Professional Documents
Culture Documents
Introduction To Sustainable Design
Introduction To Sustainable Design
DESIGN STRATEGY
Contact us for a translation
This information is provided by the City of Port Phillip to inform residents about
Council services and responsibilities. For a translation of this information contact
the Council’s interpreter service.
Disclaimer:
This strategy and the associated appendix materials have been produced in
good faith with all information contained deemed to be correct at time of
adoption and subsequent publication. The City of Port Phillip and the
contributors listed above take no responsibility, legally or financially, for
any loss/damage to property/persons resulting directly/indirectly from this
policy in whole or part, its associated materials, or the interpretation there
of.
Front Cover: Gryphon House Extension, Finalist for Best Contribution for
Sustainable Development Small Scale, 2007 City of Port Phillip Design and
Development Awards
Architects: Simon and Freda Thornton
Features Include: Re-use of existing dwelling, passive solar design, thermal
mass, cross ventilation, photovoltaic solar energy system, solar hot water
system,
water storage, grey water system, plantation and recycled materials and drought
tolerant landscaping
1 INTRODUCTION 6
1.1 VISION 7
1.2 CONTEXT 8
5.2 PARTNERSHIPS
APPENDIX 1
PLANNING PRACTICE NOTE – PROCEDURES NO. 6 –
SUSTAINABLE DESIGN ASSESSMENT IN THE PLANNING PROCESS 37
APPENDIX 2
SUSTAINBLE DESIGN ASSESSMENT (SDA) STATEMENT 42
APPENDIX 3
KEY RATING TOOLS 46
APPENDIX 4
GLOSSARY OF TERMS 47
1.1
VISION
The original Sustainable Design Strategy The vision is to create a more sustainable
(2003) was implemented through the use urban environment, comprised of architecture,
of the Sustainable Design Scorecard landscapes, transport networks and
Residential, which was used on a infrastructure that are low carbon, water
voluntary basis by applicants during the sensitive and resource efficient in both
period 2002 – 2005 to assess the sustainability construction and operation.
of residential buildings. A review of the
strategy in 2006 led to the development and
endorsement of a formal council policy on
the issue, and a revised strategy document.
The 2006 Sustainable Design Policy and
Strategy extended the focus to non-residential
buildings, and since November 2005, the
Sustainable Tools for an Environmental
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 7
Performance Strategy (STEPS) tool for
residential developments and the Sustainable
Design Scorecard (SDS) for non-residential
development have been council’s preferred
methods of sustainability assessment of
building design.
CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY 7 7
1.2
CONTEXT
1.2.1 DEFINING
SUSTAINABLE DESIGN
The CoPP recognises that built form has a This includes but is not limited to the
significant impact on the greater environment following:
and that most current common development
• Eliminating the use of non-renewable
practices are not environmentally sustainable
resources.
in the long term. For the purposes of this
strategy, CoPP defines sustainable design as an • Eliminating air, soil and water pollution.
approach to building procurement and other • Creating healthy and accessible indoor and
urban development which works towards urban environments.
achieving zero net environmental impact.
• Protecting and enhancing natural eco-
systems and cycles.
• Supporting the conversion of ‘waste’ into
useful resources.
• Creating a built environment that is
resilient, flexible and adaptive to climate
change.
• Supporting decentralised electricity and
water systems.
• Supporting a move towards understanding
and implementing ‘positive development’
1.2.2 BUILDING
CLIMATE RESILIENCE
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 9
The global scientific consensus is that our To progress a local adaptive design approach,
climate is changing due to human-induced the City of Port Phillip encourages building
carbon emissions.This means we will have to design strategies such as:
design and build for increasingly uncertain and
• Harvesting rainwater for reuse
unpredictable future climate impacts on where
summers and less water availability will • Building flood and storm resilient buildings
have a significant impact on our existing • Building for maximum thermal efficiency to
neighbourhoods and precincts, and the way maintain year-round indoor comfort
buildings are designed, built and used in
the future.This does, and will continue, to • Reducing local heat island impacts through
challenge and revise current and emerging climate clever building materials and the use
legislative, planning and land use regulations of vegetation.
and standards for some time to come.
To meet the challenges of a changing climate
on our local built environment, the City
of Port Phillip is committed to facilitating
adaptive design to build local climate
resilience. Adaptive design works with nature
to gain climate clever solutions to living well
on the coast, with increased flooding and
rising temperatures.
CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY 9 9
.
1.3
AIMS + OBJECTIVES
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 11
1.3.1 SUSTAINABLE 1.3.2 SUSTAINABLE
DESIGN AIMS DESIGN OBJECTIVES
The City of Port Phillip aims to foster a built To achieve these aims, the following
environment that: objectives have been set in relation to
sustainable design in the CoPP:
• Moves towards elimination of the
use of non-renewable resources (such as • Influence redevelopment within the
fossil fuel based energy, mains water and municipality to facilitate the integration
materials) of sustainable design strategies into all new
private building projects and significant
• Moves towards the elimination of solid
renovation projects across the municipality.
waste production
• Advocate for sustainable design - to
• Moves towards the elimination of air, soil
work with government, industry and the
and water pollution
community towards an increasingly low
• Creates healthy indoor environments impact built environment.
• Protects and enhances natural ecological • Improve Council’s own sustainable design
systems and cycles performance - to facilitate the integration
of sustainable design strategies into all of
Council’s own built environment
development and major redevelopment
works, in line with Council’s environmental
commitments.
CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY 11 11
2 INTRODUCTION
SUSTAINABLE
DESIGN POLICY (2013)
The City of Port Phillip aims to be a proactive
of existing floor area
POLICY REQUIREMENTS
leader and an effective advocate for sustainable The Sustainable Design Policy requirements
design and development within the are:
municipality, including in undertaking its own All development applications to comply
building projects. with the Sustainable Design Assessment in
Port Phillip aims to ensure that buildings within the Planning Process (SDAPP) framework
the municipality are healthy to occupy, facilitate All development applications to submit
easy use of sustainable modes of travel, and are either a Sustainable Design Assessment
resilient to a changing climate. (SDA) or a Sustainable Management Plan
(SMP) depending on the size of the
VISION FOR A SUSTAINABLE BUILT proposed development
ENVIRONMENT All development applications to submit an
assessment using an applicable Ecologically
The vision is the creation of a more sustainable Sustainable Development (ESD) tool
urban environment, comprised of architecture,
landscapes and infrastructure that are low SUPPORTING DOCUMENTS
carbon, water sensitive and resource efficient The Sustainable Design Policy (2013) is
in both construction and operation; and is supported this strategy which outlines a
complemented by effective sustainable framework and actions for achieving the
transport networks. objectives of the policy.
