bar
- Public Area 1.5 - 4.0 Bar
C WATER PIPE & METERING
- 2 Bedroom & 2 Bedroom + 1 20/15 mm 40 lpm flow rate
- 3 Bedroom & 3 Bedroom + 1 25/20 mm 60 lpm flow rate
- Penthouse 32/25 mm 80 lpm flow rate
- Water Meter Location Centralized at Service Yard

MEP DESIGN CONCEPT Page 2 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP DESIGN CONCEPT (R3)
DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

D GWT CAPACITY
- Domestic Water
* Apartment 322 M3 (200 Ltr/Person/day)
* Building Management 32 M3 (10% of usage)
TOTAL DOMESTIC WATER 354 M3/day
E SPACE REQUIRED
- Pump Room 8 x 5 x 3.5 (LxWxH) M
- GWT Water Elevation 5.0 M2 (B2+B3 Floors)
- GWT Area 70.0 M2

2 HOT WATER
A SYSTEM
- System Heating (60ºC) Electric Hot Water Heater (Individual each unit Apt)
B HOT WATER SERVICE
- Facilities Lavatory, shower
- Apartment Lavatory, Shower, Bathtub, Pantry
C STORAGE CAPACITY
- Capacity 100 Liters for 4 Bedroom/Penthouse
50 Liters for 2 Bedroom
D HOT WATER LOCATION
- Unit HWH at yard

3 STP
A SYSTEM
- STP Type Extended Aeration (EA)
- Recycling Sand & Carbon Filter (For Irrigation only)
B STP CAPACITY
- Capacity 290 M3 (80% of Domestic Water)
C SPACE REQUIRED
- Area 249 M2
- Height 5 M (B2+B3 Floors)

4 SWIMMING POOL
A SYSTEM
- System Over flow --> Main Pool
- Turn Over 7 hour
B SPACE REQUIRED
- Balancing Tank TBA M3 (Waiting pool area)
- Pump Room 5 x 4 x 2 (LxWxD) M

III FIRE FIGHTING


A SYSTEM PROVIDED
- Fire Hydrant 800 m2/ IHB
- Fire Sprinkler Ordinary Hazzard 12 m2/sprinkler (Parking Area)
- Fire Sprinkler Light Hazzard 21 m2/sprinkler (All Area Exclude Parking)
- PFE 200 m2/ PFE
B PUMP SYSTEM
- Electric Pump 1250 gpm 210 m (NFPA 20)
- Diesel Pump 1250 gpm 210 m (NFPA 20)
- Jockey Pump 20 gpm 230 m
C FIRE WATER STORAGE

MEP DESIGN CONCEPT Page 3 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP DESIGN CONCEPT (R3)
DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

- Capacity 284 M3 (60 minutes duration)


D SPACE REQUIRED
- Pump Room 5 x 5 x 3.5 (LxWxH) M
- GWT Water Elevation 2.0 M2 (1 Floors)
- GWT Area 141.0 M2

IV LIFT
1 PASSENGER LIFT
A DESIGN PARAMETER
- Type Private Lift
- Waiting Time 50 - 70 Second
- 5% Handling Capacity 5-7%
B LIFT DESIGN
- Quantity 12 Unit
- Capacity 15 Person
- Speed 210 mpm
C LIFT PERFORMANCE
- Waiting Time 168.06 Second
- 5 Minutes Handling Capacity 15.61 %
D DIMENSION
- CAR LIFT 1,600 x 1,500 mm
- HOISTWAY 2,100 x 2,200 mm
- PIT 3,000 mm
- OVERHEAD 6,000 mm
- M/C ROOM Height 2,600 mm

2 SERVICE/FIRE LIFT
A DESIGN PARAMETER
- Travel Speed 60 Second from Basement to Top Floor
- Capacity 2 m2 Floor Area
B LIFT DESIGN
- Quantity 3 Unit
- Capacity 1600 kg
- Speed 120 mpm
C DIMENSION
- CAR LIFT 1,100 x 2,100 mm
- HOISTWAY 2,000 x 2,500 mm
- PIT 2,100 mm
- OVERHEAD 5,500 mm
- M/C ROOM Height 2,600 mm

