MECH ENGG I-Mains-12 PDF
MECH ENGG I-Mains-12 PDF
N
F-DTN-M-NFDA
MECHANICAL ENGINEERING
Paper I
INSTRUCTIONS
Each question is printed both in Hindi and in English.
Answers must be written in the medium specified in the
Admission Certificate issued to you, which must be
stated clearly on the cover of the answer-book in the
space provided for the purpose. No marks will be given
for the answers written in a medium other than that
specified in the Admission Certificate.
Candidates should attempt Question Nos. I and 5 which
are compulsory, and any three of the remaining ques-
tions selecting at least one question from each Section.
The number of marks carried by each question is
indicated at the end of the question.
Symbols/notations carry their usual meanings, unless
otherwise indicated.
If any data is considered insufficient, assume suitable
value and indicate the same clearly.
Newton may be converted to kg using the equality
1 kilonewton (1 kN) = 100 kg, if found necessary.
Neat sketches/diagrams may be drawn in the answer-
book itself wherever required.
Important : Whenever a Question is being attempted,
all its parts/sub-parts must be attempted contiguously.
This means that before moving on to the next Ques-
tion to be attempted, candidates must finish attempting
all parts /sub-pans of the previous Question attempted.
This is to be strictly followed.
Pages left blank in the answer-book are to be clearly
struck out in ink. Any answers that follow pages left
blank may not be given credit.
F-DTN-M-NFDA 2 (Contd.)
tn. `w'
1. (w) coat c.41 talca Fcl4T * N4-4- cimi
3 m t, al l WI IR. .4).wirn 6la TT raw
cqiitill77ZPkN*0<1.Rt 174‘1:IFIIT*cri .
Wirr-Cfctigi W i l l ta'aikm&F-dTwftqi-4-
(P + 300) kN midi t I itia 91=1T
*A7w iti a,T 3971W 1.25 'MITE = 100 GPa
t, ff'd Mlle 01 anti 411(1 er-47 I 12
(VO 7- tinclimi‘Fit-iitt e a wf€vTelly q cot
qZf ifeogiti 30 m t (nth %tenth tic clic
741 d144( k TNT Ensfur tilich 0.6 t 1 3!T RI9-61T
are wra- *F4q*u4 rid er cicm, ki cbc
Ali Ek uR. Qui ** Rri77 *z-c
ITS 41dq- 4 vs-Rt tl 12
(TT) CrT 1 V-1.14kete-I0. Off qthiri itvlc1 1540°C
iW MT WC* 725°C WT Efit 46 fcben P11
t1W trsa7 E-mici 4 kure air
3T rid * ‘ARN-ra- wra- *ARi W v*r
TEctTd--cniefii 3Tt qZ 3tfwa- *1 -47I 12
(w) 7T I-9T9' WC, %TA &9141;tt-lpirzcid t, 20 lcN
31qVEPTI c Ming( 1711 t I
: 91-41-{ = 50 mm, TI)7( = 5.5 mm
4-er = 109 mm, Thiar{ = 3.5 mm
ITR4qi arri W1 41-ch7. = 9.4 x 104 mm2
45c'cl antri = I = 220 x 104 mm4.
34. itth arEiT x-x Tarr 4-er k *If tr-c arvesr
1:1€7T 919-07 4 I'IHI gI 12
F-DTN-M-NFDA 3 (Contd.)
(e)
F-DTN-M-NFDA 4 (Contd.)
44-4 f4-7 wr che-0
4-4-r t slm s ,;ch 74 4 250° dczn H44
q4T-d1 t wiui 1141-- 0-3 t 400 Nm Air
4Mtri i:ichRto W*4 kici3Tra.4Lpi-i *1 P
rr77 I .1;1 • -q- 4 Rum rprrt
12
2. (T) (1) 1. •- •31 W: 04-16-Kul
trk4fisr4Rif4
- 71
2. 47 ogRilik t)- 4k-14i0-1 ,1-)*4-*-4t 1
3. rzh 51979- k R744 t-i41 4 to
Q-D-7 fq-9r srT ,v1-(1.1*
Rrzrc t Uff *4, t-14) I q1c4 all 20°
t Mir Riti& 4-114-1q) 1 ITIWR
1-m4rti Tf ti4xll t I 2+3+10=15
F-DTN-M-NFDA 5 (Contd.)
(ii) 1. Sketch the arrangement of a reverted
gear train comprising of gears A and
D mounted on co-axial driving and
driven shafts, respectively. Gears B
and C are mounted on a parallel
counter shaft to mesh with gears A
and D, respectively.
