FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. Design Footing
PROJECT/JOB NAME x
CLIENT NAME Example
SITE NAME Example
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME F1
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
FOOTING 1 F1

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [SI]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : SI, Output : SI, Calculation Unit : SI

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 25.000 N/mm
2
Lean Concrete (Lf'c : compressive strength) 0.000 N/mm
2
Reinforcement (#6 ~ #18 , yield strength) 390.000 N/mm
2
Reinforcement (#20 ~ , yield strength) 390.000 N/mm
3
Rs (Soil unit weight) 18.000 kN/m
3
Rc (Concrete unit weight) 25.000 kN/m
2
Es (Steel Modulus of Elasticity) 200.000 kN/mm
2
Ec (Concrete Modulus of Elasticity) 23.500 kN/mm

- Soil Capacity
Items Value
Soil Name Unit-01
Footing List F1
2
Qa (Soil Bearing Capacity) 250 kN/m
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
Passive Soil Pressure Not Consider
2
Cu (Undrained cohesion) Clay , 0 kN/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 0%
Allowable Increase of Soil (Seismic) 0%
Allowable Increase of Soil (Test) 0%
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 1.5
Safety factor against overturning for OVM4(FO4) 1.9

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 4

Safety factor against sliding for the SL1(FS1) 1.5


Safety factor against sliding for the SL2(FS2) 1.8
Safety factor against sliding for the SL3(FS3) 1.5
Safety factor against sliding for the SL4(FS4) 1.5
Friction factor (m) 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 SN SNOW LOAD
3 DL DEAD LOAD
4 LL LIVE LOAD
5 WL WIND LOAD

Comb . ID Load Combination for stability


1 1.0 SW + 1.0 DL + 1.0 LL + 1.0 SN
2 .6 SW + .6 DL + 1.0 WL
3 .6 SW + .6 DL + .7 SL2
4 1.0 SW + 1.0 DL + .75 LL + .75 WL
5 1.0 SW + 1.0 DL + .75 LL + .525 SL2
Comb . ID Load Combination for Reinforcement
101 1.4 SW + 1.4 DL
102 1.2 SW + 1.2 DL + 1.6 LL + .5 SN
103 1.2 SW + 1.2 DL + 1.0 LL + 1.6 SN
104 1.2 SW + 1.2 DL + .5 WL + 1.6 SN
105 1.2 SW + 1.2 DL + 1.0 LL + 1.0 WL + .5 SN
106 1.2 SW + 1.2 DL + 1.0 LL
107 .9 SW + .9 DL + 1.0 WL
108 .9 SW

Copyright (c) GS E&C. All Rights Reserved


29-01-2018 Page 5

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE

A01

NOTES
* OUTPUT UNIT : mm

01

1 x PROJECT

FOUNDATION LOCATION PLAN


F1

SQUAD CHECK
Y
F1 PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN Design Footing

Copyright (c) GS E&C. All Rights Reserved


29-01-2018 Page 6

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


29-01-2018 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE

2400 CL FOOTING
1200 TOP BOTTOM

TYP.
50
1200

#16@220

#18@190
2400

NOTES
* OUTPUT UNIT : mm

#16@220 #18@160
FOUNDATION PLAN FOOTING REINF. PLAN

x PROJECT
100 50

TOC EL. + 0
600

50
1000
1000

@200

TYP.
#8

#16
FOUNDATION DETAIL FOR
300

F1
#8
100
50

SQUAD CHECK
6-#16
PEDESTAL
500

50

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

LEAN CONC. 50 THK


CRUSHED STONE 100 THK
SECTION SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN Design Footing

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 8

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
2
2400 Area 5.760 m
Ft. Thickness 500.00 mm
3
Ft. Volume 2.880 m
Ft. Weight 72.000 kN
Soil Height 1000.00 mm
3
Soil Volume 5.580 m
600 300 Soil Weight 100.440 kN
2400