MEP DESIGN CONCEPT Page 4 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP DESIGN CONCEPT (R3)
DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

V ELECTRICAL
A SYSTEM
- PLN Medium Voltage (20 kV)
- User Low Voltage (220 V)
B UNIT POWER CONNECTED
Standard Connection
* 2 Bedroom 7,040 VA 32 A/220V/NYY 3x10mm2
* 2 Bedroom + 1 8,800 VA 40 A/220V/NYY 3x10mm2
* Penthouse 17,600 VA 80 A/220V/NYY 3x25mm2
Upgrade Connection (Cable Size Base)
* 2 Bedroom 8,800 VA 40 A/220V/NYY 3x10mm2
* 2 Bedroom + 1 11,000 VA 50 A/220V/NYY 3x10mm2
* Penthouse 22,000 VA 100 A/220V/NYY 3x25mm2
kWH Meter
- Type Electronic with analog counter, Billing System
- Location Centralized at Service Corridor
C POWER REQUIRED
- Apartment Tower 1 1,732 kVA 70 VA/m2
- Apartment Tower 2 1,732 kVA 70 VA/m2
- Apartment Tower 3 1,732 kVA 70 VA/m2
- Parking 171 kVA 10 VA/m2
TOTAL CAPACITY 5,367 kVA
OCCUPANCY 80% 4,374 kVA
PLN Connection 5,190 kVA
D TRANSFORMER 5,467 kVA (80% effective capacity)
- Apartment Tower 1 2,000 kVA
- Apartment Tower 2 2,000 kVA
- Apartment Tower 3 2,000 kVA
E GENSET
Genset Backup 80%
Genset Load 3,499 kVA
Genset Capacity 4,374 kVA (80% effective capacity)
Genset Selection 3 x 1,500 kVA
F FUEL TANK
Daily Tank 3,000 Liters (3 hours usage)
Storage Tank 40,000 Liters (3 days usage)
G LIGHTNING PROTECTION
- Type Electrostatic Non Radioactive + Conventional
- Covered Area 100 m Radius + Farraday Cage
H SPACE REQUIRED
- Genset Room 12 x 12 x 5.5 (LxWxH) M at B1+B2
- Fuel Tank 8x7 x 3.5 (LxWxH) M at B2, Near Genset
- Main MVDP 6 x 3.5 x 3.5 (LxWxH) M at B1
- MV & Transformer Tower 7 x 3.5 x 3.5 (LxWxH) M at B1 each Tower, near core
- LVMDP Tower 7 x 3.5 x 3.5 (LxWxH) M at B1 each Tower, near core
- Panel Room 2x2 x 3.0 Each Floor

MEP DESIGN CONCEPT Page 5 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP DESIGN CONCEPT (R3)
DATE : 16 SEPT 2013
ISSUED FOR : DESIGN CONCEPT STAGE
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

VI ELECTRONIC
A FIRE ALARM SYSTEM
- System Full Addressable
- Type Smoke Detector, Heat Detector & Gas Detector
- Zone 1 Zone / Unit Apartment + 1 Public Corridor

B TELECOMMUNICATION SYSTEM
1 Building Management
- Type PABX / Key Telephone
- Extension Capacity 100 Extension
- PTT Line Capacity 10 Line (10% of Extension)
2 Apartment
- Type Direct Line
- Capacity 2 Line
- Outlet Telephone Living Room, Family Room, Master Bedroom

3 Total Line 718 Line

C SOUND SYSTEM
- Function Evacuation Paging (Room)
Background Music (Public Area)

D CCTV
- Type IP Base Camera
- Capacity 1 Month storage duration, 5pps quality
- Area Coverage Main Lobby, Car Lift (Optional), Public Corridor,
Entrance/Exit Parking, Car Parking, Utility Area

E ACCESS CONTROL
- Type Proximity
- Accessibility Main Lobby, Car Lift

F MATV
- Type Free TV, Local Channel
Paid TV, Indovision/Cablevision 50 Channel
- Service Unit Apartment, Main Lobby Lift, Restaurant, Canteen
- TV Outlet Living Room, Family Room, Bedroom

