Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

CUPIAGUA CPF

UPS Inverter and Static Switch


Function Test Certificate
AC-1 No.: HC-1 No.: Certs No.
FE-09
Sheet 1 of 1

AREA / LOCATION: SYSTEM:


P & ID No.: REV SERVICE:
DATA SHEET No.: REV TAG No.
MANUFACTURER: CERTIFICATION CLASSIFICATION:
MODEL No.: TYPE No.:
SERIAL No.: S.L.D.No.:
CIRCUIT No. SWB: CUBICLE REF.:
INVERTER RATING INPUT VOLTS OUTPUT VOLTS
KVA V V
Chk Check Description N/A INTL DATE

1. Confirm cable terminations correct and tight.

2. Confirm DC input connection cables polarity correct.

3. Confirm output voltage correct and record ________V

4. Confirm neutral earth connection (where specified) properly connected and record
earth path resistance ________Ohms

5. Check and record insulation resistance live to neutral and earth ________M.Ohms

6 Confirm operation of current limiting and record output current limit _______ A

7. Confirm operation of control and protection relays and record values


ALARM Trip to
Bypass
a) Over voltage ...............................V
b) Under voltage ................................V
c) Frequency out of limit ..............................Hz
d) Unit Over temperature ............................... oC

8. Confirm operation of F&G / ESD input trip.

9. Confirm operation of all indication, local and remote.

10. Confirm satisfactory no break changeover on load


a) Inverter A to Inverter B
b) Inverter B to Inverter A
c) Inverter A to standby and back to Inverter A
d) Inverter B to standby and back to Inverter B

REMARKS:

Completed by Approved by Accepted by


(Technician) (Supervisor) (Completions)
COMPANY
SIGNATURE
PRINT NAME
DATE

Rev 01

You might also like