Method Statement-Ndt Plug PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 13
@pgawsll gSolyl ca Wasit Gas Plant Package Package #1 ‘Saudi Aramco ‘SK Engineering & Construction Co. Ltd. Ghertelotc = SK Client Saudi Aramco [Document No. _ : HOTC-DOC-003 METHOD STATEMENT FOR NDT PLUG INSTALLATION For Piping, Tanks and Equipment (REV.A) HSEM acm ———— WY A_ [04-Aug-2014] For Approval | B.Landicho | Hardeep Singh SKEC.CM. SKEC PM Rev. | DATE STATUS Prepared by | Checked by Reviewed by | Approved by No. 1.0 2.0 3.0 4.0 5.0 7.0 8.0 9.0 WASIT GAS PLANT, Method Statement for Hot Insulation | Doc. No Package #1 REV.NO A TANKS PAGE 20f7 INDEX Title Page General 1 Scope 3 12 Reference specification 13 Priority Materials 3 24 Inspection Plugs 3 22 ‘Storage and handling 4 23 Material Data 4 Preparation 4 Identification of UT Plug requirements 4 UT Plugs requirements 5 Installation 5 Quality Control 5 7A Quality Control material 5 Le Quality Control before Installation 5 73 Quality Control during Installation 6 74 Quality Control During inspection 6 75 Quality Control Records 6 78 Quality Manager 6 a QC Supervisor/QC Inspector Duties and Responsibility 7 Safety a4 Material Safety Data Sheet 7 82 Personal Protective Equipment 7 83 working at heights 7 Attachment a4 Data Sheet 7 9.2 JSA 7 20f7 WASIT GAS PLANT, Method Statement for Hot Insulation | Doc. No. Package #1 REV.NO A TANKS PAGE 3of7 GENERAL 14 1.2 13 Scope: This method statement covers the general requirements for materials and application of external thermal Insulation on Piping Tanks and Equipments , for the Wasit Gas Program ‘Saudi Aramco. To attain the optimal peak process performance. Reference Specification: The following Specifications apply for the project with latest revision, ‘SAES-N-001 Basic Criteria Industrial Insulation, EPA and OSHA —_Inspection Point Access ASTM Designation EPDM 2000, 2BA, 510, A14, 813, C12, F17 ASTM Designation Silicon D2000, 2GE, 506, A19, B37, F19 Priori Any conflict exist between the requirements of the listed specifications and related codes, data sheets, drawings, requisitions, etc., it should immediately be brought to the attention of the SKEC/Saudi Aramco and an acceptable solution must be reached Wherever a difference exists between the method statement & specification the specification shall govern. However, no deviations shall be made from the specification without written authorisation from the Saudi Aramco. MATERIALS All materials to be used in this project shall be approved by Saudi Aramco. Pre- qualification documents shall be submitted to Saudi Aramco for approval prior to use. All materials to be used in this project should be in accordance with the project specifications. HertelOTC's Quality Inspector, SKEC and Saudi Aramco nominated representative should carry out an inspection and approve all materials before any job is carried out for the project. NDT Plug materials and accessories used for this project shall be delivered to site and Hertel shall ensure that all materials are protected from being damaged prior to installation. Only the materials that shall be used in a given workday shall be stored in the immediate work area. All materials shall be stored at locations designated by SKEC. 2.1 Inspection Plug a 2. 3, 4 NDT Plugs materials for Piping Tanks and Equipment shall be in accordance with section 2.3 of this method statement. UT Plug shall be installed on Pipe, Tee, Reducer, and Nozzle of the Tanks and Equipment UT plug shall be installed on Tanks and Equipment near flat form area. Other location shall be identified by SKEC Engineering with Aramco approved Isometric Drawings UT Plug shall be installed on 4 O'clock, 6 O'clock, 8 O'clock or as per the requirement of drawing issued by SKEC. 30f7

You might also like