POLICY OBJECTIVES KEY PERFORMANCE INDICATORS
Detailed Key Performance Indicators (KPIs) for
The objectives of the Sustainable Design Policy the policy requirements are outlined in section
are to: 6 of this strategy. These will measure progress
on the total number of applications which
Implement the Sustainable Design Strategy
submitted sustainable design criteria, the total
To facilitate the adoption of sustainable
number of applications which satisfied Council’s
design principles and construction techniques
requirements for sustainable design and the
into all types of development
total number of applications that used ESD tool
Influence development to achieve improved
assessments.
sustainable outcomes
To contribute to a more sustainable built RESPONSIBILITY
environment Responsible Manager -General Manager
Advocate for a more sustainable approach Environment and Planning
To work with the community, industry, and
government towards an increasingly low Responsible Department - Sustainability
impact built environment by communicating
about and advocating for broad adoption of REVIEW
sustainable design The Sustainable Design Policy (2013) will be
formally reviewed four years from the date of
POLICY SCOPE: its adoption.
The Sustainable Design Policy applies to:
Planning permit applications for all new
buildings and extensions to existing buildings
over 50m2 in floor area
Council’s own building projects for all new
buildings, extensions to existing buildings and
major refurbishments which alter at least 30%
12 12 CityCity
of Port Phillip | SUSTAINABLE DESIGN STRATEGY
CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY 13 13
3.1
DEFINING THE
SCOPE OF ELIGIBLE
APPLICATIONS
The strategy applies to all planning permit
applications submitted for the purpose of
constructing a building.
This includes the following residential buildings
(including all new buildings or extensions with
an increased floor area of 50m²)
• Detached house – a free standing dwelling,
may have some external walls located on
property boundaries, but not attached to
any other building.
Szencorp Building, Albert Rd, South Melbourne, Finalist
• Attached dwelling, row house or town for Best Contribution to Sustainable Development
– Large Scale, 2005 City of Port Phillip Design and
house – one of two or more dwellings in a
Development Awards. Architects: Synman Justin
side-by-side configuration with shared party Bialek (SJB)
walls and individual ground level entrances. Features Include: Passive solar orientation, effective
• Multiunit development – new, multi shading devices, daylight and motion sensors for
lighting, HVAC and security control, ceramic fuel cells
storeyed structure, with predominantly for power generation, gas powered air conditioning.
centralised car parking and internal access Australia’s first 6 Star Green Star - Office Design v1
to most apartments. Certified Rating for a refurbishment by the Green
Building Council of Australia.
• Addition of a roof top apartment – a new
structure above the existing top floor of an
existing building where there is an increase
• Industrial / laboratory.
in area of 50m2.
• Community / public building – including
• Residential component of a mixed use
civic, educational, religious, community,
development – one or more dwellings
health or similar uses.
that are part of a new or refurbished
14 14 CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY
3.2
SUSTAINABLE DESIGN ASSESSMENT
IN THE PLANNING PROCESS (SDAPP)
It is the City’s belief that the integration of design initiatives that will improve the
sustainable design provisions into the planning overall performance of the development
system should occur first and foremost at above minimum legal requirements,
the state level. As a comprehensive with reference to, but not limited to the
approach to sustainable design is yet to be following key ten environmental catogories:
addressed by the state government, council
Indoor environment quality
continues
CityCity
of Port Phillip
of Port | SUSTAINABLE
Phillip DESIGN
| SUSTAINABLE STRATEGY
DESIGN STRATEGY 15 15
Orange Grove House, Elwood
Architect: Fiona Winzar (www.winzar-architects.com.au)
Photography: Shania Shegedyn
Features Include: Passive solar design, thermal mass,
recycled and renewable timber, double glazing, highly
insulated envelope, hydronic heating, gas boosted solar
hot water, rainwater tanks and energy efficient lighting
• Ensuring an effective process for the The SDAPP program also involves an active
sustainability assessment of development educative process by council and council staff
applications by internally referring relevant including:
development applications to the Sustainable
• Training planning staff in environmental
Design Architect/Engineer or other
issues in general, and specifically in the use
appropriate person who will assess the
of the STEPS and SDS tools;
level of performance indicated in the SDA
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 17
3.3
SUSTAINABLE DESIGN
ASSESSMENT TOOLS
Since 2005 the preferred method for assessing
the environmental performance of planning
applications, and to assist in the completion of
SDA’s or SMP’s is to use one, or a
By using the STEPS tool, the developers of
combination of three tools:
residential buildings are strongly encouraged
• Sustainable Tools for an Environmental to achieve sustainable design outcomes within
Performance Strategy (STEPS) for each of the following categories:
residential developments, or
Energy efficiency
• Sustainable Design Scorecard (SDS) for
Energy peak demand
non-residential developments, or
Water use
• Green Building Council of Australia (GBCA)
suite of Green Star tools including Green Stormwater quality
Star Multi unit Residential, Education,
Materials
Industrial, Healthcare, Office, Retail or
Public Buildings, or Bicycle parking provisions
3.4
SDAPP FACT SHEETS
As part of the Sustainable Design Assessment in
Council's Planning Process, Council has produced
a set of fact sheets for each of the10 key
Sustainable Building Categories. The fact sheets
provide an overview of the SDAPP process,
detailed information, links to resources and clarify
Council’s best practice standards for each of the
categories.
3. Water Efficiency
Objective: to ensure the efficient use of water,
to reduce total operating potable water use and
to encourage the appropriate use of alternative
water sources.
Examples of design decisions:
Use efficient fixtures and fittings
Avoid the use of mains water for landscape
irrigation
Re–use water (e.g. greywater)
2020 20 City of
City of Phillip
Port Port Phillip | SUSTAINABLE
| SUSTAINABLE DESIGN
DESIGN STRATEGY
STRATEGY
7. Waste Management
Objective: to ensure waste avoidance, and reuse
and recycling during the construction and
operation stages of development.
