Ref No :(411)HM/SA/P15/DE(Ph.

2)/NOV/2013
Your Ref No : -

26 November 2013

Putrajaya Holdings Sdn. Bhd.


Menara PJH,
No.2, Jalan Tun Abdul Razak,
Presint 2, 62100 Putrajaya.
Attn : Tn. Hj. Musli Selamat
Head of Section, Residential 2

Dear Sir,

THE PROPOSED CONSTRUCTION AND COMPLETION OF 69 UNITS SHOP OFFICE


(ROW 1 TO 7) CONSISTING OF 2 STOREY SHOP OFFICE (15 UNITS), 3 STOREY SHOP
OFFICE (33 UNITS), 4 STOREY SHOP OFFICE (21 UNITS), 1 BLOCK MULTILEVEL CAR
PARK (4 STOREY), 1 UNIT REFUSE CENTRE, 1 UNIT TNB SUB STATION, ASSOCIATED
WORKS AND LANDSCAPING WORKS AT NEIGHBOURHOOD COMMERCIAL
CENTRE (PHASE 2), DIPLOMATIC ENCLAVE, PRECINCT 15, WILAYAH
PERSEKUTUAN PUTRAJAYA
CONTRACT NO. : BDG/COM/P15/DE(Ph.2)/CONTRACTOR/2012-0102
Subject: Factory Visit for Blower and pump syatem with MPAJ, consultant and main-
contractor

The above subject matter refers.

We would like to invite you for a factory visit as follows :

Date : 2nd Disember 2013 (Monday)


Time : 8.30 am
Place of Assembly : RISO Pjh
Itinerary for the factory visit are as follows :

Item Equipment/Material Manufacturer Time Remark

Bugati Pump,
Fire Protection – 27, Jalan Tago 6, Taman
3 Perindustrian Tago, Sri 2.30pm
Hose Reel Pump
Damansara

2/..
Page 2 : (411)HM/SA/P15/DE(Ph.2)/NOV /2013
Date : 26 November 2013
THE PROPOSED CONSTRUCTION AND COMPLETION OF 69 UNITS SHOP OFFICE (ROW 1 TO 7) CONSISTING OF 2
STOREY SHOP OFFICE (15 UNITS), 3 STOREY SHOP OFFICE (33 UNITS), 4 STOREY SHOP OFFICE (21 UNITS), 1
BLOCK MULTILEVEL CAR PARK (4 STOREY), 1 UNIT REFUSE CENTRE, 1 UNIT TNB SUB STATION, ASSOCIATED
WORKS AND LANDSCAPING WORKS AT NEIGHBOURHOOD COMMERCIAL CENTRE (PHASE 2), DIPLOMATIC
ENCLAVE, PRECINCT 15, WILAYAH PERSEKUTUAN PUTRAJAYA
CONTRACT NO. : BDG/COM/P15/DE(Ph.2)/CONTRACTOR/2012-0102
Subject: Factory Visit for Fire Protection Services With Kumpulan Sakata Sdn Bhd.

Your participation is appreciated.

Kindly revert to us should you have any queries.

Thank you.

Your faithfully,
ZENO GLOBAL SDN. BHD.

Mohd Firdaus Syafiq Bin Ramli


Project Manager

Org :

1) Fazli Nordin
3/..
Page 3 : (411)HM/SA/P15/DE(Ph.2)/NOV /2013
Date : 26 November 2013
THE PROPOSED CONSTRUCTION AND COMPLETION OF 69 UNITS SHOP OFFICE (ROW 1 TO 7) CONSISTING OF 2
STOREY SHOP OFFICE (15 UNITS), 3 STOREY SHOP OFFICE (33 UNITS), 4 STOREY SHOP OFFICE (21 UNITS), 1
BLOCK MULTILEVEL CAR PARK (4 STOREY), 1 UNIT REFUSE CENTRE, 1 UNIT TNB SUB STATION, ASSOCIATED
WORKS AND LANDSCAPING WORKS AT NEIGHBOURHOOD COMMERCIAL CENTRE (PHASE 2), DIPLOMATIC
ENCLAVE, PRECINCT 15, WILAYAH PERSEKUTUAN PUTRAJAYA
CONTRACT NO. : BDG/COM/P15/DE(Ph.2)/CONTRACTOR/2012-0102
Subject: Factory Visit for Fire Protection Services With Kumpulan Sakata Sdn Bhd.

c.c

1. Perunding Wangsa Sdn Bhd


No.81-2, Jalan Wangsa Delima 5,
Pusat Bandar Wangsa Maju,
53300 Kuala Lumpur.
Attn : IR Nik Areez Ariffin - without Enclosure