RENCANA ANGGARAN BIAYA SUB PEKERJAAN MEKANIKAL DAN PLUMB
a. b. c.
III. PEKERJAAN INSTALASI AIR BERSIH
3.1. SENTRAL AIR BERSIH
A. SITE
1 Deep Well unit
Kap. Pump 150 lt/m Head 80 m 220V-3ø-50 HZ
(Panel Kontrol,Aksesories Pompa)
2 P.D.A.M set
(Meter air dan Gate Valve)
3 Sistem Penyaringan Air set
-Sand filter ( 1 Unit)
-Carbon filter (1 Unit)
-Aksesories dan Fitting
Gate Valve 10K Dia. 50 mm (3 Bh)
Gate Valve 10K Dia. 25 mm (2 Bh)
- Pipa Instalasi Sistem (1 ls)
4 Transfer Pump set
- Centrifugal pump (2 Unit)
Kap. 220 ltr/m
Head 35 m
Daya listrik 220-3ø-50Hz
Panel Kontrol
-Aksesories dan Fitting
Chek Valve 10K Dia. 50 mm (2 Bh)
Chek Valve 10K Dia. 65 mm (2 Bh)
Gate Valve 10K Dia. 50 mm (2 Bh)
Gate Valve 10K Dia. 65 mm (2 Bh)
Flexible Joint 10K Dia. 50 mm (2 Bh)
Flexible Joint 10K Dia. 65 mm (2 Bh)
Strainer 10K Dia. 65 mm (2 Bh)
Strainer 10K Dia. 50 mm (2 Bh)
Header Dia. 100 Panjang 2.4 m (1 unit)
Presure Swicth (1 Bh)
- Pipa Instalasi Sistem (1 ls)
-Material bantu
5 Submersble Portable Pump set
- Kap. 120 lt/men
- Head 12 m
- Daya listrik 220-3ø-50Hz
6 Boster Pump set
- Centrifugal pump (2 Unit)
Kap. 220 ltr/m
Head 15 m
Daya listrik 220-3ø-50Hz
Panel Kontrol
-Aksesories dan Fitting
Chek Valve 10K Dia. 65 mm (3 Bh)
Gate Valve 10K Dia. 65 mm (2 Bh)
Strainer 10K Dia. 65 mm (2 Bh)
Flexible Joint 10K Dia. 65 mm (4 Bh)
Header Dia. 100 Panjang 2.4 m (1 unit)
Presure Swicth (2 Bh)
Presure Gauge (1 Bh)
Presure Tank
- Pipa Instalasi Sistem (1 ls)
-Material bantu
7 Roof Tank PRF Kap. 5 m3 set
-Aksesories dan Fitting
Gate Valve 10K Dia. 65 mm (7 Bh)
Strainer 10K Dia. 65 mm (2 Bh)
Header Dia. 200 Panjang 2.4 m (1 unit)
- Pipa Instalasi Sistem (1 ls)
- Material bantu
8 Pemipaan
Horisontal
- Pipa PN 10 Dia. 40 mm m
- Pipa PN 10 Dia. 50 mm m
- Material Bantu Dan Fitting 35 % SNI ls
Riser
- Pipa PN 10 Dia. 50 mm m
- Pipa PN 10 Dia. 40 mm m
- Gate Valve 10K Dia. 40 mm bh
- Floating Valve 10K Dia. 40 mm bh
- Automatic air vent (AAV) bh
- Material Bantu Dan Fitting 35 % SNI ls
JUMLAH 3.1.SENTRAL AIR BERSIH
B. LANTAI 2
1 Gate Valve :
- Gate Valve 10K Dia. 32 mm Buah
2 Pemipaan Polypropelyne PN.10 :
- Pipa PN 10 Dia. 40 mm (Shaff) Meter
- Pipa PN 10 Dia. 32 mm Meter
- Pipa PN 10 Dia. 15 mm (Riser) Meter
3 Material Bantu Dan Fitting 35 % SNI Ls
C. LANTAI 3
1 Gate Valve :
- Gate Valve 10K Dia. 32 mm Buah
2 Pemipaan Polypropelyne PN.10 :
- Pipa PN 10 Dia. 40 mm (Shaff) Meter
- Pipa PN 10 Dia. 32 mm Meter
- Pipa PN 10 Dia. 15 mm (Riser) Meter
3 Material Bantu Dan Fitting 35 % SNI Ls
D. LANTAI 4
1 Gate Valve :
- Gate Valve 10K Dia. 32 mm Buah
2 Pemipaan Polypropelyne PN.10 :
- Pipa PN 10 Dia. 40 mm (Shaff) Meter
- Pipa PN 10 Dia. 32 mm Meter
- Pipa PN 10 Dia. 15 mm (Riser) Meter
3 Material Bantu Dan Fitting 35 % SNI Ls
JUMLAH 3.2.PEKERJAAN INSTALASI AIR BERSIH
3.3. PEKERJAAN AIR KOTOR
A. LANTAI 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- Diameter 100 mm Meter
- CO diameter 100 mm Buah
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- Diameter 80 mm Meter
- CO diameter 80 mm Buah
3 Pemipaan vent PVC Kelas 10 kg/cm2 :
- Diameter 50 mm (shaff) Meter
- Diameter 32 mm Meter
- Diameter 25 mm Meter
4 Material Bantu Dan Fitting 35 % SNI Ls
B. LANTAI 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- Diameter 100 mm Meter
- CO diameter 100 mm Buah
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- Diameter 80 mm Meter
- CO diameter 80 mm Buah
3 Pemipaan vent PVC Kelas 10 kg/cm2 :
- Diameter 50 mm (shaff) Meter
- Diameter 32 mm Meter
- Diameter 25 mm Meter
4 Material Bantu Dan Fitting 35 % SNI Ls
C. LANTAI 3
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- Diameter 100 mm Meter
- CO diameter 100 mm Buah
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- Diameter 80 mm Meter
- CO diameter 80 mm Buah
3 Pemipaan vent PVC Kelas 10 kg/cm2 :
- Diameter 50 mm (shaff) Meter
- Diameter 32 mm Meter
- Diameter 25 mm Meter
4 Material Bantu Dan Fitting 35 % SNI Ls
D. LANTAI 4
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- Diameter 100 mm Meter
- CO diameter 100 mm Buah
