WIR Minggu 1 Mei
WIR Minggu 1 Mei
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 017/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil Gardu NP 53 Cargo - Mobilisasi Peralatan Kerja Excavator 17-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 018/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil Gardu NP 53 Cargo - Mobilisasi Peralatan Kerja 18-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 019/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil NP 52, NP 53, P 55 - Mobilisasi Peralatan Kerja 19-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO)
WORK INSPECTION REQUEST
Nomor : 020/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL REMARKS
NO
START FINISH CONTRACTOR PMC
1 Civil NP 52, NP 53, P 55 - Mobilisasi Peralatan Kerja 20-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO)
WORK INSPECTION REQUEST
Nomor : 021/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL REMARKS
NO
START FINISH CONTRACTOR PMC
1 Civil NP 52, P 55 - Mobilisasi Peralatan Kerja 21-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO)
WORK INSPECTION REQUEST
Nomor : 022/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL REMARKS
NO
START FINISH CONTRACTOR MK
1 Civil NP 52, NP 53 - Mobilisasi Peralatan Kerja 22-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO
WORK INSPECTION REQUEST
Nomor : 023/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR MK
1 Civil NP 52, NP 53 - Mobilisasi Peralatan Kerja 23-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
REMARKS
LTING
.........
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO)
WORK INSPECTION REQUEST
Nomor : 024/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL REMARKS
NO
START FINISH CONTRACTOR MK
1 Civil NP 52 - Mobilisasi Peralatan Kerja 24-Mar-2017 8:00 17:00 P
- Pemadatan Lahan Basement
- Pekerjaan Pengecoran Lantai Kerja
- Pabrikasi Bekisting
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSERO)
WORK INSPECTION REQUEST
Nomor : 025/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL REMARKS
NO
START FINISH CONTRACTOR PMC
1 Civil P 55 - Mobilisasi Peralatan Kerja 25-Mar-2017 8:00 17:00 P
- Pekerjaan Galian Basement
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 026/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil P 55 - Koordinasi Perijinan Pemindahan Pohon 26-Mar-2017 8:00 17:00 P
- Mobilisasi Peralatan Kerja
- Pekerjaan Galian Basement
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 027/JRT.WIR/NK/II/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil P 55 - Koordinasi Pemindahan Pohon dan Pemangkasan 27-Mar-2017 8:00 17:00 P
- Mobilisasi Peralatan Kerja
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 012/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Prepared Cargo NP 53 & NP 52, P55 - Pemasangan Pagar Pengaman 12-Mar-2017 8:00 17:00 P
2 Civil Cargo NP 53 & NP 52, P55 Pekerjaan Sondir/Boring Tanah 12-Mar-2017 8:00 17:00 P
3 Civil Cargo NP 53 & NP 52, P55 Bongkaran Conblock 12-Mar-2017 8:00 17:00 P
4 Civil Cargo NP 53 & NP 52, P55 Test Pit 12-Mar-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING
WORK INSPECTION REQUEST
Nomor : 030/JRT.WIR/NK/III/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR
1 Civil Perakitan alat pancang Threefoot 02-May-2017 8:00 17:00 P
NP53 Pengadaan Material Tiang Pancang 03-May-2017 8:00 17:00 P
Pekerjaan Pancang 03-May-2017 8:00 17:00 P
4 Civil PUSPIPTEK Uji Tekuk dan Uji Tarik Besi 04-May-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
ge by PMC
MA CONSULTING
...........................
PT ANGKASA PURA II (PERSERO) PT GANESHATAMA CONSULTING PT. NINDYA KARYA (PERSER
WORK INSPECTION REQUEST
Nomor : 030/JRT.WIR/NK/V/2017
DISCIPLINE LOCATION DESCRIPTION OF ACTIVITY / CHARRACTERS TO BE VERIFIED DATE TIME INSPECTION LEVEL
NO
START FINISH CONTRACTOR PMC
1 Civil Perakitan alat pancang Threefoot 02-May-2017 8:00 17:00 P
NP53 Pengadaan Material Tiang Pancang 03-May-2017 8:00 17:00 P
Pekerjaan Pancang 03-May-2017 8:00 17:00 P
4 Civil PUSPIPTEK Uji Tekuk dan Uji Tarik Besi 04-May-2017 8:00 17:00 P
H= HOLD POINT, A= APPROVAL, C= CHECK ON SITE, W= WITNESS, R= REVIEW DOCUMENT, I= INSPECTION / SURVEILLANCE, SW= SPOTWITNESS, P= PERFORM, PROPIDE
Prepared by Contractor acknowledge by PMC
PT. NINDYA KARYA (PERSERO) PT GANESHATAMA CONSULTING
………………………………………………... ......................................................
PT. NINDYA KARYA (PERSERO)
REMARKS