G DATA & INTERNET


- Wifi Public Area
- Cabling Cat 5e Apartment & Management Office
- Data Outlet Living Room, Study Room

H VIDEOPHONE
- Type Videophone

I SPACE RQUIRED
- Fire Command Center (FCC) Room 3 x 4 x 3 (LxWxH) M at Ground Floor
- Control Room 6 x 4 x 3 (LxWxH) M at BOH

MEP DESIGN CONCEPT Page 6 of 14


Project : TUGU TANI APARTMENT
Subject : Traffic Analysis
Date : 16 SEPT 2013
Prepared by : PT. Skemanusa Consultama Teknik

FLOOR TRAFFIC NUMBER OF NUMBER OF POPULATION LIFT USER


NO DESCRIPTION OPENING TOTAL PERSON
HEIGHT (M) LEVEL (M) UNIT BEDROOM (Person/bed) (%)
A DATA
1 Level 31 4.000 110.000 1 1 3 1.50 80% 4
2 Level 30 3.500 106.500 1 1 3 1.50 80% 4
3 Level 29 3.500 103.000 1 1 3 1.50 80% 4
4 Level 28 3.500 99.500 1 1 3 1.50 80% 4
5 Level 27 3.500 96.000 1 1 3 1.50 80% 4
6 Level 26 3.500 92.500 1 1 3 1.50 80% 4
7 Level 25 3.500 89.000 1 1 3 1.50 80% 4
8 Level 24 3.500 85.500 1 1 3 1.50 80% 4
9 Level 23 3.500 82.000 1 1 3 1.50 80% 4
10 Level 22 3.500 78.500 1 1 3 1.50 80% 4
11 Level 21 3.500 75.000 1 1 3 1.50 80% 4
12 Level 20 3.500 71.500 1 1 3 1.50 80% 4
13 Level 19 3.500 68.000 1 1 3 1.50 80% 4
14 Level 18 3.500 64.500 1 1 3 1.50 80% 4
15 Level 17 3.500 61.000 1 1 3 1.50 80% 4
16 Level 16 3.500 57.500 1 1 3 1.50 80% 4
17 Level 15 3.500 54.000 1 1 3 1.50 80% 4
18 Level 14 3.500 50.500 1 1 3 1.50 80% 4
19 Level 13 3.500 47.000 1 1 3 1.50 80% 4
20 Level 12 3.500 43.500 1 1 3 1.50 80% 4
21 Level 11 3.500 40.000 1 1 3 1.50 80% 4
22 Level 10 3.500 36.500 1 1 3 1.50 80% 4
23 Level 9 3.500 33.000 1 1 3 1.50 80% 4
24 Level 8 3.500 29.500 1 1 3 1.50 80% 4
25 Level 7 3.500 26.000 1 1 3 1.50 80% 4
26 Level 6 3.500 22.500 1 1 3 1.50 80% 4
27 Level 5 3.500 19.000 1 1 3 1.50 80% 4
28 Level 4 3.500 15.500 1 1 3 1.50 80% 4
29 Level 3 3.500 12.000 1 1 3 1.50 80% 4
30 Level 2 3.500 8.500 1 1 3 1.50 80% 4
31 Level 1 3.500 5.000 1 1 - - - -
32 Ground Floor 5.000 0.000 1 1 - - - -
33 Basement 1 3.000 -3.000 1 1
34 Basement 2 3.000 -6.000 1 1 - - - -
Project : TUGU TANI APARTMENT
Subject : Traffic Analysis
Date : 16 SEPT 2013
Prepared by : PT. Skemanusa Consultama Teknik

FLOOR TRAFFIC NUMBER OF NUMBER OF POPULATION LIFT USER


NO DESCRIPTION OPENING TOTAL PERSON
HEIGHT (M) LEVEL (M) UNIT BEDROOM (Person/bed) (%)
TOTAL 116.000 34 34 90 120
B PROGRAM INPUT
1 Population 120 persons
2 Number of floor 34 floor
3 Number of stop/open 34 floor
4 Floor length 116.00 m
5 Travel distance 110.00 m
6 Express travel 0.00 m
7 unit/group 1 units
8 Door width 900 mm
9 Speed 210 mpm
10 Capacity 15 persons

C PROGRAM OUTPUT
1 Average Waiting Time (WT) 168.06 (Standard 50 - 70 detik) --> LESS
2 5 Minutes Handling Capacity (HC) 15.61 (Standard 5 - 7%) --> OK
PREPARED CHECKED APPROVED

LG Industrial Systems Co., Ltd. LG Industrial Systems Co., Ltd.