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- Diameter 80 mm Meter
- CO diameter 80 mm Buah
3 Pemipaan vent PVC Kelas 10 kg/cm2 :
- Diameter 50 mm (shaff) Meter
- Diameter 32 mm Meter
- Diameter 25 mm Meter
4 Material Bantu Dan Fitting 35 % SNI Ls
D. PERALATAN UTAMA
1 Bio Septik Kap. 8 m3 unit
-Pemipaan Sistem
-Aksesories
-Valve
JUMLAH 3.3.PEKERJAAN AIR KOTOR
IV. MEKANIKAL
4.1. PEKERJAAN INSTALASI HYDRANT
A. LANTAI 1
Dalam Gedung
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm Set
- Control Valve, diameter 65 mm : Buah
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) Buah
- Pemipaan Hydrant BSP Schedule 40 :
Diameter 65 mm Meter
Instalasi
- Pilar Hydrant Set
- Hors Cabinet Set
- Pemipaan ke Phillar Hydrant BSP Schedule 40 :
- Pipa dia 100 mm Meter
- Gate Valve dia 100 mm bh
- Pemipaan ke Siamesse BSP Schedule 40 :
- Diameter 100 mm Meter
-Siamesse Connection Unit
- Check valve diameter 100 mm Buah
- Peralatan Bantu ( Fitting ) Ls
B. LANTAI 2
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm Set
- Control Valve, diameter 65 mm : Buah
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) Buah
- Pemipaan Hydrant BSP Schedule 40 :
Diameter 65 mm Meter
C. LANTAI 3
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm Set
- Control Valve, diameter 65 mm : Buah
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) Buah
- Pemipaan Hydrant BSP Schedule 40 :
Diameter 65 mm Meter
D. LANTAI 4
- Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm Set
- Control Valve, diameter 65 mm : Buah
- Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose ) Buah
- Pemipaan Hydrant BSP Schedule 40 :
Diameter 65 mm Meter
C. RISER
1 Pemipaan BSP Schedule 40 :
Diameter 100 mm Meter
Diameter 80 mm Meter
2 Gate Valve diameter 50 mm Buah
3 Automatic Air valve ( AAV ) Buah
JUMLAH 4.1.PEKERJAAN INSTALASI HYDRANT
B. LANTAI 2
1 Pekerjaan Unit AC Multy Splite Cassete, termasuk dudukan unit
a. Kap. 36000 Btuh unit
OU-2.1+2.2 Kap. 36000 btuh
IU-2.1. 18000 Btuh
IU-2.2. 18000 Btuh
OU-2.3+2.4 Kap. 36000 btuh
IU-.2.3. 18000 Btuh
IU-2.4. 18000 Btuh
OU-2.5+2.6 Kap. 36000 btuh
IU-.2.5. 18000 Btuh
IU-2.6. 18000 Btuh
2 Pipa Refregerant m
3 Pipa drain Ac m
4 Kabel NYM 3 x 2.5 mm2+Pipa Conduit m
C. LANTAI 3
1 Pekerjaan Unit AC Single Splite Wall, termasuk dudukan unit
- Unit IU.3.1+OU.3.1, type Wall kap : 18.000 BTU/h bh
- Unit IU.3.2+OU.3.2, type Wall kap : 18.000 BTU/h bh
- Unit IU.3.3+OU.3.3, type Wall kap : 18.000 BTU/h bh
- Unit IU.3.4+OU.3.4, type Wall kap : 18.000 BTU/h bh
- Unit IU.3.5+OU.3.5, type Wall kap : 18.000 BTU/h bh
- Unit IU.3.6+OU.3.6, type Wall kap : 18.000 BTU/h bh
2 Pipa Refregerant m
3 Pipa drain Ac m
4 Kabel NYM 3 x 2.5 mm2+Pipa Conduit m
D. LANTAI 4
1 Pekerjaan Unit AC Multy Splite, termasuk dudukan unit
a. Kap. 36000 Btuh unit
OU-4.1+4.2 Kap. 36000 btuh
IU-4.1. 18000 Btuh
IU-4.2. 18000 Btuh
OU-4.3+4.4 Kap. 36000 btuh
IU-.4.3. 18000 Btuh
IU-4.4. 18000 Btuh
OU-4.5+4.6 Kap. 36000 btuh
IU-.4.5. 18000 Btuh
IU-4.6 18000 Btuh
2 Pipa Refregerant m
3 Pipa drain Ac m
4 Instalasi daya Listrik m
INSTALASI VENTILASI
A. LANTAI 1
1 Exhaust Fan
- EF.1.C1 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.1.1 Kapasitas. 400.Cfm/ Wall Type bh
- EF.1.2 Kapasitas. 300.Cfm/ Wall Type bh
- Instalasi daya Listrik ttk
B. LANTAI 2
1 Exhaust Fan
- EF.2.C1 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.2.C2 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.2.1 Kapasitas. 300.Cfm/ Wall Type bh
- Instalasi daya Listrik ttk
C. LANTAI 3
1 Exhaust Fan
- EF.3.C1 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.3.C2 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.3.1 Kapasitas. 300.Cfm/ Wall Type bh
- Instalasi daya Listrik ttk
D. LANTAI 4
1 Exhaust Fan
- EF.4.C1 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.4.C2 Kapasitas. 150.Cfm/ Ceilling Type bh
- EF.4.1 Kapasitas. 300.Cfm/ Wall Type bh
- EF.4.2 Kapasitas. 300.Cfm/ Wall Type bh
- Instalasi daya Listrik ttk
JUMLAH 4.2.PEKERJAAN TATA UDARA DAN VENTILASI
AN BIAYA SUB PEKERJAAN MEKANIKAL DAN PLUMBING
VOLUME
HARGA JUMLAH
SATUAN HARGA
d. e f.=dxe
H SAT RAB JUM RAB
10%
a. b. c.