F-DTN-M-NFDA 6 (Contd.)
(ii) 1 rcf: Ttcer44r 4KR lirtr .047 flq
NTIlk 'Rig* A c1 I D
ERR+ lici* 7,4 ;UMW Alta tR
t I fit B ?PIT C toilot
*OW: tR sT0F17 *giqt A MIT D
shi-PT: 3171-47 t
F-DTN-M-NFDA (Contd.)
(c) (i) How are the thermosetting plastic pro-
ducts processed ?
(ii) Name two polymerization processes. 10
3. (a)
22 cm
25 cm
F-DTN-M-NFDA 8 (Contd.)
(i) 71E1T4 ' 1
7 F
-e74C UNTe¶r WITI"
tar ?
(ii) t 4i4tiiiletccor 9v* 9T4 tri IR- I 10
22 cm
23cm
114%7
thLk 1 lig t 4ICR1 Liem A 74 arraR*
tRIPTIt 4 tr-1R ‘71I 3Rikffi449-
Rtilt ew 37714116 M.-A-7 = I 20
(kE0 (i) ti)74 Owe A-, fr f 3ficikm offiti
14W eqlti W. 50% t, dl±i °T:IE
9 cuii 40 kW t WC
"t1" mk-Fra- tA I 4iR
OvarY vzim. Er-4-0 fi7 tr-4-Pf
f-'pra- .410 4 tftrt I 10
F-DTN-M-NFDA 9 (Contd.)
(ii) A dose coiled spring has coil diameter
to wire diameter ratio of 6. The spring
deflects 30 rnm wider a load of 500 N
and the maximum shear stress is not to
exceed 350 MPa. Find the diameter and
length of wire required. Modulus of
rigidity of wire material = 80 GPa. 10
(d) Four masses mi, ni2, rn3 and m4 are 160 kg,
225 kg. 200 kg and 312 kg, respectively.
The corresponding radii of rotation are 0.25 m,
0.2 m, 0.3 m and 0.25 m, respectively. The
angles between the successive masses are 45°,
75° and 135°. Find the position and magnitude
of the balance mass required. if its radius of
rotation is 0.25 m. Presume that all masses
including the balance mass rotate in the same
plane. 10
F-DTN-M-NFDA 10 (Contd.)
4:6t4it :kpr-ft -g--:3ir Rd
769: 7117i A 741;1717 6 cF4-11-1 500 N
7.fir1/2 IT< mm t al■ IT
311c-Itc711 :11:1TxTuT N-Pit• 350 MPa
T :-::■
-fThs- 9-ti {ril t. 13T173wa, cR¶1muu
7?-11- &ART I c-IR i'refT
ITITTht = 80 (iPa I 10
(TO rift >P ii Zelicit fe7.7 oho tictiVn
1-zzlAti Tri1111 4- 4 4 ,Itchq 31f4-R-4-Taff 41-
rffT ff ,I 10
(7) .c,-011-49)" mi, m2. m, 9"-TT m4 sni-14T: 160 kg,
225 kg. 2(X) kg 72-TT 312 kg t I c-K1(41 Tiff
S
- W-4 0.25 m, 0.2 in, 0.3 m 0.25m
f I sh4-11411 #1- 414 k ch)ui 45°, 75° mu-
135° tI aria)-Ill Ito<41-11i =?*. MIT
gicrfTur WcT 774-A quid RAT 0.25 m
t I zrt Mff A-1:71L ting-4 4F-0 c.41411
Rrrf Trrra79- 'Tiff r t I 10
41. (MT) (i) PP-AP:id city Cikrft, f$9-tT '4TTC crt WRTPI
t, 4-*7 MIT7-4 ft till 47-r F4v,
I. 300 x 150 mm -11-cri7- 44'f*1*
20 mm *rat W4T 4-eT Thu{
12 inm
2. 3174-114;177 PATIA 177{ art
t Ott I
8?,-
3. el-4 170=4-77 iTIT- 15
F-DTN-M-NFDA i1 (Contd.)
(ii) A cantilever. 3 in long, and of symmetri-
cal section 250 mm deep carries a
uniformly distributed load of 30 kN
per m run throughout, together with a
point load of 80 kN at a section 12 m
from the fixed end. Find the deflection
at the free end. Take, E = 200 GPa and
I = 54,000 cm4. 15
F-DTN-M-NFDA 12 (Contd.)