Examples of design decisions:
Preparation of a construction Waste
Management Plan
Adoption of a demolition and construction
material recycling target.
Preparation of an operation Waste
Management Plan.
8. Urban Ecology
Objective: to protect and enhance biodiversity
and to encourage the planting of indigenous
vegetation.
Examples of design decisions:
Maintaining / enhancing the site's ecological
value
Creating resident amenity
Encourage biodiversity areas.
3.5
MAKING HERITAGE EVEN
MORE SUSTAINABLE
Over 80% of the City of Port Phillip is covered MOST
by some degree of heritage control. Council SUSTAINABLE
PREFERRED IMPROVED
recognises the significant value the community OUTCOME ENVIRONMENTAL
HERITAGE
places on heritage and the role these heritage
OUTCOMES PERFORMANCE
controls play in preserving this. However it is
important that these do not unnecessarily impede
the creation of a more environmentally friendly built
environment.
Council believes heritage considerations and FINANCIALLY
VIABLE
improved environmental performance to be
OPPORTUNITIES
mutually supportive and must be kept in careful
balance if the most sustainable outcomes are to
be achieved.
However circumstances may arise where the need
to improve a building’s environmental performance GETTING THE
will not be consistent with the relevant heritage
controls. In these circumstances, a balanced
BALANCE RIGHT
outcome must still be achieved. Generally, where
heritage controls would not be met Council would The most sustainable outcomes are achieved
only allow the environmental improvements if all when heritage, environmental and financial
other reasonable alternatives have been explored. considerations are kept in balance.
Each proposal is considered on its merits and
Council must take into consideration all relevant
planning controls associated with heritage.
Council acknowledges the significant role that
heritage controls can play in the creation of a
more sustainable built environment, including:
• Savings in embodied energy through retention of
existing structures and onsite materials
• Reduced construction time through adaptation of
existing structures
• Reduced demand for emissions-intensive non-
renewable materials
• Reduced waste and often improved
thermal mass
• Significantly longer building life compared to Jervois St, St.Kilda East, Best New Single Dwelling
more contemporary methods of design and or Alteration, 2010 City of Port Phillip Design and
construction Development Awards.
Architect: David Vernon
2222 22 City of
City of Phillip
Port Port Phillip | SUSTAINABLE
| SUSTAINABLE DESIGN
DESIGN STRATEGY
STRATEGY
Cyclist on foreshore bike
path in front of City of
Port Phillip toilet block.
by Gregory Burgess
Architects
overlays or heritage
3.6
controls.
THE ROLE OF
INCENTIVES
3.6.1 WAIVING OF 3.6.2 SUSTAINABLE
PLANNING PERMIT TRANSPORT
APPLICATION FEES - CAR PARKING RATES
To provide an incentive for their inclusion, The provision of car parking is an additional
and as part of the City of Port Phillip’s planning related issue of relevance to
commitment towards environmental and sustainable built environments. Council
social sustainability the planning permit supports sustainable transport initiatives,
application fee typically associated with the and will consider reduced car parking
following sustainable items, or combination requirements for a development application,
there of, will no longer be required: if that application is accompanied by both a
comprehensive sustainable transport plan
for the development, and a comprehensive
• Solar Hot Water System
Sustainable Design Assesment or Sustainable
• Photovoltaic Panels Management Plan outlining the improved
environmental performance of the proposal.
• Rainwater Tanks
The CoPP’s current car parking rates for
• Small-Scale Wind Turbines various land uses across the municipality in
• Upgrading of Existing Glazing light of empirical evidence and with reference
to Council policies relating to sustainable
• Adjustable/Fixed Awnings with no
transport options are outlined in the following
advertising
table:
• Skylights
• Grey Water Systems (approval also required
from Council’s Health Services Unit)
• Bicycle Storage
• Removal of Disused Car Space and/or
Crossover
• Initiatives to Improve Disabled Access
Additionally for applications of proposed
building works under $10,000.00 that include
any of the listed items above will also no
longer require a fast track application fee.
Note:To receive approval each application
must be consistent with the Port Phillip
Planning Scheme, including any relevant
Diagram 4 – Sustainable Transport and Onsite Parking
Standard
Planning Sustainable
Scheme Rate Empirical Rate (reduced) Necessary conditions
Land Use (spaces) (spaces) Rate (spaces) for sustainable rate
Dwelling Requirements to obtain sustainable rate
1 each 0-0.8 each (upper limit)
1 bedroom 1 each
1 each
1 each With or no more than 200 metres walk
2 bedroom 1 each
to edge of an activity centre
3 bedroom 2 each 2 each 2 each
No more than 200 metres to fixed rail
public transport
No more than 400 metres to supermarket
Strict control of on-street parking in
surrounding streets
No resident permits for future owner/
occupants
Provision of motor scooter/motorbike
parking on site
Small dwellings only
Additional requirements to obtain
sustainable rate (lower limit)
Participation in car share scheme or other
similar initiatives
Be located within a mixed-use
development or in an employment
precinct
Other contributions to sustainable
transport infrastructure services.
Other initiatives to reduce usage and/or
ownership of motor vehicles
Office 3.5/100m2 3.5/100m2 2.0 - 3.0
(unshared) /100m2
(unshared)
3.0/100m2
(shared) 2.0 - 2.8
/100m2
(shared)
Shop
Specialty Shop 8.0/100m2 4.0/100m2 N/A N/A
Supermarket 8.0/100m2 4.0/100m2
Restaurant 0.6 per seat 0.3 per seat N/A N/A
Note: Approval of reduced car-parking requirements is at the full discretion of Council, with approval determined on a case-by-case
basis and in accordance with the car parking provisions of the Planning Scheme
24 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
ACHIEVING BEST
PRACTICE OUTCOMES
Retail / commercial component of a mixed use
IN COUNCIL PROJECTS building – non-residential component of new or
refurbished building, where there is also a
4.1 DEFINING THE SCOPE OF residential component.
Extensions to any of the above – this includes
ELIGIBLE CAPITAL WORKS projects where there is an increase in gross floor
PROJECTS: area.
For all minor refurbishments and
The CoPP has an established methodology for
maintenance council building projects which
assessing the potential for sustainability initiatives
cover less than a 30% change to gross floor area
in all its capital works programs – including
and are below a construction budget of $200,000,
infrastructure, landscaping, urban renewal and
please refer to the City of Port Phillip’s
building works. This section refers only to the
Sustainable Building Improvement Plan and
buildings component of the CoPP capital works
Capital Works ESD Toolkit.
program and includes new development,
extensions and major refurbishments.