B. LANTAI 2
- Teras
1 Down Light PL 13W (E27) set
2 Instalasi Titik Penerangan bh
- Selasar Dan Hall
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Down Light PL 13W (E27) set
4 Down Light PL 13W (E27)+Batery Emergency set
5 Saklar Single bh
6 Saklar Double bh
7 Instalasi Titik Penerangan titik
- Tangga
1 Lampu TL 1 x 36 Watt +Batery Emergency set
2 Saklar Tukar/Hotel bh
3 Instalasi Titik Penerangan titik
- Ruangan Panel
1 Lampu TL 1 x 18 Watt (IP20) Dipasang Rata Plafond set
2 Saklar Single bh
3 Instalasi Titik Penerangan titik
- Ruangan Sub Bag PIK dan Kasub Bag
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Ruangan Sub Bag PIK dan Kasub Bag
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Ruangan Sub Bag Keu,IKN dan Kasub Bag
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Toilet
1 Down Light PL 11W (E27) Pakai Couver Glass set
2 Saklar Single bh
3 Instalasi Titik Penerangan titik
C. LANTAI 3
- Ruangan Staf
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Ruangan Kabid Mapenda
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Single bh
4 Instalasi Titik Penerangan titik
- Tangga
1 Lampu TL 1 x 36 Watt +Batery Emergency set
2 Saklar Putar/Hotel bh
3 Instalasi Titik Penerangan titik
- Ruangan Panel
1 Lampu TL 1 x 18 Watt (IP20) Dipasang Rata Plafond set
2 Saklar Single bh
3 Instalasi Titik Penerangan titik
- Toilet
1 Down Light PL 11W (E27) Pakai Couver Glass set
2 Down Light PL 13W (E27) set
3 Saklar Single bh
4 Saklar Double bh
5 Instalasi Titik Penerangan titik
D. LANTAI 4
- Aula
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Spot Lamp Par/38 80 Watt set
4 Spot Lamp Par/38 80 Watt+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Hall dan Selasar
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency set
3 Saklar Double bh
4 Instalasi Titik Penerangan titik
- Tangga
1 Lampu TL 1 x 36 Watt +Batery Emergency set
2 Saklar Putar/Hotel bh
3 Instalasi Titik Penerangan titik
- Toilet
1 Down Light PL 11W (E27) Pakai Couver Glass set
2 Down Light PL 13W (E27) set
3 Saklar Single bh
4 Saklar Double bh
5 Instalasi Titik Penerangan titik
- Rungan Pantry Dan Persiapan
1 Lampu TL 2 x 36 Watt Pakai M6 (Louvre) set
2 Saklar Double bh
3 Instalasi Titik Penerangan titik
- Ruangan Panel
1 Lampu TL 1 x 18 Watt (IP20) Dipasang Rata Plafond set
2 Saklar Single bh
3 Instalasi Titik Penerangan titik
JUMLAH 1.1.INSTALASI PENERANGAN
B. LANTAI 2
- Selasar Dan Hall
1 Stop Kontak (500w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Panel
1 Stop Kontak (200w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Sub Bag PIK dan Kasub Bag
1 Stop Kontak (200w,1Ø,16A) bh
2 Stop Kontak Lantai (2x200w,1Ø,16A) bh
3 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Sub Bag Keu,IKN dan Kasub Bag
1 Stop Kontak (200w,1Ø,16A) bh
2 Stop Kontak Lantai (2x200w,1Ø,16A) bh
3 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
C. LANTAI 3
- Koridor Dan Hal
1 Stop Kontak (500w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Panel
1 Stop Kontak (200w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Staff
1 Stop Kontak (200w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Kabid Mapenda
1 Stop Kontak (200w,1Ø,16A) bh
2 Stop Kontak (500w,1Ø,16A) bh
3 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
D. LANTAI 4
- Koridor Dan Hal
1 Stop Kontak (500w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Panel
1 Stop Kontak (200w,1Ø,16A) bh
- Aula
1 Stop Kontak (500w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
- Ruangan Pantry dan Persiapan
1 Stop Kontak (200w,1Ø,16A) bh
2 Stop Kontak (500w,1Ø,16A) bh
3 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
E. SITE
1 Stop Kontak (200w,1Ø,16A) bh
2 Instalasi Titik Daya Stop Kontak 1 Phasa Didalam Conduit titik
JUMLAH 1.2.INSTALASI
SATUAN HARGA
d.
