@pgawsll gSolyl ca Wasit Gas Plant Package Package #1
‘Saudi Aramco
‘SK Engineering & Construction Co. Ltd.
Ghertelotc =
SK
Client Saudi Aramco [Document No. _ : HOTC-DOC-003
METHOD STATEMENT FOR NDT PLUG INSTALLATION
For
Piping, Tanks and Equipment
(REV.A)
HSEM acm
———— WY
A_ [04-Aug-2014] For Approval | B.Landicho | Hardeep Singh SKEC.CM. SKEC PM
Rev. | DATE STATUS Prepared by | Checked by Reviewed by | Approved byNo.
1.0
2.0
3.0
4.0
5.0
7.0
8.0
9.0
WASIT GAS PLANT,
Method Statement for Hot Insulation | Doc. No
Package #1 REV.NO A
TANKS
PAGE 20f7
INDEX
Title Page
General
1 Scope 3
12 Reference specification
13 Priority
Materials 3
24 Inspection Plugs 3
22 ‘Storage and handling 4
23 Material Data 4
Preparation 4
Identification of UT Plug requirements 4
UT Plugs requirements 5
Installation 5
Quality Control 5
7A Quality Control material 5
Le Quality Control before Installation 5
73 Quality Control during Installation 6
74 Quality Control During inspection 6
75 Quality Control Records 6
78 Quality Manager 6
a QC Supervisor/QC Inspector
Duties and Responsibility 7
Safety
a4 Material Safety Data Sheet 7
82 Personal Protective Equipment 7
83 working at heights 7
Attachment
a4 Data Sheet 7
9.2 JSA 7
20f7WASIT GAS PLANT,
Method Statement for Hot Insulation | Doc. No.
Package #1 REV.NO A
TANKS
PAGE 3of7
GENERAL
14
1.2
13
Scope:
This method statement covers the general requirements for materials and application of
external thermal Insulation on Piping Tanks and Equipments , for the Wasit Gas Program
‘Saudi Aramco. To attain the optimal peak process performance.
Reference Specification:
The following Specifications apply for the project with latest revision,
‘SAES-N-001 Basic Criteria Industrial Insulation,
EPA and OSHA —_Inspection Point Access
ASTM Designation EPDM 2000, 2BA, 510, A14, 813, C12, F17
ASTM Designation Silicon D2000, 2GE, 506, A19, B37, F19
Priori
Any conflict exist between the requirements of the listed specifications and related codes,
data sheets, drawings, requisitions, etc., it should immediately be brought to the attention
of the SKEC/Saudi Aramco and an acceptable solution must be reached
Wherever a difference exists between the method statement & specification the
specification shall govern. However, no deviations shall be made from the specification
without written authorisation from the Saudi Aramco.
MATERIALS
All materials to be used in this project shall be approved by Saudi Aramco. Pre-
qualification documents shall be submitted to Saudi Aramco for approval prior to use.
All materials to be used in this project should be in accordance with the project
specifications. HertelOTC's Quality Inspector, SKEC and Saudi Aramco nominated
representative should carry out an inspection and approve all materials before any job is
carried out for the project.
NDT Plug materials and accessories used for this project shall be delivered to site and
Hertel shall ensure that all materials are protected from being damaged prior to
installation.
Only the materials that shall be used in a given workday shall be stored in the immediate
work area. All materials shall be stored at locations designated by SKEC.
2.1 Inspection Plug
a
2.
3,
4
NDT Plugs materials for Piping Tanks and Equipment shall be in accordance with section
2.3 of this method statement.
UT Plug shall be installed on Pipe, Tee, Reducer, and Nozzle of the Tanks and Equipment
UT plug shall be installed on Tanks and Equipment near flat form area.
Other location shall be identified by SKEC Engineering with Aramco approved Isometric
Drawings
UT Plug shall be installed on 4 O'clock, 6 O'clock, 8 O'clock or as per the requirement of
drawing issued by SKEC.