25 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
For private applications the City of Port Phillip has Council building works that do not require a
adopted the SDAPP process to encourage planning permit
sustainable design outcomes in the built
For projects below $1,000,000 where planning
environment (refer to Sustainable Design Strategy).
permission is not typically required or for projects
In order to show leadership within the Port Phillip where ESD consultants may not be engaged on the
community as well as more broadly within the project, the Sustainable Design Architect will assist
local government sector and industry, council will the project team in preparing documentation for
set the SDAPP process as a minimum benchmark sustainable design assessment. As a minimum a
for all of councils building works. Council will also Sustainable Design Assessment (SDA template –
strive for best practice and will implement the use refer to appendix) will be required to demonstrate
of the Green Star Assessment Program created by how the project has responded to each
the Green Building Council of Australia, and where environmental category outlined in the
this is not applicable council will use the Environmental Performance Requirements section.
Sustainable Design Scorecard.
City City
of Port Phillip | SUSTAINABLE DESIGN STRATEGY 27
4.5 ENVIRONMENTAL
PERFORMANCE
CONSIDERATIONS
The City of Port Phillip considers the following
environmental targets to be crucial areas where
projects can address specific targets set out in
relevant policies and strategies, and to also ensure
that developments are collectively reducing their
impact on different areas of the environment.
Energy: Stormwater
Minimum Requirement – BCA Compliance + 10% Minimum Requirement – To achieve minimum
(Section J for Class 2 – 9 Buildings) requirements for treating and filtering stormwater
Design considerations - Good solar orientation, in accordance with Urban Stormwater Best
fixed eaves/shading devices to north facing glazing Practice Environmental Management Guidelines
and operable shading devices to east and west (CSIRO 1999).
facing glazing, energy efficient lighting, renewable Design considerations – Water Sensitive Urban
energy systems, energy efficient HVAC systems, Design (WSUD) including detention through on-
energy efficient hot water systems, energy efficient site filtration, diversion from stormwater system,
appliances, and building tuning and commissioning. treatment on site prior to release, rain gardens,
swales and other stormwater treatment measures.
Best practice energy consumption would be a
building that is hyper-efficient and capable of
producing energy to exceed its demand (ie.
building is a net-exporter of energy and this can be
used to offset GHG emissions from streetlights).
As an interim measure, council should design
buildings where, on an annual basis, the energy
produced by the building is equal to or less than
the energy consumed from the energy grids. Betty Day Community Centre
Architects: K20 Architecture
Energy modelling should also be completed with
calculation of running costs of various designs,
operations and appliances.
Water
Minimum Requirement - Water efficient appliances
within one star of the best available WELS (Water
Efficiency Labelling Scheme) rated tap ware, toilets
and showers.
Design considerations – Rainwater storage tanks
for re-use, water efficient appliances, fixtures and
fittings, water efficient landscaping, grey water
treatment/storage systems.
Materials
Transport
Minimum Requirement – To ensure that a
Minimum Requirement – Bicycle Parking: Provide
significant percentage of materials specified in
secure bicycle storage spaces for at least 5-10% of
projects are either re used, recycled or are
building occupants based on 1 person per 15m² of
produced in an environmentally method and are
gross floor area.
certified.
Bicycle Facilities: Provide end of trip change
Design – Extent of retaining existing structures, re-
facilities (lockers and showers) for every 10 bicycle
use of existing materials (re-cycling where
spaces.
required), more environmentally friendly material
Car Parking: Reduce the need for on site car
types that are certified and/or justified as to what
parking in accordance with the City of Port Phillips
processes are involved in classifying the material as
Sustainable Parking Rates, refer to the Sustainable
environmentally friendly. Materials can be informed
Design Strategy.
by Ecospecifier, Good Environmental Choice
Design – Number and location of onsite bicycle
Australia (GECA) and other recognised
parking spaces and secure lockup facilities,
independent certifiers.
appropriate change facilities, and a reduction in on-
site car parking.
Indoor Environment Quality
Minimum Requirement – Comply with BCA
Biodiversity
requirements for natural daylight and natural
Design – use of indigenous plants in landscaping,
ventilation to habitable spaces. Ensure the quality
courtyards, green roofs and walling.
of indoor air is preserved by specifying materials
with minimal air pollutants and off gases.
Innovation
Design – Providing direct access to natural
Design – Inclusion and ‘locking in’ of innovative
daylight, providing direct access to natural
sustainable design solutions
ventilation, selecting low VOC paints and carpets,
low to no formaldehyde emitting joinery including
medium density fibreboard (MDF), plywood, and
particleboard, and provisions for indoor planting.
City City
of Port Phillip | SUSTAINABLE DESIGN STRATEGY 29
Figure 3 – Sustainable Design Assessment Tools for the City of Port Phillip
Project Type Approval Process Rating Tools
M>250- $1-3 MIL Moderate New Yes No Yes 5 60-74 Aus 161-210 Best
1000m2 Star Excellence Practice
Category
L>1000m2 >$3MIL Complex New Yes No Yes 6 75+ World 211+ Excellent
Star Leader
S<30% <$200K Simple Renewal No No No No – Refer BIP + ESD Toolkit No – Refer BIP + ESD
GFA Toolkit
M>30% - >$200K- Moderate Renewal No Yes No 4 Star 45-59 Best 114-160 Average
70% GFA 1MIL Practice
L>70% >$1MIL Complex Renewal Yes Yes Yes 5 Star 60-74 Aus 161-210 Best
GFA Excellence Practice
Characteristics - The capital works project will need to be applicable to one of either the size, budget or complexity to be
considered in each category. As ESD input will be required at the early scoping stage of a project, not all of the characteristics
will be known. Also some projects may not be satisfying one characteristic (ie a shed over 250m2) however it would be best
classed as a small building because it is considered a simple project. The category of the building can be agreed to by the
Sustainable Design Officer and the Project Sponsor at the scoping stage of the project.
Complexity – The complexity category is provided to be a final indicator for each project type. The following is an indication of
typical capital works projects that fall under each complexity category.