RAB JUM RAB
10%
628,004,025
HARGA SATUAN PEKERJAAN TERPASANG
HARGA SATUAN
12,650,000
22,550,000
28,050,000
5,335,000
192,500
467,500
495,000
19,250
27,500
35,750
38,500
49,500
231,000
451,000
23,650
48,400
48,325
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,ELEKTRIKAL
No. URAIAN
A. TENAGA KERJA
1 Mandor
2 Tukang pipa
3 Kepala tukang pipa
4 Tukang listrik
5 Kepala tukang listrik
6 Tukang AC
7 Kepala tukang AC
8 Upah Pemasangan dan Wiring Sistem Panel SDP
9 Upah Pemasangan AC
C. BAHAN
1 GATE VALVE DIA.40 MM / 20 K
2 GATE VALVE DIA.50 MM / 20 K
3 GATE VALVE DIA.65 MM / 20 K
4 GATE VALVE DIA.80 MM / 20 K
5 GATE VALVE DIA.100 MM / 20 K
6 AAV
7 HEAD SPRINKLER
8 PIPA BSP SCH.40 Dia. 3/4”
9 PIPA BSP SCH.40 Dia. 1”
10 PIPA BSP SCH.40 Dia. 1 1/2”
11 PIPA BSP SCH.40 Dia. 1 1/4”
12 PIPA BSP SCH.40 Dia. 2”
13 PIPA BSP SCH. 40 Dia. 2 1/2”
14 PIPA BSP SCH. 40 Dia. 3”
15 PIPA BSP SCH.40 Dia. 4”
16 PIPA BSP SCH.40 Dia. 5”
17 PIPA BSP SCH. Dia. 6”
18 PIPA BSP SCH.40 Dia. 8”
19 PIPA HEADER BSP SCH.40 DIA. 300 MM
20 DAYA LISTRIK POMPA FIRE
21 Fire House Cabinet Lengkap+Aksesories
22 Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
23 Siamesse Connection
24 Check valve diameter 100 mm
25 Pilar Hydrant
26 GATE VALVE DIA.32 MM / 10 Kg
27 GATE VALVE DIA.40 MM / 10 Kg
28 GATE VALVE DIA.50 MM / 10 Kg
29 GATE VALVE DIA.65 MM / 10 Kg
30 Floating valve dia. 50 mm
31 Clean Out
32 PIPA PVC Dia. 1 1/4”
33 PIPA PVC Dia. 1/2”
34 PIPA PVC Dia. 1”
35 PIPA PVC Dia. 10”
36 PIPA PVC Dia. 2 1/2”
37 PIPA PVC Dia. 2”
38 PIPA PVC dia. 3/4”
39 PIPA PVC Dia. 3”
40 PIPA PVC Dia. 4”
41 PIPA PVC Dia. 5”
42 PIPA PVC Dia. 6”
43 PIPA PVC Dia. 8”
44 PPR PN-10 Ø 15 mm
45 PPR PN-10 Ø 20 mm
46 PPR PN-10 Ø 25 mm
47 PPR PN-10 Ø 32 mm
48 PPR PN-10 Ø 40 mm
49 PPR PN-10 Ø 50 mm
50 PPR PN-10 Ø 63 mm
51 PPR PN-10 Ø 75 mm
52 PPR PN-10 Ø 90 mm
53 PPR PN-10 Ø 110 mm
54 PPR PN-10 Ø 125 mm
55 ROOF DRAIN DIA. 100 MM
56 Kabel NYM 2x2,5 mm2
57 Kabel NYM 3x2,5 mm2
58 Kabel NYY 4x16 mm2
59 Kabel NYY 4x35 mm2
60 Kabel NYY 4x6 mm2
61 Kabel NYY 4x95 mm2
62 Kabel Tray lebar 20 cm (200 -100)
63 Kabel Tray lebar 30 cm (300 -100)
64 Saklar ganda 10 A
65 Saklar group 6 modul
66 Saklar hotel 10 A
67 Saklar tunggal 10 A
68 Stop kontak daya 10/16 A
69 Stop kontak daya 10/16 A - 3 Phase
70 Socket Pipa
71 Tee Doos
72 Pipa Conduit
73 Las Doop
74 Klem Pipa
75 Isolasi ban
76 Fhiser
77 Air Terminal - Radiuas 25 m
Obstraction Lamp
Coaxial Cable 2 x 35 mm
Connecting Sleeve lengkap surge arester
Lightening Flash counter
Grounding sistem
- Copper road
- Pentanahan & pipa GIP dia. 1 1/2 "
- Bak kontrol ( 40x40) cm lengkap tutup
- Kawat BCC dia. 70 mm
Testing/pengukuran pentanahan
Tiang / Menara - dududkan EF
78 Kabel NYMHY 2x1,5 mm2
79 Kabel NYMHY 3x1,5 mm2
80 Couvler
81 Out Let TV
Sentral MATV
-Antena UHF 17 Element lengkap tiang/ dudukan
-Antena VHF 22 Element lengkap tiang / dudukan
-Satelite Receiver & Modulator
-Activ Combiner
-Booster sinyal & P.supply
-Spliter 4 way
-Selective Programmable 8 channel for local program
-Headend Amplifier ( Booster )
-TV Monitor
-CD Player
-Cabinet Rack 19 “ ( 1,8 M)
82 Kabel Coaxial RG11( 0,6 mm2 )
83 Kabel Coaxial RG8 ( 0,6 mm2 )
84 Kabel Coaxial 5C-2V
85 Tiang / Dudukan
86 Video Control Matrix 16 Chanel
PC Computer + Printer
87 Fixed Dome Camera
88 Instalasi CCTV
89 CSU / DSU
90 Routher
91 Sentral CCTV
-Printer
-12ch Video Web Server Complug
-Alarm
-Hub
-Rounter
-Monitor & Recording
-CSU/DSU
92 MDF/ CTB
93 Terminal Box Fire
94 Alarm Bell
95 ROR
96 Fixed Heat Detector
97 Manual Breack glass
98 Indicator Lamp
99 Smoke Detector
100 Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
101 Kabel ITC 10x2x2x0,6 mm2
102 Kabel ITC 20x2x2x0,6 mm2
103 Kabel ITC 30x2x2x0,6 mm2
104 Kabel ITC 40x2x2x0,6 mm2
105 Kabel ITC 50x2x2x0,6 mm2
106 TBT (Kap. 30 Pairs)
107 Out Let Telepon Lokal
108 Out Let Telepon Lantai
109 THB (Patch Panel 1 x 12 Ports/swicth 1 x 12 port)
