Download as pdf
Download as pdf
You are on page 1of 4
BID SPECIFICATIONS AND ESTIMATE OPERATOR WELL NAME AND No. LOCATION COUNTY, STATE PROPOSED TO USE RIG No. BID DUE DATE ACCEPTED NOT ACCEPTED REMARKS: BID SPECIFICATIONS ‘OWNER: WELL Ne. RIG Now DATE START: Lecation Time: Actual Rig Up .. : : ——_Deys ____bays Drig. Contract Days. ns Days Doys W.O.C., Completion and Fret Days Doys Tear Down Doys Doys TOTAL RIG CONTRACT DAYS Days Doys Contract Footage Depth: Maximum Depth: Formation: Deviation From Vertical CASING PROGRAM: Cement Tine Allowed = Hr ‘Conductor Pipe Surface Protection String Oil Sting Liner Tubing 1 MUD CONTROL PROGRAM: Depth Interval Type Mud Weight | Visco From To Water Loss {o1s of Circulation Clausy: INSURANCE LIMITS: Pu Po, Other insurance Required: : ITEMS TO BE FURNISHED B) OWNER CONTRACTOR Rig Heating Fuel Water Water Lines Transportation of Contractor's Property: ‘Move In ‘Move Out ‘Operational Transportation ‘Materials for "Boxing In” Rig and Derrick Bit, Reamers and Stabilizers Drilling In Equipment Special BOP Equipment = “Special Alr Equipment ‘Special Marine Equipment BID SHEET Owner. Well Nome, No, Dote Aol" DIRECT EXPENSE: Per Dey | pel ‘Actual $0:11-1___All Labor Except Supervision 90:11-2 Superson nc. Trans. and Expense 90-11-3 jenance ond Supplies Totol fixed DIRECT EXPENSE per doy fimes___esimoted days OTHER DIRECT EXPENSE 90-11-41 its and Racers 90-11-42) Move in and Out — Rigging Up ond Bows 30-11-423_ Other Transporation 90-11-43 Renfol Tools and Rerfal Equipment 90-11-51) Fis, Cellor ond Dj Work 90:11.512 Derick 9011-513 lumber, Maling end Concrele 90-11-514 Other Preperation (Roeds, Bridges and Clearing] 90.11-52 Rig Fuel and Lin 90-11-524 Heating Fuel _ 90-11-53 Water and Lines: ~ 90:11-54 Mud ond Chemicals 9011-57 __Speciol Taxes (Soles 6nd Conroal 90-11-58 Speciol Services to be Furnished by Coniradior 90-11-59 Speciol Material be Furnished by Controcior TOTAL OTHER DIRECT EXPENSE —r INDIRECT EXPENSE 90-11-81___Rig Depreciation 90-11-82 Drill Pipe Depreciation 9011-822, Drill Collar Depreciation 9011-9 Overhead Expense TOTAL INDIRECT EXPENSE TOTAL ALL EXPENSE PROFIT ESTIMATED COST PLUS PROFIT FROM CONTRACT DRILLING ESTIMATED COST PLUS PROFIT $——__pivivtp sy___ FEET CONTRACT DEPTH PRICE PER FOOT DAY WORK Fixed Direct Expense Per Day ‘Other Applicable Expense (Fuel, Water, Ete) 90-11-81 fig Depreciation per Day 9011-9 Overhead Expense per Day PROFIT 80-1___ DAY WORK RATE WITHOUT DRILL PIPE 90-11-82 __ Drill Pipe Depreciation 90-11-822 Drill Collar Depreciation DAY WORK RATE WITH DRILL PIPE ‘Standby Time with Crews ‘Standby Time Without Crews Calculated By. Date. Approved By. Date.

You might also like