Ⅲ ALL FLOOR FREE Project: TUGU TANI
LIFT TRAFFIC ANALYSIS FOR
LIFT TRAFFIC ANALYSIS MAIN SPECIFICATION
APARTMENT, DEPARTMENT BLDG Model: PASSENGER
FOR APARTMENT,HOTEL, No. of elevators: 1 Bldg: APARTMENT
DEPARTMENT BLDG Rated speed (mpm) 210 ◆ 5 Minute Handling
SL Rated Load (person 15 Capacity
Recommended 5 Minute Handling Capacity 7%
No. of stops: 34 5 Minute Handling Capacity 15.61%
SL (Travel ; m): 110
Running open: Yes
Entrance type: Center OP 30%
PROJECT: TUGU TANI APARTMENT Opening (W ; mm): 900
25%
MODEL: PASSENGER Bldg: Population (person) 120
Floor area (m^2): NA 20%
55 Minute
Minute Recommended 5
Handling
Handling 15% 16% Minute Handling
( Run : 08-Aug-18 16:37 ) symbol ( unit ) formula result Capacity
Capacity Capacity
10% 7%
No. of elevator(s) n 1 Data for calculation: 5 Minute Handling
Capacity
Elevator speed V (m/sec) Rated speed / 60 3.5 5%
No. of passengers ru (person) 6
0%
rd (person) 4.5
No. of expected stops in local fLu N ( 1 - ( ( N - 1 ) / N ) ^ ru ) 5.55 N: 32
service section fLd N ( 1 - ( ( N - 1 ) / N ) ^ rd ) 4.26
No. of stop(s) in express service section fE 0 0 ◆ Average Waiting Interval
No. of expected stops in the entire section F fLu + fLd 9.81 Recommended Average Waiting Interval 70 (sec)
Average running distance in Su (m) SL / fLu 19.819 Average Waiting Interval 168.06 (sec)
local service section Sd (m) SL / fLd 25.821
Minimum running distance 2Sa (m) 14.7 Sa: 7.35 168 (sec)
Su < 2Sa tru x fLu 0 tru: 9.631 c) 70 (sec)
(se
80 ec)
Ru nning Time

Sd < 2Sa trd x fLd 0 trd: 10.886


Local Average (s
Su >= 2Sa Tr (sec) SL / V + ta x fLu 54.738 ta: 4.2 Waiting 70 ec)
Interval (s
Sd >= 2Sa SL / V + ta x fLd 49.32 60 ec)
(sec) (s Recommended Average
express 0 0 tpd: 3.25
50 ec) Waiting Interval
Door-opening & closing time Td (sec) td x F 22.563 td: 2.3 (s
40 ec) Average Waiting Interval
Passenger entrance & exit time Tp (sec) ru x tpu + rd x tpd 35.625 tpu: 3.5 (s
30 ec)
Time loss Tl (sec) tl x (Td + Tp) 5.818 tl: 0.1 (s
One round trip time RTT (sec) Tr + Tp + Td + Tl 168.064 20 ec)
(s
10 ec)
Average waiting interval Tav (sec) RTT / n 168.06 (s
0
5-minute capacity of each elevator's P' (person) 5 x 60 x (ru+rd) / RTT 18.742 Legend:
5-minute capacity of all elevators' P (person) P' x n 18.742 N: no. of floors in local section
Floor area Fa (M^2) NA Sa: accelerated (decelerated) dist. ◆Evaluation of Traffic Analysis
Rental ratio Rr NA tl: time loss
Evaluation
Effective floor area of each floor Ef (M^2) NA ta: accelerated (decelerated) time
door -opening & closing time per
Area occupied by one person Ao (M^2) NA td:
one stop

tpu:
average entrance & exit time per
Floor population Fp (person) NA passenger
tpd:

