CIPL-PL-SPNPL-WP-10 Project Client Contractor Work Order no. WORK PROCEDURE. FOR | PIPE LOG BOOK | CORRTECH INTRNATIONAL PVT. LTD. : Jaipur Panipat Naphtha Pipeline Project. Mis Indian Oil Corporation Ltd. : M/s Corrtech International Pvt. Ltd. 25082324 dated 21.04.17 7 — Prepared - “| |e yi cemoretty | aly nigh FOR CIPL FORTOCL WORK PROCEDURE | Indianoit FOR Sa Doc No. PIPE LOG BOOK CIPL-PLSSPNPL-WP-10 | TABLE OF CONTENTS 1.0.0 PURPOSE 2.0.0 SCOPE.. 30.0 REFERENCES., 4.0.0 METHODOLOGY... 50.0 QUALITY ASSURANCE & QUALITY CONTROL... 6.0.0 FORMAT... furs dis A FOR CIPL Ort ee Page 2 of 4 WORK PROCEDURE © FOR ORRTEC. Born PIPE LOG BOOK ° CIPL-PL-JPNPL-WP-10 1.0.0 PURPOSE: The purpose of this procedure is to Jay guideline and requirements and to establish a method or a system to control the pipe book in the JPNPL Project by CIPL (2.0.0 SCOPE: This covers the method of preparation of pipe book for the JPNPL Project. 3.0.0 REFERENCES IOCL spec No. }OCL-ML- DOC-SPEC Design & construction requirements for cross-country hydrocarbon pipelines O1SD tat 4.0.0 RESPONSIBILITIES Site Supervisor /Forman Shall report to spread in-charge / construction Manager & shall be Responsible For cover all control & safety management and for the implementation of procedure , generation of reports during the activity. Qc In— Charge Shall report to construction Manager/Project Manager administratively & nto HO FOR technical matters and shall be Responsible For proper implementation of procedure , verifies & countersigns reports. 5.0.0 METHODOLOGY The format of the Pipe book shall be duly filled by CIPL and clearance obtained from at the three stages as indicated below. 5.1.0 PART-A This part of clearance shall be obtained for lowering of pipe string into the trench 5.2.0 PART-B This part of clearance shall be obtained for final hydro-test of Pipeline. CIPL shall submit to 1OCL for checking at least ten days in advance. All data for the pipe log ‘book should be collected on basis of quality forms, inspection report and other documents duly verified and approved by the [CL falock SAS el Page 3 of 4 FOR CIPL. ‘OR JOC WORK PROCEDURE | gS FOR SORRTECH PIPE LOG BOOK _ : | CAPLPLIPNPLWP-1O PART-C ‘This part of clearance shall be obtained for final clearance after satisfactory Completion of all restoration works. CIPL shall submit to IOCL for checking at least ten days in advance. All columns of the pipe book shall be filled by CIPL based on the daily inspection Reports signed by the representatives of IOCL. Any remarks, given in the inspection report shall be reflected / incorporated accordingly in the pipe book, In the Pipe book listing, the pipes considered for a joint are the one shown against the joint number and the next preceding pipe number. 6.0.0 QUALITY ASSURANCE & QUALITY CONTROL: ‘Quality assurance shall be maintained by ensuring the systematic implementation of this procedure and ensure that necessary quality records are generated as ‘appended to this procedure. 7.0.0 FORMAT: Format No: CIPL-PL-JPNPL-WP-FM-10 Note: In case of any conflict between the requirements of this procedure and IOCL Specification the tater shali govern, until and unless specific intention is meant fist rol FOR CRE, Femiock Page 4 of 4 001 tos (sexuraeL) MUAY is,

You might also like