Simple Toilets, small pavilions kiosks / ticket boxes, depot buildings, car parks, larger sheds and non-habitable buildings or
structures
Moderate Pavilions, childcare and maternal and child health centres, aged/health care, senior citizens centres,
neighbourhood houses, community centres/halls, office buildings
Complex Libraries, aquatic recreation centres, sports stadiums, larger offices buildings, town halls, larger community
centres, arts and entertainment centres, and laboratories.
Cap Works Type – Type of Capital Works building project. New, Renewal or Upgrade.
PA – Planning Approval, mandatory for all capital works building projects over $1MIL
SDA – Sustainable Design Assessment, a one page statement indicating how the project responds to ESD environmental
categories. Suitable for projects under $1MIL
SMP – Sustainability Management Plan, a more comprehensive response to ESD suitable for moderate and complex building
projects over $1MIL. Typically prepared by ESD consultants.
Green Star – All projects should aim to achieve Green Star benchmarks where a Green Star rating tool is available for the
building type, and demonstrate how these benchmarks have been achieved. Where a Green Star rating tool is not available or
is in PILOT phase for the building type, an SDS assessment should be done instead. 'Flagship' projects should aim to achieve either
a 5 or 6 Star Green Star certified rating.
SDS – City of Port Phillips own sustainable design scorecard for non-residential buildings. The scorecard is intended to be used
where there is not a suitable Green Star assessment tool or where the Sustainable Design Officer and Project Sponsor deem it to
be more suitable. As a minimum each capital works building projects should achieve an SDS rating.
City City
of Port Phillip | SUSTAINABLE DESIGN STRATEGY 31
5.1
EDUCATION AND
ENGAGEMENT
design through the following information pathways: • Publishing articles regarding the Sustainable
Design Assessment in the Planning Process
• SDAPP Factsheets for the SDAPP process – (SDAPP) program.
www.portphillip.vic.gov.au/sdapp-fact-
32 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
32
5.2
PARTNERSHIPS
support of the Sustainable Design Assessment in In November 2008 the CoPP became a Gold
the Planning Process (SDAPP) program. Sponsor to the Green Star Public Buildings
Rating Tool. This tool is expected to become
The CASBE mission is “to provide a coordinated the new environmental standard for public
program to develop formal and consistent buildings (town halls, community centres, etc)
approaches to ESD, with a primary focus on the throughout Australia.
planning process.”
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 33
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 33
5.4
ADVOCATING FOR
LEGISLATIVE CHANGES
The CoPP believes that legislation relating to
the inclusion of sustainable design strategies
in the built environment is best delivered at
Key action – ESD Local Planning Policy a state and / or federal level. Council also
The planning system provides an believes there is a role for legislating both
opportunity to ensure that all new within the planning and building framework.
developments and major extensions are However, given the gaps that remain within
energy efficient and less greenhouse Australian building and planning legislation
intensive from their inception. Currently regarding comprehensive sustainability
there is a voluntary scheme called SDAPP requirements, Council will continue to
(Sustainable Design Assessment in the advocate for legislative change in this area,
Planning Process) which ensures that including but not limited to the following:
participating developments achieve
• Inclusion of comprehensive sustainable
n outcomes than minimum standard building
design requirements in planning policy and
requirements. The adoption of an ESD provisions.
Local Planning Policy would require that all
• Inclusion of comprehensive sustainability
eligible developments would contribute to
requirements, beyond energy efficiency, for
achieving Toward Zero targets building design and procurement.
• A link between building sustainability
requirements and measurable outcomes
including greenhouse gas emissions, potable
Key Action – Government Advocacy water use, and waste reduction.
Advocate for state government policy for • Seek detailed state government guidance on
ESD in state planning provisions. the implications of climate change for the
planning process.
Council believes the CASBE network is an
important framework for identifying and
consolidating support for legislative change,
and will continue to support actions within
the CASBE network that progress this issue.
Proposed Solar Demonstration Facility, Fennell St, Port
Melbourne
Applicants: Greenearth Energy
Artists impression of proposed Zenith Solar combined
heat and power arrays, subject to change and remains the
property of Greenearth Energy.
34 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
34
Inkerman Oasis Housing, St.Kilda. Finalist for Best
Contribution to Sustainable Development Large Scale,
2005 City of Port Phillip Design and Development
Awards
Architects:WILLIAMS BOAG Architects
Photography:Tony Miller
Features Include: Solar passive design, effective external shading,
thermal mass, renewable and exposed structural materials, grey
water recycling, water storage tanks.
REVIEW OF SDAPP
Referring to Council’s Sustainable
SUSTAINABLE Design Architect
• Proportion (in %) of all eligible planning
DESIGN STRATEGY applications which (participated) were
referred to Council’s Sustainable Design
This strategy and its initiatives are to be Architect.
reviewed by the Responsible Officer every
twelve months in conjunction with an annual Addressing Sustainable Design
review of the position description and forward • Proportion (in %) of all eligible planning
planning process, to ensure consistency applications which addressed sustainable
between the strategic direction outlined in this design issues and received a planning permit
document and the actual actions and
methodologies undertaken by Council. Using Council’s Sustainable Design Assessment
The Sustainable Design Strategy 2013 will Tools
be formally reviewed within four years of its • Proportion (in %) of all eligible planning
adoption. applications which completed a Green Star
The following items are intended to ensure / STEPS / SDS assessment and received a
the ongoing relevance of this Strategy. planning permit.
3. PRE-APPLICATION DISCUSSIONS
Council officers are encouraged to discuss sustainable design in all pre-application meetings for development
applications. In particular;
• Council’s ESD Engineer / Architect should be invited to pre-application meetings if possible.
• The applicant should be encouraged to summarise their approach to sustainability in a ‘Sustainable Design
Assessment’ or ‘Sustainability Management Plan’, the creation of which can be supported by the use of
the STEPS, Green Star and SDS tools.
• The applicant should be made aware of the expectation for level of detail of information requested based
on the type and size of their development application
• Where possible the information contained in the assessment should be reflected on the town planning
drawings.
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 37
38 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
6. INITIAL ASSESSMENT OF AN APPLICATION
Depending on the level of detail and quality of information provided by the applicant there are several
different scenarios and responses available to the statutory planner; in consultation with the ESD Engineer /
Architect.