Total building population Q (person) 120 tru: up running time

5-minute handling capacity CC (%) P / Q x 100 15.61 trd: down running time
PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP SPACE REQUIREMENT
DATE : 13 FEBRUARY 2013
ISSUED FOR : INFORMATION

EQUIPMENT DIMENSION SPACE REQUIRED


NO SYSTEM CAPACITY UNIT LOCATION
L (M) W (M) H (M) Dia (M) L (M) W (M) H (M)

1 GROUND WATER TANK (DOM) 8.00 9.00 5.00 - 8.00 9.00 6.00 Basement 3 & 4
- Capacity 354 m3

2 GROUND WATER TANK (FIRE) 8.00 18.00 2.00 - 8.00 18.00 3.00 Basement 1
- Capacity 284 m3

3 ROOF TANK
- Apartment Tower 1 15 m3 4.00 2.50 1.50 4.00 3.00 2.00 Roof (Open Space)
- Apartment Tower 2 25 m3 4.00 3.13 2.00 4.00 4.00 2.50 Roof (Open Space)
- Apartment Tower 3 25 m3 4.00 3.13 2.00 4.00 4.00 2.50 Roof (Open Space)

4 PUMP ROOM (DOMESTIC) 8.00 5.00 3.50 Basement 4


- Filter Pump 2 set 0.60 0.30 0.40 -
- Sand Filter 1 set - - 1.50 0.60
- Carbon Filter 1 set - - 1.50 0.60
- Water Softener 1 set
- Transfer Pump 6 set 0.75 0.40 0.50 -

5 PUMP ROOM (FIRE) 5.00 5.00 3.50 Min. at Basement 1


- Electric Fire Pump 1 set 2.00 1.20 1.20 - (By Regulation)
- Diesel Fire Pump 1 set 2.50 1.20 1.50 -
- Jockey Pump 1 set 0.30 0.30 0.60 -

6 STP 290 m3/day 16.00 5.18 6.00 - 16.00 6.00 7.00 Basement 3 & 4

7 POOL PUMP ROOM


a Balancing Tank 5 m3 2.00 2.50 1.00 - 2.00 3.00 1.50 Beside pool
b Pump Room 3.00 4.00 1.80 Beside pool
- Circulation Pump 2 set 0.75 0.40 0.50 -
- Sand Filter 2 set 0.90 0.60

8 ELECTRICAL
Ground Floor Only
a PLN Sub Station 1,110 kVA 3.50 7.50 3.50 5.50 9.50 4.00 Accessible for PLN
-
Vehicle
b Main MV Panel 4.00 1.20 2.20 - 5.20 3.00 3.50 Basement 1

394101394.xls MEP REQUIREMENT Page 11 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP SPACE REQUIREMENT
DATE : 13 FEBRUARY 2013
ISSUED FOR : INFORMATION

EQUIPMENT DIMENSION SPACE REQUIRED


NO SYSTEM CAPACITY UNIT LOCATION
L (M) W (M) H (M) Dia (M) L (M) W (M) H (M)
c Transformer & MV Panel Tower 1 3.50 2.50 2.20 - 7.00 3.50 3.50 Basement 1 Tower 1
d LV Panel Tower 1 5.00 1.20 2.20 - 7.00 3.50 3.50 Basement 1 Tower 1
e Transformer & MV Panel Tower 2 3.50 2.50 2.20 - 7.00 3.50 3.50 Basement 1 Tower 2
f LV Panel Tower 2 6.00 1.20 2.20 - 7.00 3.50 3.50 Basement 1 Tower 2
g Transformer & MV Panel Tower 3 3.50 2.50 2.20 - 7.00 3.50 3.50 Basement 1 Tower 3
h LV Panel Tower 3 6.00 1.20 2.20 - 7.00 3.50 3.50 Basement 1 Tower 3
i Floor Panel Room 0.80 0.60 1.80 2.00 2.00 3.00 Every Floor
j Genset 3 x 1700 kVA 6.00 2.50 2.50 - 12.00 12.00 5.50 Basement 1 & 2
g Fuel Storage 2 x 25,000 Ltr 6.00 3.00 2.50 8.00 7.00 3.50 Basement 2