110 Out Let Data
111 Down Light PL 11W (E27) Pakai Couver Glass
112 Down Light PL 13W (E27)
113 Down Light PL 13W (E27)+Batery Emergency
114 Lampu Taman Mercury 80 Watt
115 Lampu TL 1 x 18 Watt (IP20) Dipasang Rata Plafond
116 Lampu TL 1 x 36 Watt (IP20) Dipasang Rata Plafond
117 Lampu TL 1 x 36 Watt +Batery Emergency
118 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)
119 Lampu TL 2 x 36 Watt Pakai M6 (Louvre)+Batery Emergency
120 Spot Lamp Par/38 80 Watt
121 Spot Lamp Par/38 80 Watt+Batery Emergency
122 Stop Kontak Lantai
123 Box Panel SDP
124 Box Panel PP/LP
125 Box Panel PP.AC
MCB 3Ø 10KA
126 MCB 3Ø 6A /10KA
127 MCB 3Ø 10A /10KA
128 MCB 3Ø 16A /10KA
129 MCB 3Ø 20A /10KA
130 MCB 3Ø 25A /10KA
MCCB 3Ø 10KA
131 MCCB 3Ø 32A /10KA
132 MCCB 3Ø 16A /10KA
MCCB 3Ø 22KA
133 MCCB 3Ø 125-160A /22KA
MCCB 3Ø 25KA
134 MCCB 3Ø 80-100A /25KA
135 MCCB 3Ø 63A /25KA
136 Amper Meter (Via CT)
137 Volt meter (Via CT)
138 Amper Meter
139 Volt meter
140 Volt meter selector swicth
141 Load Break Swicth
142 Fuse Pilot Lamp
143 Piltot Lamp
144 Grounding Sistem Panel
145 TBS
146 Ceilling Speaker 3W
147 Ceiling Speaker 3W Khusus Paging)
148 Box Speaker 15W
149 Volume Control
150 Kabel NYMHY 3 x 2.5 mm2
151 Sentral Utama Sound Sytem
-MDF
-Mic public addres
-Mic car colling
-Tuner
-Tape deck
-cd/dvd/mp3
-ups
-mixer
-equalizer
-power 4(300w)
152 Deep Well
Kap. Pump 150 lt/m Head 80 m 220V-3ø-50 HZ
(Panel Kontrol,Aksesories Pompa)
153 P.D.A.M
(Meter air dan Gate Valve)
154 Sistem Penyaringan Air
-Sand filter ( 1 Unit)
-Carbon filter (1 Unit)
-Aksesories dan Fitting
Gate Valve 5K Dia. 50 mm (3 Bh)
Gate Valve 5K Dia. 25 mm (2 Bh)
-Pipa Instalasi Sistem (1 ls)
155 Transfer Pump
-Centrifugal pump (2 Unit)
Kap. 220 ltr/m
Head 35 m
Daya listrik 220-3ø-50Hz
Panel Kontrol
-Aksesories dan Fitting
Chek Valve 5K Dia. 50 mm (2 Bh)
Chek Valve 5K Dia. 65 mm (2 Bh)
Gate Valve 5K Dia. 50 mm (2 Bh)
Gate Valve 5K Dia. 65 mm (2 Bh)
Flexible Joint 5K Dia. 50 mm (2 Bh)
Flexible Joint 5K Dia. 65 mm (2 Bh)
Strainer 5K Dia. 65 mm (2 Bh)
Strainer 5K Dia. 50 mm (2 Bh)
Header Dia. 100 Panjang 2.4 m (1 unit)
Presure Swicth (1 Bh)
Pipa Instalasi Sistem (1 ls)
-Material bantu
156 Submersble Portable Pump
Kap. 120 lt/men
Head 12 m
Daya listrik 220-3ø-50Hz
157 Boster Pump
Centrifugal pump (2 Unit)
Kap. 220 ltr/m
Head 15 m
Daya listrik 220-3ø-50Hz
Panel Kontrol
-Aksesories dan Fitting
Chek Valve 5K Dia. 65 mm (3 Bh)
Gate Valve 5K Dia. 65 mm (2 Bh)
Strainer 5K Dia. 65 mm (2 Bh)
Flexible Joint 5K Dia. 65 mm (4 Bh)
Header Dia. 100 Panjang 2.4 m (1 unit)
Presure Swicth (2 Bh)
Presure Gauge (1 Bh)
Presure Tank
Pipa Instalasi Sistem (1 ls)
-Material bantu
158 Roof Tank PRF Kap. 5 m3
-Aksesories dan Fitting
Gate Valve 5K Dia. 65 mm (7 Bh)
Strainer 5K Dia. 65 mm (2 Bh)
Header Dia. 200 Panjang 2.4 m (1 unit)
Pipa Instalasi Sistem (1 ls)
Material bantu
159 Bio Septik Kap. 8 m3
-Pemipaan Sistem
-Aksesories
-Valve
160 Air conditioning Type Cessete kap : 18.000 BTU/h
161 Air conditioning Type Cessete kap : 32.000 BTU/h
162 Air conditioning OU-Kap. 36000 btuh IU-Kap.2 x 18000 Btuh
163 Air conditioning Type Wall kap : 18.000 BTU/h
164 Pipa Refregerant
165 Pipa Drain Ac+Insolasi
166 Exhaust Fan Kapasitas. 150.Cfm/ Ceilling Type
167 Exhaust Fan Kapasitas. 300.Cfm/ Wall Type
168 Exhaust Fan Kapasitas. 400.Cfm/ Wall Type
IKAL,ELEKTRIKAL
Rp - Per Hari
Rp - Per Hari
Rp - Per Hari
Rp - Per Hari
Rp - Per Hari
Rp - Per Hari
Rp - Per Hari
Rp - Per unit
Rp - Per unit
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per Bh
Rp - Per Titik
Rp - Per unit
Rp - Per bh
Rp - Per bh
Rp - Per bh
Rp - Per bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Set
Rp - Per Bh
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerBh
Rp - PerUnit
Rp - Per m¹
Rp - Per m¹
Rp - Per Bh
Rp - Per Bh
Rp - Per Unit
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per Unit
Rp - Per Unit
Rp - Per Unit