(ii) 3 m""4"" 74 kTERIff tilt-oaq fr 250 mm
4rEti{ fr 9iti tr*-9- '7 30 kN/m TT tiquf
klffirt 4127 qiK ffqr qalk
1.2 m ETT 80 kN TT #W. sift
Fri t I t ITiTW 1th fi wr faLkiT Wfff
f1177 I E = 200 GPa ?P-IT I = 54,000 cm4
m7" I 15
F-DTN-M-NFDA 13 (Contd.)
Section 'B'
F-DTN-M-NFDA 14 (Contd.)
5. (4) ‘311-4R 39' i1:ifr.4-FERT ,41q EzTT 3S awl
HilicHcb meip4't*fs7art fifirc4 it Traa-4
itnr47 I 12
F-DTN-M-NFDA 15 (Contd.)
(b) compute balance efficiency, idle time and
balance delay.
Task Predecessor Time
(sec)
A — — None 40
B — A 20
C — — None 60
D — 40
E — 30
F — — None 35
G — — None 45
H — 60
I — 40
12
(e) What are the principles of motion economy
related to work place ? If these principles are
adopted in design of work place, what will be
the advantages ? 12
F-DTN-M-NFDA 16 (Contd.)
(4) af ter, f1fWW1 44(1 atri Wag- ke.
fr 4 1 1'111'11 Ar-AQ; I
wit Firm-
(arna)
A Tt{971 - - 40
B - - A - - 20
TTht - - 60
D - - C — — 40
E D - 30
F - - 35
- 45
H - - G - - 60
I - - 40
12
(T) withzar"Hg1i 4 1 d 4104 411*W417 TRT
? ishi4e-fM arf4--749- > ‘.9. firta1
eflikfTzrr AN 91 Grit 9-r4 6141 ? 12
6. (T) (i) RA- 77-kurr4kd'ku locum
(rid A- vich 0.2 mm/rev 91-T7T cIT
ftzIT ,TINE t 9-4 bIM 500 rpm t I cff
wiR- Erg ['levy' -Ta4Tarr-A-4TrTq-9-74
at AM RiFA7 1 mid 4-4-r4 4't frNTE thAt
aT 1:17 1.9 w.s./mm3 t I 10
(ii) 31titrivr Err7 -FERTra- qiefl *Err
RN Tr 444 4 gullQf-A-7
3fCrErISM i-ilr-Roi arrwr7utrr*iioich
•1-4'*1 1Z5 341171514: at1 941 mtcl
t trT R:Tfria-.1 micas s alt1-4T WITT A-
? 20
F-DTN-M-NFDA 17 (Contd.)
(b) (i) Explain in brief, with sketches, the
pressure and vacuum gap flushing
techniques used in EDM. 10
(ii) Which one of the above will result in a
more accurate cavity ? Give reason. 5
(iii) Also discuss how the gap flushing condi-
tions may be improved while drilling
small holes. 5
(c) Find the sequence that minimises the total
elapsed time required to complete the
following jobs. Each job is processed in the
order ACB.
Processing times in hours
Job No. 1 2 3 4 5
Machine A 5 7 6 9 5
Machine B 3 7 5 6 7
Machine C 2 1 4 5 3
F-DTN-M-NFDA 18 (Contd.)
(TT) (i) r,ITT 4 T-44 4g Ark ar4 4T-4 mu
fAtSi-C*74 97749. UT-a it Rs4
afelIcht 40:r 4 tsinilw i 10
urizfr» gill frT tc fafsr 3iftiW Zitriti
cleIN+11 ? chltul Wdr-47 I 5
(iii) 3,T451 cLut:i41 4f47 afT*1141- 91iTt
4r4P4Pi4i 4r" f;.9 kuff 4 *4 TT(
t? 5
(n) Nd 441 kiW 4ta f7 3ff arrT
Qg!tc-f 4tf-47f 1(i0 1101V fITRT ROV
941 i 9 ch14 it ACB WIT 4 Tu rVIT
igrr
snnur Trim tie 4
chic( Wc)41 1 2 3 4 5
=al" A 5 7 6 9 5
TPTI-4 B 3 7 5 6 7
;PA ff C 2 1 4 5 3
wrql ai 39n fr-gth TZTT 1:nff9 ftifNshqui
41w 41m 4147I f M 4 MT .icwur e4c-1 FE
Q.FA
. 7 MT-1 kicwitilaff fir .Jcata trr77 I 10
7. (T) (i) TT( chiri QUTO:Pf Wit " WIT tiii;444
Fd-4--Aur 4" ?