Buoyancy Not Consider


Self Weight (except Pr.SW) 172.440 kN

1000
500

The Origin coordinate


The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 2.880 m 5.580 m 4.500 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 5.760 m 72.000 kN 100.440 kN 176.940 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : kN , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 Rectangle 600.000 300.000 1000.000 0.180 4.500 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 9

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 SN SNOW LOAD
3 DL DEAD LOAD
4 LL LIVE LOAD
5 WL WIND LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -4.5 0 0
2 0 0 -50 0 0
1 3 0 0 -500 0 0
F1
4 0 0 -800 0 0
5 0 0 0 0 0
Footing SW 0.000 0.000 -172.440 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F1 1 0.000 0.000 -1350.000 0.000 0.000
2 0.000 0.000 -300.000 0.000 0.000
3 0.000 0.000 -300.000 0.000 0.000
4 0.000 0.000 -1100.000 0.000 0.000
1
5 0.000 0.000 -1100.000 0.000 0.000
101 0.000 0.000 -700.000 0.000 0.000
102 0.000 0.000 -1905.000 0.000 0.000
103 0.000 0.000 -1480.000 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 10

104 0.000 0.000 -680.000 0.000 0.000


105 0.000 0.000 -1425.000 0.000 0.000
106 0.000 0.000 -1400.000 0.000 0.000
107 0.000 0.000 -450.000 0.000 0.000
108 0.000 0.000 0.000 0.000 0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 0.000 0.000 -1354.500 0.000 0.000
2 0.000 0.000 -302.700 0.000 0.000
3 0.000 0.000 -302.700 0.000 0.000
4 0.000 0.000 -1104.500 0.000 0.000
5 0.000 0.000 -1104.500 0.000 0.000
101 0.000 0.000 -706.300 0.000 0.000
F1 1 102 0.000 0.000 -1910.400 0.000 0.000
103 0.000 0.000 -1485.400 0.000 0.000
104 0.000 0.000 -685.400 0.000 0.000
105 0.000 0.000 -1430.400 0.000 0.000
106 0.000 0.000 -1405.400 0.000 0.000
107 0.000 0.000 -454.050 0.000 0.000
108 0.000 0.000 -4.050 0.000 0.000

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
1 0.000 0.000 -1526.940 0.000 0.000 1200.0 , 1200.0
2 0.000 0.000 -406.164 0.000 0.000 1200.0 , 1200.0
F1 3 0.000 0.000 -406.164 0.000 0.000 1200.0 , 1200.0
4 0.000 0.000 -1276.940 0.000 0.000 1200.0 , 1200.0
5 0.000 0.000 -1276.940 0.000 0.000 1200.0 , 1200.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
101 0.000 0.000 -947.716 0.000 0.000 1200.0 , 1200.0
102 0.000 0.000 -2117.328 0.000 0.000 1200.0 , 1200.0
103 0.000 0.000 -1692.328 0.000 0.000 1200.0 , 1200.0
104 0.000 0.000 -892.328 0.000 0.000 1200.0 , 1200.0
F1 S1
105 0.000 0.000 -1637.328 0.000 0.000 1200.0 , 1200.0
106 0.000 0.000 -1612.328 0.000 0.000 1200.0 , 1200.0
107 0.000 0.000 -609.246 0.000 0.000 1200.0 , 1200.0
108 0.000 0.000 -159.246 0.000 0.000 1200.0 , 1200.0

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 11

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F
Formula : > Fs -> OK (Bi-Axial)
SFx2 + SFy2
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( kN )
( mSFz + P.F ) / SFx + SFy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
F1 Bi-Axial 5 SFx2+ SFy2 = 0 , Then N/A 1.8 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK Unit ( kN-m )
Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 5 SMo = 0 , Then N/A 1.5 OK
F1
Y 5 SMo = 0 , Then N/A 1.5 OK

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


q1,q2 =
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
P = L0 q(x) width(x) dx