Rp - Per
Rp - Per
Rp - Per Unit
Rp - Per Unit
Rp - Per Unit
Rp - Per Unit
Rp - Per Unit
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per m¹
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - Per Bh
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per set
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp -
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp -
Rp - per bh
Rp -
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per bh
Rp - per unit
Rp - pe bh
Rp - pe bh
Rp - pe bh
Rp - pe bh
Rp - pe bh
Rp - per m
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per unit
Rp - per m
Rp - per m
Rp - per unit
Rp - per unit
Rp - per unit
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
Box Panel PP/LP MCB 3Ø 20A /10KA MCB 3Ø 10A /10KA MCB 3Ø 16A / Bh Bh Bh Bh
1,00
Bh Bh unit- ls
10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 9,00
77 1 Unit Panel PP/LP-2
Box Panel PP/LP MCB 3Ø 20A /10KA MCB 3Ø 10A /10KA MCB 3Ø 16A / Bh Bh Bh Bh
1,00
Bh Bh unit- ls
10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 3,00
78 1 Unit Panel PP/LP-3
Box Panel PP/LP MCB 3Ø 20A /10KA MCB 3Ø 10A /10KA MCB 3Ø 16A / Bh Bh Bh Bh
1,00
Bh Bh unit- ls
10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 4,00
79 1 Unit Panel PP/LP-4
Box Panel PP/LP MCB 3Ø 20A /10KA MCB 3Ø 10A /10KA Fuse Pilot Bh Bh Bh Bh
1,00
Bh unit ls -
Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 9,00
80 1 Unit Panel PP-AC.1
Box Panel PP.AC MCCB 3Ø 16A /10KA MCB 3Ø 10A /10KA MCB 3Ø 16A Bh Bh Bh Bh
1,00
Bh Bh Bh -Bh Bh unit ls
/10KA Amper Meter unit 1,00 -
Jumlah
Volt meter 1,00
81 1 Unit Panel PP-AC.2
Box Panel PP.AC MCCB 3Ø 32A /10KA MCB 3Ø 16A /10KA Amper Meter Bh Bh Bh Bh
1,00
Bh Bh Bh -Bh unit ls
Volt meter unit 1,00 -
Jumlah
Volt meter selector swicth 5,00
82 1 Unit Panel PP-AC.3
Box Panel PP.AC MCCB 3Ø 32A /10KA MCB 3Ø 10A /10KA Amper Meter Bh Bh Bh Bh
1,00
Bh Bh Bh -Bh unit ls
Volt meter unit 1,00 -
Jumlah
Volt meter selector swicth 8,00
83 1 Unit Panel PP-AC.4
Box Panel PP.AC MCCB 3Ø 32A /10KA MCB 3Ø 16A /10KA Amper Meter Bh Bh Bh Bh
1,00
Bh Bh Bh -Bh unit ls
Volt meter unit 1,00 -
Jumlah
Volt meter selector swicth 6,00
84 1 Unit Panel PP-LF
Box Panel PP Bh Bh Bh Bh
1,00
Bh unit ls -
MCCB 3Ø 32A /10KA MCB 3Ø 25A /10KA Fuse Pilot Lamp unit 1,00 -
Jumlah
Piltot Lamp 3,00
85 1 Unit Panel PP-BP
Box Panel PP Bh Bh Bh Bh
1,00
Bh unit ls -
MCB 3Ø 16A /10KA MCB 3Ø 10A /10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 2,00
86 1 Unit Panel PP-IPAL
Box Panel PP Bh Bh Bh Bh
1,00
Bh unit ls -
MCB 3Ø 16A /10KA MCB 3Ø 10A /10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 3,00
87 1 Unit Panel PP-AB
Box Panel PP Bh Bh Bh Bh
1,00
Bh unit ls -
MCB 3Ø 16A /10KA MCB 3Ø 6A /10KA Fuse Pilot Lamp Piltot Lamp unit 1,00 -
Jumlah
Grounding Sistem Panel 1,00
88 1 TTK TITIK INSTALASI PENERANGAN
100 1 bh MDF
ROR Mandor Bh Hr Hr Hr
1,00 -
Kepala Tukang listrik 0,03 -
Tukang 0,06 -
0,06 - Jumlah
Smoke Detector Bh Hr Hr Hr
1,00 -
Mandor 0,03 -
Kepala Tukang listrik 0,06 -
Tukang 0,06 - Jumlah
JUMLAH TOTAL
0
0
0
0
-
0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN UPAH DAN BAHAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APRATUR NEGARA BPS PROVINSI NTB
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BPS
LOKASI : PRAYA KABUPATEN LOMBOK TENGAH
TAHUN ANGGARAN : 2013
1 Pekerja Rp 45,070.00
2 Pekerja Terlatih (Pekerja Khusus) Rp 43,500.00
3 Tukang Batu Rp 62,150.00
4 Tukang Kayu Rp 64,630.00
5 Tukang Las Rp 68,360.00
6 Tukang Besi Rp 62,150.00
7 Tukang Cat Rp 62,150.00
8 Tukang Gali Rp 58,000.00
9 Tukang Listrik Rp 67,100.00
10 Kepala Tukang Batu Rp 68,360.00
11 Kepala Tukang Kayu Rp 70,950.00
12 Kepala Tukang Las Rp 70,950.00
13 Kepala Tukang Besi Rp 68,360.00
14 Kepala Tukang Cat Rp 62,150.00
15 Kepala Tukang Gali Rp 63,000.00
16 Kepala Tukang Listrik Rp 72,090.00
17 Mandor Rp 74,600.00
18 Operator Rp 82,000.00
SAT.