(n) TiT fT,-41 -976 itycidIV qW 9n 4.
elf 0,:d4ch Thirivr Gma 41.6icr*
31-ruTT tFT TIT9- 411dI t I
(iii) 31-r. a ? TErk3y zT uzir law
eN41 ? 401- 7wff
f 404 4-49- Ted* Tfak-a4 fifwg I
5+10+15=30
F-DINI-M-NFDA 19 (Contd.)
(b) (i) Compare the process capabilities of
Shielded Metal-Arc Welding (SMAW)
and Submerged Arc Welding (SAW)
processes. 15
F-DTN-M-NFDA 20 (Contd.)
(q) (i) trie47 trg-air* acsH (7F 71:r 7 rf)
wzrrPiiird 31Ak (747 :y) mstoi
Mrzrapff *9 c1Mh1Rrf7 I 15
(ii) afftw 4i12.cni41(> 20 mm)*T7Fr 71:1-7 79,
TOT qICT 4-RR- Pm( 9MIC Phqi Hcbcii
e?
fi 5
(Ti) 7i qv earn eezr t ? eel):
9-ru cht * 197 1 -*-9. Rrea it 379-F1
arF- 7 ? acvla, 5w;r uzi-r q,14-zr R-rrEer yMHI
Rrrm
-7 10
8. (W) (i) arMtiWIT q (1) fit( rnlui, Uzi(
(2) ctl‘d Qut T TIT H cq t ? ttchi
trifur# qzu ki*.T t ? 10
(ii) Ztvi fgal it 4 a 9-wiT
a~lf4+t erwg 39- to v641. air u4cEr
err-47as 4 9170-e ticndi
•tri‘te iru-offf .441 cif) t ? 15
(iii) "Ertsfur azTT ? 5
(9) (i) Kn-gf t dr41‹ calm') t fir fasn4
Tgr T 10 t I7-4t effur 10,000 7*-0
t I 'TR-44 M141(1 T 2.50 Y*4cnct, t I
50% cam' wiffr e44141 Ala vz if4t cyrct
2 30,000 t, 50% 4 Sift aTTMT .1,141 di
ITT 36,000 3117 80% 36TT WC
T 42,000 t I
F-DTN-M-NFDA 21 (Contd.)
a. What will be the operating profit
of the firm at 70%, 80% and 90%
utilization ?
(c)
y
F-DTN-M-NFDA 22
a. Th-lf MIT 70%, 80% rill
90% WET 34411-9cii 4ZR-97T 6)40 ?
0-0
F-DTN-M-NFDA 23
F-DTN-M-NFDA
CD ch ZrJ1111tdt
Sin-q•• I
?PTV : aIH W u ITITW : 300
39")"31
Y* P7 ark 3/7)73- # 04/ t
PRY- k rd-<- .107 ffrugr if RE 4P1 arfrcr, ff3/4-r
au* gt4F-47 if nchwi Tit t 3rfr w grgrxr wr FETE 3A.zar
vtit -FM- 7T-F crc 307 We- qT R-Err 41111
Tim gi4T-tTT ciT dCctiRcui 7irgi7 3T PAW 3r7r OAT
FITY47 if P4 77 %in< crr chlj 3E3/4 '167 fri4:#
77 fitwr l aitr 5 3TP-4-4721 it f clic) vsa7 r F7 )- nu? #
crdr gqff- 19-3/4-<- R-77 *n. pRf 3/4- dm or,
T47 /*7 ga3Na937 3 Mti 771i
gft-/tidn, rwfm-d. sie # rffm- arrau 7 cnut
via 6) 7
4- add. arerzrfFr TR-a- FT, th- urvff rfT7 tau Perm-
wr u-1-4 RffF 407 I
q&3riT42Tw 711 f=hclirvii (11kN) = 100 Rhea+,Hi (100 kg)
k afTETR- riT /eel Rheaubli 7R7iff71;h4t WeLichal t
(" 9 tuTtirjarft ‘41( t 7F - 3/4-4F ant-g/P/M7
crr arieffff 41*
rrgarrernreretwwwillea rawrrerntft, wag
srmEk gift wpri/urr-srm): rer Frer-Fma f sticor ant
rig.* fk am* gsa en facq4 fr t arri. 4.
fit* sr a friftirrni:/utr-wriff k 3W Fine
pr inwm-rnif * rgrar 41Thq I
uffk- Pirbi RT-A. olt 3/41- Fire if ?w& Fri t-rd-
i(Erith- grer7443/4- , rdrf<Tkai-3/4a7wrt
4-
effr rhmar t
Note : English version of the Instructions is printed on
the front cover of this question paper