Lodgement Scenario 1 – Submitted and Satisfactory
If at the time of lodgement, the applicant has submitted a Sustainable Design Assessment (SDA) this should
be assessed by the ESD officer as part of the application’s preliminary assessment. If the level of information
is satisfactory, the sustainable design initiatives incorporated in the SDA or SMP are appropriate and the
sustainable design initiatives have been marked on plans where appropriate, then the following conditions
could be incorporated on permit, along with SDA or SMP and town planning drawings which demonstrate
the initiatives endorsed. (Chart below)
Sustainable Design Assessment (SDA) Sustainability Management Plan (SMP)
The development must incorporate Prior to the occupation of any building approved under this
the sustainable design initiatives in permit, a report from the
accordance with the endorsed SDA author of the SMP report, approved pursuant to this permit,
to the satisfaction of the Responsible or similarly qualified person or company, must be submitted
Authority to the Responsible Authority.The report must be to the
satisfaction of the Responsible Authority and must confirm
that all measures specified in the SMP have been
implemented in accordance with the approved Plan
Lodgement Scenario 2 – Submitted and Unsatisfactory
If the level of information provided is unsatisfactory, and / or the sustainable design initiatives incorporated
in the SDA or SMP are inappropriate for the size or type of development or the sustainability initiatives
have not been marked on plans, then a Request for Further Information (RFI) should be sent to the
applicant outlining these issues.These should be included in the Issues section of the RFI for SDA’s and
the further information required section for SMP’s. Example text for RFI’s is provided below.These can be
used in combination depending on the nature of information submitted by the applicant.These SDA / SMP
requirements may be separated out so they can be copied into standard letters.
1. Council requests that applicants make a commitment to improving the sustainable design elements of their
development above the minimum compliance requirements of the building code in accordance with
Council’s direction for a more sustainable municipality.The requirements for lodgement are shown on the
accompanying flyer / brochure or at (http://www.portphillip.vic.gov.au/sustainable_design.htm).To enable
comprehensive assessment by council, the Sustainable Design Assessment / Sustainability Management
Plan provided should be amended to include the following further information to assist in councils
assessment of your application;
a. ESD engineer/architect advice inserted here
b. ESD engineer/architect advice inserted here
2. To ensure consistency between the Sustainable Design Assessment / Sustainability Management Plan and
plans for the development, the town planning drawings should be amended to incorporate the following
sustainable design elements as identified in the Sustainable Design Assessment / Sustainability
Management Plan provided;
a. ESD engineer/architect advice inserted here
b. ESD engineer/architect advice inserted here
3. From the information provided in the Sustainable Design Assessment / Sustainability Management
Plan the development does not satisfy minimum STEPS/SDS targets / achieve a best practise standard.
Easily achievable ESD initiatives have been identified to bring the developments towards a best practise
standard and to a level that is considered appropriate for a development of this scale. Please refer to
council’s ESD Assessment (attached) for more information.
4. To assist you in completing a satisfactory Sustainable Design Assessment / Sustainability Management Plan,
council suggests you talk to council’s ESD Engineer / Architect / statutory planning department and agree
on the level of sustainability you are seeking to achieve in your development and the means of assessing
compliance.City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 29
City
City of
ofPort
Port Phillip
Phillip || SUSTAINABLE
SUSTAINABLE DESIGN
DESIGN STRATEGY
STRATEGY 39
39
Lodgement Scenario 3 – Not Submitted
If, at the time of lodgement, the applicant has not submitted an SDA/SMP an RFI should be sent to the
applicant detailing this request.This should be included in the Issues section of the RFI for SDA’s and the
further information required section for SMP’s. Example text is provided below;
• Council requests that applicants make a commitment to improving the sustainable design elements of
their development above the minimum compliance requirements of the Building Code of Australia (BCA)
in accordance with Council’s direction for a more sustainable municipality.To enable assessment by
Council, provision of a Sustainable Design Assessment (SDA) / Sustainability Management Plan (SMP) that
outlines the development’s sustainable design initiatives is requested.These are then assessed by council
as part of the overall planning assessment process. An SDA / SMP should incorporate consideration of the
following sustainable design elements;
• Indoor environment quality
• Energy efficiency
• Water resources
• Stormwater management
• Building materials
• Transport
• Waste Management
• Urban Ecology
• Innovation
• Ongoing building and site management
Applicants are encouraged to use the Sustainable Design Scorecard (SDS) (non-residential) and STEPS
(residential) assessment tools. More information on these tools and the requirements of a Sustainable
Design Assessment / Sustainability Management Plan is available on the accompanying flyer / brochure or at
(http://www.portphillip.vic.gov.au/sustainable_design.htm).
7. PROCESS OF NEGOTIATION
Each application scenario is different and the success in securing the sustainability outcomes of any given
development is dependent on negotiation and the willingness of the applicant to engage in the process.
Depending on the council context and the outcomes of sustainable design negotiation, the following
scenarios are likely at the time of issuing a permit for the development. Permit scenario 1
is considered the best-case scenario.
8. PERMIT SCENARIOS
Permit Scenario 1
The SDA/SMP has been provided and sustainable design initiatives marked on plans.The sustainable design
initiatives are considered appropriate in the context of the development.
Process – Endorse SDA/SMP and condition as follows;
40 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
Permit Scenario 2
The SDA/SMP has been provided and sustainable design initiatives are considered appropriate in the context
of the development. Some sustainable design initiatives are not marked on plans.
Process – Endorse SDA/SMP and condition as follows;
AND…
Condition 1
Before the development commences, amended plans must be submitted to the satisfaction of the
Responsible Authority.When approved, the plans will be endorsed and then form part of the permit.
The plans must be generally in accordance with XXXX but modified to show; Outline sustainable design
initiatives,TP Drawings in addition to any other non ESD initiatives required to be amended.
Permit Scenario 3
In situations where an applicant has not shown an outcome which they intended to in either an SDA or SMP,
or they did not submit an SDA or SMP when they indicated otherwise, it is likely that council will impose a
condition in accordance with clause 21.03 Ecologically Sustainable Development of the local planning policy.
10. NOTES
• The submission of a SDA/SMP does not delay the overall application process
• The ESD Engineer / Architect should be available to assist planners, liaise with applicants and can attend
meetings if/when required.
• The assessment tools have been designed so that with a little instruction the average architect/designer
should be able to complete them.Training is however available on request.