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 5.760 2.400 2.400 2.7648 2.7648

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 12

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial) 2
Unit( kN , kN-m , kN/m )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F1 1 265.093 265.093 0.000 2.400 265.1 250.0(gross) 100 % NG

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 13

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , kN , kN-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
101 2400.00 2400.00 947.716 0.00 706.300
102 2400.00 2400.00 2117.328 0.00 1910.400
103 2400.00 2400.00 1692.328 0.00 1485.400
104 2400.00 2400.00 892.328 0.00 685.400
S1 X
105 2400.00 2400.00 1637.328 0.00 1430.400
106 2400.00 2400.00 1612.328 0.00 1405.400
107 2400.00 2400.00 609.246 0.00 454.050
108 2400.00 2400.00 159.246 0.00 4.050
F1
101 2400.00 2400.00 947.716 0.000 706.300
102 2400.00 2400.00 2117.328 0.000 1910.400
103 2400.00 2400.00 1692.328 0.000 1485.400
104 2400.00 2400.00 892.328 0.000 685.400
S1 Y
105 2400.00 2400.00 1637.328 0.000 1430.400
106 2400.00 2400.00 1612.328 0.000 1405.400
107 2400.00 2400.00 609.246 0.000 454.050
108 2400.00 2400.00 159.246 0.000 4.050

5.1.2 Design Parameters


Yield Strength - #6 ~ #18 : fy1 , #20 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

2
Unit(N/mm ,mm)
f(Flexure) f(Shear) f'c fy1 fy2 f_cl f_clt f_clb
0.9 0.75 25.00 390.00 390.00 50.0 50.0 50.0

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 14

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
As = fac b h , fac = 0.0018 ( User input)
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5
As As4
- The requirements of Eq (6.3.2) need not be applied, if every section As provided is
at least one -third greater than that required by analysis
As2 = r.req b d
As3 = 1.333 r.req b d
1.4
As4 = bd
fy
0.25 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy ( 1- 1-
0.85fck )
5.2.2 Check of Footing Reinforcement
Footing Name : F1 GroupType : Isolated
- X direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

108 top 12 - #16 @ 220 1.200 2.400 442.000 2412.743


S1
102 botom 14 - #18 @ 190 1.500 2.400 441.000 3562.566

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


108 top - - -
S1
102 bottom 357.299 0.851 0.0022

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

108 top 1080.000 - - 3808.000 3400.000 22331.820


S1
102 bottom 1080.000 2356.410 3141.094 3799.385 3392.308 22281.300

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
108 top 2412.743 1080.000 OK
S1
102 bottom 3562.566 3141.094 OK

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 15

- Y direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

108 top 12 - #16 @ 220 1.200 2.400 424.000 2412.743


S1
102 botom 16 - #18 @ 160 1.350 2.400 423.000 4071.504

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


108 top - - -
S1
102 bottom 486.323 1.258 0.0033

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

108 top 1080.000 - - 3652.923 3261.539 21422.380


S1
102 bottom 1080.000 3378.684 4503.785 3644.308 3253.846 21371.860

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
108 top 2412.743 1080.000 OK
S1
102 bottom 4071.504 3644.308 OK

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 16

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 X 102
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-2117.328 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Mubottom = 357.299 kN-m , Mutop = 0 kN-m

00

00
0
90

15

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

882.22 882.22

[B.M.D] [ kN-m ]

-357.3
-268
-178.6
-89.3
0
92.97 92.97
89.3
178.6
268
357.3
357.3

[B/L.M.D] [ kN-m / m ]

-148.9
-111.7
-74.4
-37.2
0
38.74 38.74
37.2
74.4
111.7
148.88
148.9

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 17

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 X 108
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-159.246 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Mubottom = 26.873 kN-m , Mutop = 0 kN-m

00

00
0
90

15

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

66.35 66.35

[B.M.D] [ kN-m ]

