Sheet Pile Anchor Rod Case1 - Edit2
Sheet Pile Anchor Rod Case1 - Edit2
Date:
Designer: MHS Check by:
Passive
Therefore, ∑MT = 0
= 11.31 D³ + 118.7D² - 234.29 = 0
D= 1.32 m
Find T, ∑Force = 0
= 151.82 - 33.92 D² -T
T = 92.71 kN
If T = 100 kN
hence D= 1.24 m
adopt FOS 1.5 = 1.85 m embeded wall
Total sheet pile length = 5.4 m less than proposed sheet pile length, 12m ok