4
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
A. HARGA SATUAN UPAH
NO. URAIAN JENIS BAHAN HARGA
1 2 3
A. BAHAN PASANGAN
1 Pasir Beton Rp 125,000.00
2 Pasir Pasang Rp 114,650.00
3 Pasir pasang (/kg) Rp 71.66
4 Pasir Pasang Batu Kali Rp 114,650.00
5 Pasir Urug Rp 101,770.00
6 Batu Belah Rp 187,515.00
7 Batu Kali Rp 147,200.00
8 Batu Gunung Rp 108,000.00
9 Batu Split 2x3 Rp 254,000.00
10 Batu Split 1x2 Rp 240,000.00
11 Batu Split 3x5 Rp 235,000.00
12 Batu Split 5x7 Rp 187,515.00
13 Kerikil maksimum 3 mm (/kg) Rp 171.43
14 Batu Krop Rp 110,000.00
15 Bata Merah Kelas 1 Rp 580.00
16 Bata Merah Kelas 2 Rp 500.00
17 Roster Beton Cetak 20x20cm Rp 15,000.00
18 Glass Block Lokal 20x20cm Rp 25,000.00
19 Sirtu Rp 119,500.00
20 Tanah Urug Rp 82,000.00
21 Tanah Urug Pilihan Rp 110,400.00
22 Portland Cement Rp 64,200.00
23 Portland Cement (Kg) Rp 1,284.00
24 Semen Warna Rp 13,900.00
25 Air Rp 300.00
C. BAHAN BESI
1 Besi Beton Polos Rp 15,100.00
2 Besi Beton Ulir Rp 19,260.00
3 Kawat Ikat Beton Rp 19,500.00
4 Paku Rp 19,500.00
5 Skruf Rp 35,000.00
6 Skrup fixer Rp 3,000.00
7 Paku Hak Panjang Rp 22,000.00
8 Paku Panjang 4-6 Cm Rp 19,500.00
9 Paku Panjang 7-12 Cm Rp 19,500.00
10 Paku Asbes Rp 25,100.00
11 Skruf Gyp Rp 25,100.00
12 Baja HB & IWF Rp 15,100.00
13 Baja Siku Rp 15,100.00
14 Baja Jenis CNP Rp 15,100.00
15 Baja Jenis UNP Rp 15,100.00
16 Baja Jenis Lips Canal Rp 15,100.00
17 Baja Jenis Plat Rp 15,100.00
18 Kawat Las Rp 25,000.00
19 Angker dia. 16 Rp 24,000.00
20 Angker dia. 12 Rp 19,200.00
21 Angker dia. 32 Rp 48,000.00
22 Angker dia. 19 Rp 36,000.00
23 Baut dia. 22 Rp 8,000.00
24 Baut dia. 19 Rp 7,500.00
25 Baut dia. 10 Rp 5,500.00
26 Baut dia. 32 Rp 12,000.00
27 Baut dia. 12 Rp 6,500.00
28 Baut dia. 16 Rp 7,000.00
29 Angker dia. 22 A327 Rp 44,000.00
30 Angker dia. 20 Rp 40,000.00
D. BAHAN KAYU
1 Kayu jati Kelas I Jati Open Rp 9,000,000.00
2 Kayu Gergajian Kelas I Rp 9,000,000.00
3 Kayu Gergajian Kelas II Rp 5,000,000.00
4 Balok kayu klas II Rp 5,000,000.00
5 Papan Kayu Klas II Rp 5,000,000.00
6 Kayu Gergajian Kelas III Rp 4,000,000.00
7 Balok Kayu Klas III Rp 4,000,000.00
8 Papan Kayu Klas III Rp 4,000,000.00
9 Kayu Gergajian Kelas IV Rp 2,200,000.00
10 Dolken dia. 8cm/Usuk 5/7 panjang 4-5cm Rp 100,000.00
11 Multiplek 18 mm Rp 264,200.00
12 Multiplek 12 mm Rp 187,800.00
13 Multiplek 9 mm Rp 135,600.00
14 Multiplek 6 mm Rp 102,000.00
15 Multiplek 3 Rp 57,000.00
16 mm
Multiplek 2 Rp 53,500.00
17 mm
Teakwood Ukuran Normal Rp 118,700.00
18 Formika uk. Besar 120 x 240 Warna Putih Rp 171,000.00
19 Formika uk. Besar 120 x 240 Warna Rp 192,000.00
20 Lambersering Kayu Jati Oven Jatim Rp 2,000,000.00
21 Bambu (dia.7 cm, P- 6 m) Rp 8,000.00
E. BAHAN LANGIT-LANGIT
1 Asbes Plat/Eternit 100 x 100 cm Rp 23,000.00
