EKO ELECTRICITY DISTRIBUTION PLC

PREPAID CUSTOMER GROUP DEPARTMENT

TECHNICAL LEARNING SESSION

Prepared & Presented by:


Moko Festus Moko
Head of Group (PCG-Ops)
The beginning…
It is interesting to note that prepayment
metering in Nigeria actually started in the
then Islands District of Eko Electricity
Distribution Plc way back in 1997 with a
pilot scheme of about 2500 customers
covering Victoria Island and Ikoyi. In fact,
the first token ever vended was on July 28,
1997. The meters in use then were
CONLOG meters that made use of the
Magnetic Card strip as the token
technology.
Types of prepaid meters in EKEDC
Conlog was actually the first type of prepaid
meter to be installed in EKEDC way back in
1997. The deployment of Conlog meters
continued until 2006 when Actaris, Landis &
Gyr, Unistar and Holley came on board due
to the massive deployment of prepaid
meters that was required in line with the
National Pre-Paid Metering Programme that
was launched in 2006. Below is a list of all
meter types in EKEDC PPM network.
Types of prepaid meters in EKEDC

1 •Conlog Meters – 04…


2 • Itron (Actaris) Meters – 01…
3 •Landis + Gyr Meters – 07…
4 •Mojec Clou Meters – 54…
5 •Unistar & Holley Meters **
6 •Momas Meters – 62…
7 •Mojec Microstar – 0101…
Bad Installation
Good Installation
Bad Installation
Good Installation
Bad Installation
Good Installation
Bad Installation
Itron (Actaris) Meters

Itron 1-Phase Compact Itron 3-Phase Compact Itron 1-Phase Compact


Conlog Meters

Conlog 3-Phase Split Conlog 1-Phase Compact


Momas Meters

Momas 3-Phase Compact Momas 1-Phase Compact


Mojec Clou Meters

Mojec Clou 3-Phase Split Mojec Clou 1-Phase Split


3-Phase Split 1-Phase Split
Mojec Microstar PLC Keypad
Growth Analysis…
The prepaid meters scheme has over the
years grown in leaps and bounds but not
without challenges anyway. The analysis
below shows by meter type, how many
meters have been installed as well as the
growth rate in figures between 2007 and
2014. Also analyzed here is the PPM
population by business unit.
PPM Population Growth

2015 – 157,557
Number of PPM Installed

2010 – 59,683

2007 – 36,478

Years Interval
EKO ELECTRICITY DISTRIBUTION COMPANY PLC
PPM Population Analysis by Meter Types

Unistar, 12265

Momas, 16934

Conlog, 63829

Conlog
Mojec, 28219
Itron
L&G
Mojec
Momas

Itron, 28760 Unistar

L & G, 7375
EKO ELECTRICITY DISTRIBUTION PLC
PPM Population Analysis by Business Unit

OJO, 9,941 AGBARA, APAPA, 5,771


12,074

FESTAC, 14,540
MUSHIN, 35,363 AGBARA

APAPA
IJORA, 20,342
FESTAC

IJORA
ISLANDS, 14,297
ISLANDS
LEKKI, 45,229
LEKKI

MUSHIN

OJO