Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

ICCT COLLEGES FOUNDATION INC.

V.V SOLIVEN II, CAINTA RIZAL

COMMUNICATION THEORY 3

(WIRE COMMUNICATION)
(ECE423)

SUBMITTED BY:

AGUSTIN JR, RICARDO

BALUYAN, NORWELLE

FAJARDO, JONAS

LABAY, JONATHAN

BSECE / A82/ TTHS


SUBMITTED TO:

ENGR. IVANLEE MENDOZA

City/Barangay: Marick Subdivision, Brgy Sto Domingo Cainta, Rizal


Number of Cabinets: 2 Cabinets (CNT 703, Main)
Specification / Description:
 Underground wiring from Central Office to barangays then aerial wiring
to each subscriber.
 Consist of at least 2 cabinets in this Barangay.
 Consist of 300 subscribers in each cabinet, 100 per column depending
upon the number of subscriber.
 Additional cabinet in a barangay, consist of 500 subscriber or at least
500 subscribers.
 Used Copper wire (solid).
 PLDT Cainta branch (Central Office).
 Primary load of a cabinet is 250,300,400.
 Secondary load 600 (1-60db).
 Wiring of Electrical (MERALCO) is separated from Telephone Wiring.
 Physical appearance of a cabinet is made of fiber glass, (Outer)
Stainless (Inner).
 Measuring Fault for copper, Dynatel,Actherna,and Dayar.
 Used fuse for cabinet protection.
 Test Equipment is VOM (Analog), and dial tone/LED for indicator.
 System in Central Office has the ability to cut off the connection from
the subscriber.
 UY connector and UG connector is used for wiring in underground.

Reference: PLDT Cainta Branch, FASTEL SERVICES INC.

You might also like