Maharashtra State Electricity Transmission Co. LTD
Maharashtra State Electricity Transmission Co. LTD
Maharashtra State Electricity Transmission Co. LTD
From, To,
Office of the Superintending Engineer, The Chief Engineer (D&P),
Testing & Communication Circle, M. S. E. T. Co. Ltd.,
4th Floor, MSEB Adm. Bldg., CO, Mumbai.
Sector-17, Vashi, Navi Mumbai-400703.
Tel: ( 022) 27656040 / 27656039 Fax: 27653463
E-Mail: se7500@mahatransco.in
CIN No.U40109MH2005SGC153646
Website: www.mahatransco.in
Ref: SE/TCC/VSH/Tech/No. 129 Date: 27.04.2018
5. Date & Time of Restoration :Main Bus section-II restored at 18:54 hrs
on 17.04.2018.
6. Detailed of SLD & sub-station interconnection: Attached separately
7. Brief Summary of occurrence: On 17.04.2018 @ 18:17 hrs, 100 kV Taloja-Pal Line at 100 kV
Taloja Sub-Station tripped from both end in Zone 1 from Pal end & in Zone 2 from Taloja end for R
Phase to Earth fault. At the same time, Line Differential & LBB Protection of 220 kV Taloja-OCIL
Line II (which was under outage) operated, causing isolation of 220 kV Bus-Section-II at 220 kV
Taloja Sub-Station.
8. Conditions prior to Occurrence : Cloudy & Dust Storm
9. Conditions after Occurrence : Cloudy & Dust Storm
Sr. No. 220 KV Main Bus Section– I 220 KV Main Bus Section – II
Name of bays (Feeder/ Loads (MW) Name of bays (Feeder/ Loads (MW)
ICTs/TFs) ICTs/TFs)
1 220kV Taloja – Kalwa Line 48.48 220kV Taloja – Apta Line 132.5
2 220kV Taloja – OCIL I Line 7.57 220kV Taloja – OCIL II Line -
11. Load/Power loss and / or generation (In MW): The total 22 KV feeder load loss of about 12 MW
is observed for 05 min as 220/22 KV 50 MVA ALSTOM make T/F tripped due to LBB operation of
220 KV Taloja-OCIL Ckt-II. (220 KV Main Bus Section-2)
12. Interrupted and duration of interruption:
13. Load/Power loss due to operation of Load Trimming Scheme (LTS)/Special Protection
Scheme (SPS)/Under Voltage Load Trimming Scheme (UVLS).
a) Please specify whether existing Load trimming /SPS/ UVLS schemes if any, are serving
intended purpose.
b) Please specify whether load trimming scheme or special protection scheme operated as
desired or Non-operation/maloperation, any modifications in LTS/SPS required.
c) Please specify Settings adopted for LTS/SPS/UVLS & revision required, if any.
(Please specify whether advancement of counter after operation during occurrence observed)
16. Restoration :
Sr. No. Name of Feeder/bays Date & Time Duration Remark
From To (hrs)
(Moreshwar S. Jangde)
Superintending Engineer,
Testing & Communication Circle, Vashi.