This document provides a checklist of information that should be included in drawings and reports submitted to UTTIPEC. The checklist includes items such as context plans showing surrounding road networks, land uses, and transportation infrastructure; existing and proposed circulation plans for vehicles, non-motorized vehicles, and pedestrians; land acquisition details; and a comparative evaluation of options. Key items on the checklist are context plans, circulation plans, land acquisition information, and a comparative evaluation table of potential design options.
This document provides a checklist of information that should be included in drawings and reports submitted to UTTIPEC. The checklist includes items such as context plans showing surrounding road networks, land uses, and transportation infrastructure; existing and proposed circulation plans for vehicles, non-motorized vehicles, and pedestrians; land acquisition details; and a comparative evaluation of options. Key items on the checklist are context plans, circulation plans, land acquisition information, and a comparative evaluation table of potential design options.
This document provides a checklist of information that should be included in drawings and reports submitted to UTTIPEC. The checklist includes items such as context plans showing surrounding road networks, land uses, and transportation infrastructure; existing and proposed circulation plans for vehicles, non-motorized vehicles, and pedestrians; land acquisition details; and a comparative evaluation of options. Key items on the checklist are context plans, circulation plans, land acquisition information, and a comparative evaluation table of potential design options.
Checklist for Submission of Drawing and Report to UTTIPEC
Sr. No. Information to be incorporated drawings and report Tick ( or or N.A.)
1. i. Context Plan overlaid on ZDP ii. Context Plan overlaid on Google/ Eicher map of Delhi showing a) Road network b) Surrounding/ abutting uses c) Landmarks d) Metro stations e) Railway Lines/ Stations etc. 2. i. Map/survey drawing identifying all a) Edge conditions b) Location of pavements c) Location of crosswalks d) Metro/ bus stations e) Surrounding photographs documentation 3. i. Existing Circulation Plans a) Vehicular movement b) NMV movement c) Pedestrian movement d) Street sections of typical locations with levels e) Public/ private parking (on-street, off-street, multi- level and stack parking) f) Locations of bus stand/ stop g) Junction design in special condition h) Crossing design in special condition i) At-grade plan of existing flyover showing at grade movement j) At-grade plan of existing underpass showing at grade movement k) FOB/ Subway/ Hump subway/ Skywalk 4. i. Proposed Circulation Plans a) Key Plan b) ROW lines as per ZDP c) NMV movements d) Pedestrian movements e) Street sections of typical locations with levels f) Public/ private parking (on-street, off-street, multi- level and stack parking) g) Location of Bus stand/ Stop/ Bays 5. In case Metro stations exist within the study area, then multimodal integration checklist to be followed for the street/area planning. 6. i. Land/ Built-up related information regarding the land to be acquired ii. Ownership of the Land to be acquired iii. Area of the land to be acquired (in sq. mt.) 7. Building with ownership 8. River/ Water-bodies/ Nallah effected with ownership 9. Service/ utilities line effected with ownership 10. Distance from ASI protected ownership 11. Comparative evaluation table to be submitted for all options based on the following criteria: i. Minimum disruption to existing population ii. Functional requirements iii. Ease of implementation iv. Cost (financial and social) v. Aesthetics 12. Conceptual tree plantation plan (optional) 13. Simulation models (optional)