-26.9
-20.2
-13.4
-6.7
0
6.99 6.99
6.7
13.4
20.2
26.87
26.9

[B/L.M.D] [ kN-m / m ]

-11.2
-8.4
-5.6
-2.8
0
2.91 2.91
2.8
5.6
8.4
11.2
11.2

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 18

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 Y 102
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-2117.328 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Mubottom = 486.323 kN-m , Mutop = 0 kN-m

50

50

00
10

13

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

882.22 882.22

[B.M.D] [ kN-m ]

-486.3
-364.7
-243.2
-121.6
0
121.6 163.6 163.6
243.2
364.7
486.32
486.3

[B/L.M.D] [ kN-m / m ]

-202.6
-152
-101.3
-50.7
0
50.7 68.17 68.17
101.3
152
202.63
202.6

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 19

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
2400

F1 S1 Y 108
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-159.246 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Mubottom = 36.577 kN-m , Mutop = 0 kN-m

50

50

00
10

13

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

66.35 66.35

[B.M.D] [ kN-m ]

-36.6
-27.4
-18.3
-9.1
0
9.1 12.3 12.3
18.3
27.4
36.58
36.6

[B/L.M.D] [ kN-m / m ]

-15.2
-11.4
-7.6
-3.8
0
3.8 5.13 5.13
7.6
11.4
15.24
15.2

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 20

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
- f Vc = 0.75 1/6 fck B'w d
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Isolated PileType : False

Unit : mm
2400
2400

1791

1941

- X direction One-Way Shear (All Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 102 1941 441 2400 661.5 404.939 OK
- Y direction One-Way Shear (All Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 102 1791 423 2400 634.5 537.271 OK

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 21

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 X 102
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMy Moment intia 4
-2117.328 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Vu = -404.939 kN

00

41

00
0
90

15

19

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

882.22 882.22

[S.F.D] [ kN ]
794
794
595.5
404.94
397
198.5
0
-198.5
-404.94
-397
-595.5
-794

[S/L.F.D] [ kN / m ]
330.83
330.8
248.1
168.72
165.4
82.7
0
-82.7
-168.72
-165.4
-248.1
-330.8

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 22

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
2400

F1 S1 Y 102
Analysis Method
Conventional Rigid Method with reaction (Method 1)

2400
SFz SMx Moment intia 4
-2117.328 kN 0.000 kN-m 2.7648 m
Area 2 Contact Area 2 Critical Point Method
5.760 m 5.760 m (100 %) Critical Max Point
Critical Value
Vu = -537.271 kN

50

50

91

00
10

13

17

24
0

[ mm ]

[Loading]

[ kN , kN/m ]

882.22 882.22

[S.F.D] [ kN ]
926.33
926.3
694.7 537.27
463.2
231.6
0
-231.6
-463.2 -537.27
-694.7
-926.3

[S/L.F.D] [ kN / m ]
385.97
386
289.5 223.86
193
96.5
0
-96.5
-193 -223.86
-289.5
-386

Copyright (c) GS E&C. All Rights Reserved


29-01-2018

Project Na. : x
Calculation Sheet
of Project No. : Design Footing

Foundation Client : Example Page 23

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
f Vc1 = 0.75 1/6 (1 + 2/ b c) fck bo d
f Vc2 = 0.75 1/6 (1 + as d / 2 bo) fck bo d
f Vc3 = 0.75 1/3 fck bo d
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
Vu f Vc , then OK
where
b c = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

2
Ft.Name F1 Punching Area 771381.000 mm

2400 Pr.Name 1 Ratio Shade 0.866

Shape Rectangle f Vc1 1964.655 kN

L.Comb. 102 f Vc2 3413.340 kN


2400

Pl 600 mm f Vc3 1964.655 kN


1

Pw 300 mm f Vc 1964.655 kN

bo / d 3564 / 441 mm Vu 1654.559 kN

bc / as 2 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved