BID SPECIFICATIONS
AND
ESTIMATE
OPERATOR
WELL NAME AND No.
LOCATION COUNTY, STATE
PROPOSED TO USE RIG No. BID DUE DATE
ACCEPTED NOT ACCEPTED
REMARKS:BID SPECIFICATIONS
‘OWNER: WELL Ne.
RIG Now DATE START:
Lecation Time: Actual
Rig Up .. : : ——_Deys ____bays
Drig. Contract Days. ns Days Doys
W.O.C., Completion and Fret Days Doys
Tear Down Doys Doys
TOTAL RIG CONTRACT DAYS Days Doys
Contract Footage Depth: Maximum Depth: Formation:
Deviation From Vertical
CASING PROGRAM:
Cement Tine
Allowed = Hr
‘Conductor Pipe
Surface
Protection String
Oil Sting
Liner
Tubing 1
MUD CONTROL PROGRAM:
Depth Interval Type Mud Weight | Visco
From To
Water Loss
{o1s of Circulation Clausy:
INSURANCE LIMITS:
Pu Po,
Other insurance Required: :
ITEMS TO BE FURNISHED B)
OWNER CONTRACTOR
Rig Heating Fuel
Water
Water Lines
Transportation of Contractor's Property:
‘Move In
‘Move Out
‘Operational Transportation
‘Materials for "Boxing In” Rig and Derrick
Bit, Reamers and Stabilizers
Drilling In Equipment
Special BOP Equipment =
“Special Alr Equipment
‘Special Marine EquipmentBID SHEET
Owner. Well Nome, No, Dote
Aol" DIRECT EXPENSE: Per Dey | pel ‘Actual
$0:11-1___All Labor Except Supervision
90:11-2 Superson nc. Trans. and Expense
90-11-3 jenance ond Supplies
Totol fixed DIRECT EXPENSE per doy
fimes___esimoted days
OTHER DIRECT EXPENSE
90-11-41 its and Racers
90-11-42) Move in and Out — Rigging Up ond Bows
30-11-423_ Other Transporation
90-11-43 Renfol Tools and Rerfal Equipment
90-11-51) Fis, Cellor ond Dj Work
90:11.512 Derick
9011-513 lumber, Maling end Concrele
90-11-514 Other Preperation (Roeds, Bridges and Clearing]
90.11-52 Rig Fuel and Lin
90-11-524 Heating Fuel _
90-11-53 Water and Lines: ~
90:11-54 Mud ond Chemicals
9011-57 __Speciol Taxes (Soles 6nd Conroal
90-11-58 Speciol Services to be Furnished by Coniradior
90-11-59 Speciol Material be Furnished by Controcior
TOTAL OTHER DIRECT EXPENSE
—r
INDIRECT EXPENSE
90-11-81___Rig Depreciation
90-11-82 Drill Pipe Depreciation
9011-822, Drill Collar Depreciation
9011-9 Overhead Expense
TOTAL INDIRECT EXPENSE
TOTAL ALL EXPENSE
PROFIT
ESTIMATED COST PLUS PROFIT FROM
CONTRACT DRILLING
ESTIMATED COST PLUS PROFIT
$——__pivivtp sy___
FEET CONTRACT DEPTH
PRICE PER FOOT
DAY WORK
Fixed Direct Expense Per Day
‘Other Applicable Expense (Fuel, Water, Ete)
90-11-81 fig Depreciation per Day
9011-9 Overhead Expense per Day
PROFIT
80-1___ DAY WORK RATE WITHOUT DRILL PIPE
90-11-82 __ Drill Pipe Depreciation
90-11-822 Drill Collar Depreciation
DAY WORK RATE WITH DRILL PIPE
‘Standby Time with Crews
‘Standby Time Without Crews
Calculated By. Date. Approved By. Date.