• Planners should not undertake STEPS/SDS assessments, as it is the applicants who are committing to the
design strategies and they who need to tell you how they are addressing sustainable design.
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 41
APPENDIX 2
SUSTAINABLE DESIGN ASSESSMENT (SDA) STATEMENT
Sustainable Design Assessment Tools
2. ENERGY EFFICIENCY
Objective: to ensure the efficient use of energy, to reduce total operating greenhouse emissions and to
reduce energy peak demand.
Considerations:
• Energy rating of building fabric in excess of minimum BCA requirements
(Provide preliminary energy ratings NatHERS, NABERS Energy, etc)
• External shading devices to north, east and west facing glazing
(Provide description and show fixed/operable shading devices on relevant elevation/section drawings)
42 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
• Heating system types and associated energy-efficiency rating/benchmark
(At least one star within the best available www.energyrating.gov.au)
• Cooling system types and associated energy-efficiency rating/benchmark
(At least one star within the best available www.energyrating.gov.au)
• Hot water system type and associated energy-efficiency rating/benchmark
(At least one star within the best available www.energyrating.gov.au)
• Location of fixed clothes drying lines/ racks
(Provide description internal/external and size available, show on relevant floor plans)
• Lighting strategy
(Provide description/table for main habitable areas considering fluorescent, compact fluorescent, or LED
lights)
• Location and size of renewable energy systems including photovoltaic (PV) solar power, solar hot water,
wind turbines, geo-thermal etc.
(Provide description of system type, size and features and show on relevant floor/roof/site plan drawings)
3. WATER EFFICIENCY
Objective: to ensure the efficient use of water, to reduce total operating potable water use and to
encourage the appropriate use of alternative water sources.
Considerations:
• Water-efficiency rating of new showerheads
(Provide description, suggested minimum 3 Star WELS rating than 4.5L/min. but not more than 6.0L/min)
• Water-efficiency rating of new tapware
(Provide description, suggested minimum 5 Star WELS more than 4.5L/min. but not more than 6L/min.)
• Water efficiency rating of new toilet cisterns
(Provide description, suggested 4 Star WELS rating more than 4.0L but not more than 3.5L average flush
volume)
• Size, capacity and location of rainwater tanks, including catchment area and where the water is expected
to be used (toilet flushing, garden irrigation, etc)
(Provide description and show on relevant floor/roof/site plan drawings)
• Provisions for a more water efficient landscaping
(Provide description and show on relevant floor/roof/site plan drawings)
• Size and general location of greywater treatment/storage systems
(Provide description, suggested EPA only approved systems and show on relevant floor/site plans)
4. STORMWATER MANAGEMENT
Objective: to reduce the impact of stormwater run-off, to improve the water quality of stormwater run- off,
to achieve best practice stormwater quality outcomes in accordance with Urban Stormwater Best Practice
Environmental Guidelines (CSIRO 1999) and to incorporate the use of water sensitive urban design, including
stormwater re–use.
Considerations:
• Total site area
(Provide description of shape, topography and area in m² show on relevant floor/site plans)
• Total number and area of impervious surfaces and their related treatments prior to off-site release
(Provide description/table of each impervious surface and their related treatments)
eg. Roof area 01 250 m² connected to rainwater tank
Roof area 02 50m² connected to raingarden
Concrete driveway 80m² none
• Total number and area of pervious surfaces (detention through on-site filtration)
(Provide description/table of each pervious surface and their type)
eg. Lawn area 100 m² grass and soil
Pathway 50m² crushed aggregate on sand and soil
• Provide additional STORM calculations (www.storm.melbournewater.com.au/)
(Enter municipality (Port Phillip, site area, address, development type and all impervious surfaces and
their related treatments (if none, select none) A minimum score of 100% is acceptable, print and attach
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 43
report to this statement and the STEPS assessment if conducted.
5. MATERIALS
Objective: to minimise the environmental impacts of materials used by encouraging the use of materials with
a favourable lifecycle assessment.
Considerations:
• Retention of existing structure and materials (Provide a description of the intended re-use of existing
structures and/or materials within the proposed design and show on relevant floor/site/demolition plans
and elevations/sections)
• More environmentally friendly material types being used, and their sources (Provide a description of
intended materials to be used that have sustainable production processes (including low embodied energy,
recycled content and reuse, sustainable plantations etc) and list their independent sources of verification
including environmental lists (GECA, Ecospecifier, Moreland Greenlist, Green Star etc) and industry bodies
(Forest Stewardship Council, Australian Steel institute Sustainability Charter etc)and show on relevant
floor/site/demolition plans and elevations/sections)
• Reusability and recyclability of materials (Provide a description of intended materials to be used that have
already been recycled and/or their potential to be recycled once they have finished their purpose for this
design and show on relevant floor/site/demolition plans and elevations/sections)
6. TRANSPORT
Objective: to minimise car dependency and to ensure that the built environment is designed to promote the
use of public transport, walking and cycling.
Considerations:
• Priority for access and movement around site by walking (Provide a description of how the design
addresses access and movement for walking)
• Provide convenient and secure bike storage facilities for building users and guests
(Provide the total number of bike storage facilities and ratio to the total number of building users and
guests and show on relevant floor/site plans)
• Provide end of trip change facilities for bike users
(Provide a description of how the design provides end of trip change facilities for bike users and ratio to
the total number of on-site bicycle storage spaces)
• Access to public transport (Provide a description of the sites proximity and access to public transport
and show on relevant site plans)
• Access to car share services (Provide a description of any on or off site car share service and show on
relevant site plans)
• Reduction in extent of onsite car parking
(Provide a description of any parking dispensation being sought and provide details for consideration
eg. green travel plan)
7. WASTE MANAGEMENT
Objective: to ensure waste avoidance, and reuse and recycling during the construction and operation stages
of development.
Considerations:
• Allocated space(s) for general waste, recycling and green waste (Provide a description of storage space
for each class of waste and accessibility for building users and waste contractors at the point of disposal
and collection and show on relevant site/floor plans)
• Operation Waste Management Plan
(Provide description of how operational waste will be managed through the occupied life of the building)
• Construction Waste Management Plan
44 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
(Provide description of how construction waste will be managed through the construction process
including material sorting, disposal and targeted recycling rates)
8. URBAN ECOLOGY
Objective: to protect and enhance biodiversity and to encourage the planting of indigenous vegetation.
