Professional Documents
Culture Documents
Reservoir Engineering I (Pdb2023) Assignment: Vle Due Date: Total: 10 Marks
Reservoir Engineering I (Pdb2023) Assignment: Vle Due Date: Total: 10 Marks
ASSIGNMENT: VLE
Due date: 11 December 2017 (11 am)
Total: 10 Marks
NOTE:
1. This is a group assignment.
2. Submission through ULEARN.
3. Late submission and any form of plagiarism will be penalized.
1. Perform a two-stage separator calculation for the following black oil. The bubble point
pressure of the reservoir liquid is 1750 psig at 220oF.