TASK 05−20−00−210−805
General Visual Inspection of the Connectors in the AHRS HIRF Enclosure (MRB#052000−307)
1. General
A. The maintenance procedure that follows is for the general visual inspection of the connectors
related to the attitude heading reference system (AHRS) units. The AHRS units are installed in a
HIRF (Lightning/High Intensity Radiated Fields) enclosure below the floor in the passenger
compartment.

2. Job Set−Up Information


Subtask 05−20−00−943−008

A. Tools & Equipment


(1) Commercially Inspection Light
Available
(2) Commercially Inspection Mirror
Available

3. Job Set−Up
Subtask 05−20−00−010−008

A. Remove the access panel that follow:

REFERENCE DESIGNATION
133JZ Floor Panel

B. Remove the cover (1) from the HIRF enclosure (2) as follows:
(1) Remove the screws (3) and washers (4) from the cover (1) and the enclosure (2).
(2) Remove the cover (1) of the box (2).

4. Procedure
Refer to Figure 605.
Subtask 05−20−00−210−015

A. Use a light and mirror to do a general visual inspection of the AHRS connectors (5) in the HIRF
enclosure (2) as follows:
(1) Look at the connectors on the AHRS units(6).
(2) Make sure that all connectors and backshells are correctly installed.
(3) Make sure that the connectors are in a good condition and are not damaged.

PSM 1−84−2 − MASTER


EFFECTIVITY:
Page 612
See first effectivity on page 612 of 05−20−00 05−20−00 Mar 05/2017
E
AIRCRAFT MAINTENANCE MANUAL

5. Close Out
Subtask 05−20−00−410−006

A. Install the cover (1) on the HIRF enclosure (2) as follows:


(1) Put the cover (1) in the correct position on the HIRF enclosure (2).
(2) Install the screws (3) and washers (4).
B. Install the access panel that follow:

REFERENCE DESIGNATION
133JZ Floor Panel

Subtask 05−20−00−941−017

C. Remove all tools, equipment and unwanted materials from the work area.

PSM 1−84−2 − MASTER


EFFECTIVITY:
Page 613
See first effectivity on page 612 of 05−20−00 05−20−00 Mar 05/2017
E
AIRCRAFT MAINTENANCE MANUAL

X388.00
X373.15
LEGEND
1. Cover.
2. HIRF enclosure.
3. Screw.
4. Washer.
5. AHRS connectors.
6. AHRS units.

4
1
6

Y9.25

Y0.00
brat14a01.dg, gg, 20/10/03

AHRS Connectors in the HIRF Enclosure − General Visual Inspection


Figure 605

PSM 1−84−2 − MASTER


EFFECTIVITY:
Page 614
See first effectivity on page 612 of 05−20−00
05−20−00 Mar 05/2017

You might also like