Considerations:
• Existing Landscaped Area (provide the size (m²) of the existing landscaped areas)
• Proposed Landscaped Area (provide the size (m²) of the proposed landscaped areas)
• Impacts on existing site ecology
(provide a description of all new, and existing retained landscaped areas and indicate how the design
response has enhanced, maintained or reduced the sites biodiversity and show on relevant site/floor/
landscape plans)
• Retention and inclusion of native vegetation
(provide a description of how the design has retained native vegetation and allowed for drought tolerant
native vegetation show on relevant site/floor/landscape plans)
9. INNOVATION
Objective: to encourage innovative technology, design and processes in all development, so as to positively
influence the sustainability of buildings
Considerations:
• Significant enhancement of best practice ESD standards
(provide a description of how design exceeds best practice standards ie NatHERS 10 star dwelling)
• Unique sustainable design element or new technology implemented to enhance ESD outcomes (provide
a description of how the design implements unique/new methods and strategies to enhance design
outcomes)
• Excellent passive design approach
(provide a description of how the design implements passive design strategies that maximise natural
resources and minmise greenhouse gas emissions aiming to be carbon neutral)
• Responding to local climate conditions
(provide a description of how the design responds to local climate conditions which enhance ESD
outcomes)
City of Port Phillip | SUSTAINABLE DESIGN STRATEGY 45
APPENDIX 3
KEY RATING TOOLS
Green Star SDS
(http://www.gbca.org.au/green-star/) (www.portphillip.vic.gov.au/sds.htm)
Green Star is a comprehensive, national, Sustainable Design Scorecard.The SDS is a website
environmental rating scheme that evaluates the tool that measures the environmental impacts of
environmental design and achievements of buildings. a design. It is an Excel document that rates seven
It covers a number of categories that assess the categories including energy efficiency, materials,
environmental impact that is a direct consequence transport, water, indoor environmental quality,
of a project’s site selection, design, construction and waste, and ESD excellence.
maintenance. The SDS can be used to rate a proposed or existing
commercial building, retail building, industrial
Music building, or retail or commercial component of a
(http://www.toolkit.net.au/music) mixed-use building.
Model for Urban Stormwater Improvement
Conceptualisation. A tool that simulates urban STEPS
stormwater systems. Water quality and peak (www.sustainablesteps.com.au)
flows can be assessed against design constraints or Sustainable Tools for Environmental Performance
requirements. Strategy. STEPS is a website tool that measures the
environmental impacts in the design of a home.
National Australian Built Environment Rating
It rates five categories including mains (drinking
Scheme (NABERS)
water) use, building material impacts, greenhouse
(http://www.nabers.com.au/)
emissions, peak energy use and stormwater quality
The NABERS tool rates the operational impacts of leaving the property. It also calculates the number
a building on the environment. It can be used during of bicycle places required and space needed for
the design phase to predict base building ratings waste recycling services relative to the size of the
and establish benchmarks and likely outcomes. It is development.
able to distinguish between the tenancy and base
STEPS can be applied to the design of a new or
building and therefore can identify and detail areas
existing house, town house, multi-unit development,
for improvement. Official ratings cannot be achieved
or residential component of a mixed-use building.
until the building has been operational for 12
months. NABERS applies to offices, hotels, retail and STORM (http://storm.melbournewater.com.au/)
residential buildings,
Melbourne Water has developed the Stormwater
Nationwide House Energy Rating Scheme Treatment Objective – Relative Measure (STORM)
(NatHERS) Calculator as a method of simplifying the analysis
of stormwater treatment methods.The STORM
(http://www.nathers.gov.au/)
Calculator is designed for the general public to
NatHERS provides a framework that allows various easily assess Water Sensitive Urban Design (WSUD)
computer software tools to rate the potential measures on their property.
energy efficiency of Australian homes. It defines the
The tool has been developed specifically for small
minimum set of information that must be used by
residential, commercial and industrial developments
all software tools.The different softwares report
to rate how well different properties treat
on the building fabric of a house and shows how
stormwater and to compare them against a
a particular design will use energy for heating and
common measurement system.
cooling, assisting in the design of an energy efficient
solution. Using one of the approved softwares, i.e.
FirstRate, Accurate or BERS allows building permit
applicants to proof compliance with BCA.
46 City of Port Phillip | SUSTAINABLE DESIGN STRATEGY
APPENDIX 5
GLOSSARY OF TERMS
BEST PRACTICE GREENHOUSE GASES
A combination of techniques, methodologies “those gases, such as water vapour, carbon dioxide,
and systems that, through experience and research, have tropospheric ozone, methane, and low level ozone
reliably led to optimum ESD outcomes. Best practice that are transparent to solar radiation, but opaque
in the built environment encompasses the full life to long wave radiation’, and which contribute to
cycle, from clearing of existing site conditions; design; the greenhouse effect. Ref: http://www.mem-
construction and ongoing occupation; through to final algeria.org/environment/climate_change_terms.pdf
demolition or recycling.
INDOOR ENVIRONMENT QUALITY
CLIMATE RESILIENCE the quality of a work environment based on the
The OECD identifies two approaches to the definition impact of the base building and the building fitout
of ‘resilience’ in the context of climate change; firstly on human health. Issues considered generally
“The amount of disturbance a system can absorb include temperature, air quality (including
and still remain within the same state or domain of ventilation and contaminants), lighting quality,
attraction” and secondly “The degree to which the noise, spatial layout, visual and acoustic privacy,
system is capable of self-organisation”. For the purposes furnishings, and views.
of this policy, climate resilience is defined as the ability of
Postal Address:
City of Port Phillip
Private Bag 3, St Kilda,Vic 3182
ASSIST Call Centre: 9209 6777
Facsimile: 9536 2722
Website: www.portphillip.vic.gov.au
Email: assist@portphillip.vic.gov.au
TTy (hearing impaired telephone typewriter): 9209 6713
See the National Relay Service for more information
SMS for the hearing impaired: 0432 005 405
Please contact ASSIST on 9209 6777 if you
require a large print version of this brochure
For a translation of this information contact the Council’s
interpreter service
9679 9810
Κλήσεις στα ελληνικά 9679 9811
Polski telefon 9679 9812
На русском языке – звоните по тел 9679 9813
For all other languages call 9679 9814