394101394.xls MEP REQUIREMENT Page 12 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP SPACE REQUIREMENT
DATE : 13 FEBRUARY 2013
ISSUED FOR : INFORMATION

EQUIPMENT DIMENSION SPACE REQUIRED


NO SYSTEM CAPACITY UNIT LOCATION
L (M) W (M) H (M) Dia (M) L (M) W (M) H (M)
9 ELECTRONIC
a Fire Command Center (FCC) 3.00 4.00 3.00 Ground Floor Only
Fire Alarm (Annunciator) 1 set 0.60 0.30 0.80 - (By Regulation)
Sound System (Paging Evacuation) 1 set 0.60 0.40 1.20 -
b Control Room 6.00 4.00 3.00 BOH Area
Fire Alarm 1 set 0.60 0.30 0.80 -
PABX 1 set 0.80 0.40 0.80 -
Sound System 1 set 0.60 0.40 1.20 -
MATV 1 set 1.20 0.40 1.20 -
CCTV 1 set 0.60 0.30 0.80 -
Data 1 set 0.60 0.30 1.20 -

10 LIFT
a Passenger (15 person, 150 mpm) 1 set/Unit Apt Private, Gearless
- Car 1.60 1.50 2.30
- Hoistway 2.10 2.20 -
- Overrun 5.50
- Pit 2.40
- Machine Room 2.60 4.20 2.60
b Service/Fire (1000 kg, 105 mpm) 1 set/Tower Public, Gearless
- Car 1.10 2.10 2.30
- Hoistway 2.30 2.60 -
- Overrun 5.00
- Pit 2.10
- Machine Room 2.80 4.60 2.40

394101394.xls MEP REQUIREMENT Page 13 of 14


PROJECT : TUGU TANI APARTMENT
SUBJECT : MEP SHAFT
DATE : 16 SEPT 2013
PREPARED BY : PT SKEMANUSA CONSULTAMA TEKNIK

ACH
Room Size Tinggi (m) Shaft Size
(times) Lantai yg Air Flow Air Flow Air Flow Velocity
NO DESCRIPTION Area (m2) Location
Panjang dilayani (CMH) (CFM) (CMS) (m/s) Length Width
Lebar (m) m2/org CFM/ org
(m) (m) (m)

A VAC

1 Smoke Extract Shaft (SES) Typical 16.00 2.00 3.00 9.00 30.00 25,920 15,256 7.20 8.00 0.90 0.95 0.95

2 Smoke Free Shaft (SFL) Typical 4.00 3.00 3.00 9.00 30.00 9,720 5,721 2.70 8.00 0.34 0.58 0.58

3 Intake Air Shaft (IAS) Basement 176.00 32.00 3.00 6.00 3.00 304,128 179,003 84.48 8.00 10.56 3.25 3.25

4 Smoke Extract Shaft (SES) Basement 176.00 32.00 3.00 9.00 3.00 456,192 268,504 126.72 8.00 15.84 3.98 3.98

B PLUMBING

1 Main Shaft 1.20 0.40

2 Waste Shaft Toilet 0.90 0.40

3 Waste Shaft Unit Toilet 0.70 0.30 Every Toilet Unit

C FIRE FIGHTING

1 FCC Room 12.00 4.00 3.00 At Ground Floor

2 Main Shaft 1.20 0.40 Every Stair Case

3 Fire Stairs Shaft 0.50 1.00 0.50 Every Stair Case

D ELECTRICAL

1 Electrical Panel Room Typical 3.00 1.50 2.00 Every Floor

2 Main Electrical Shaft (ELS) 1.50 0.30 Inside Panel Room

E ELECTRONIC

1 Electronic Shaft (ECS) 1.00 0.30 Inside Panel Room