2 Silicate uk. 120 x 240, t = 6 ex. Calsiboard Gresik Rp 114,500.00
3 Calsiboard 120x240x6 mm Rp 115,000.00
4 Silicate uk. 120 x 240, t = 6 ex. GRC Rp 145,000.00
5 Silicate uk. 120 x 240, t = 8 ex. GRC Rp 186,000.00
6 Gypsum uk. 120 x 240, t = 9 ex. Jayaboard Rp 102,000.00
7 List Plafond Gypsum t = 8-10 cm Rp 27,500.00
8 List Plafond Gypsum t = 5-7 cm Rp 15,000.00
9 Tepung Gypsum 20 kg. Rp 80,000.00
10 Tepung Gypsum Rp 4,500.00
NO. URAIAN JENIS BAHAN HARGA
1 2 3
J. BAHAN CAT
1 Cat Tembok Interior Mutu Menengah Rp 31,000.00
2 Cat Tembok Exterior Mutu Tinggi Rp 87,700.00
3 Cat Dasar Mutu Tinggi Rp 55,000.00
4 Cat Kayu Mutu Menengah Rp 51,300.00
5 Cat Besi Mutu Menengah Rp 77,000.00
6 Cat Kayu Mutu Tinggi Rp 51,360.00
7 Cat Besi Mutu Tinggi Rp 77,000.00
8 Cat Alkali Rp 55,000.00
9 Minyak Cat Rp 10,080.00
10 Thiner (Minyak Cat A Spesial) Rp 45,000.00
11 Wood filer Mutu Tinggi Rp 25,000.00
12 Wood Stand Setara Impra Rp 45,000.00
13 Sanding Sealer Setara Impra Rp 45,000.00
14 Clear Melamin Setara Impra Rp 45,000.00
15 Meni Kayu Mutu Menengah Rp 24,000.00
16 Meni Kayu Mutu Tinggi Rp 45,000.00
17 Plitur Jadi (Teak Oil) Rp 34,200.00
18 Dempul Kayu Mutu Menengah Rp 24,610.00
19 Dempul Kayu Mutu Tinggi Rp 28,900.00
20 Kuas cat Rp 20,000.00
21 Roll Cat Rp 60,000.00
22 Amplas Tembok Rp 3,750.00
23 Amplas Kayu Rp 3,750.00
24 Plamir Tembok Mutu Menengah Rp 24,600.00
25 Minyak Begesting Rp 12,000.00
26 Water Proofing Rp 110,000.00
27 Floor Hardner Rp 110,000.00
28 Seal Bound Rp 178,910.00
29 Residu Rp 13,500.00
30 Termisida Rp 17,600.00
31 Finishing Lapisan HPL Rp 78,650.00
L. BAHAN PLUMBING
L.1 PIPA PVC
1 Pipa PVC ø 1/2" AW Rp 20,400.00
2 Pipa PVC ø 3/4" AW Rp 26,000.00
3 Pipa PVC ø 1" AW Rp 34,800.00
4 Pipa PVC ø 1 1/4" AW Rp 49,600.00
5 Pipa PVC ø 1 1/2" AW Rp 58,400.00
6 Pipa PVC ø 2" AW Rp 72,800.00
7 Pipa PVC ø 2 1/2" AW Rp 105,200.00
8 Pipa PVC ø 3" AW Rp 143,200.00
9 Pipa PVC ø 4" AW Rp 236,800.00
10 Pipa PVC ø 6" AW Rp 546,800.00
11 Pipa PVC ø 8" AW Rp 933,200.00
N. ALAT BANTU
1 Mesin gergaji Rp 2,000,000.00
2 Mata Gergaji Rp 80,000.00
3 Mesin bor Rp 1,500,000.00
4 Mata bor Rp 80,000.00
5 Mesin potong plat Rp 8,500,000.00
6 Mesin gerinda potong Rp 1,500,000.00
7 Mata gerinda potong Rp 60,000.00
8 Gerinda seleb Rp 450,000.00
9 Mata gerinda seleb Rp 125,000.00
10 Acytilyin Rp 130,000.00
11 Oksigen Rp 90,000.00
12 Listrik Rp 1,600.00
13 Alat bantu Rp 5,000.00
14 Kawat las listrik Rp 25,000.00
15 Masin Las Rp 20,000.00
16 Mesin serut Rp 8,500.00
17 Mesin profil Rp 8,500.00
18 Solar Rp 10,700.00
19 Olie Rp 30,000.00
20 Minyak pelumas Rp 30,000.00
21 Minyak begisting Rp 12,000.00
22 Sewa alat Rp 50,000.00
23 Sewa Kompresor, Blasting pot, Selang, Nozzle Rp 20,000.00
SAT.
4
m³
m³
kg
m³
m³
m³
m³
m³
m³
m³
m³
m³
kg
m³
buah
buah
buah
buah
m³
m³
m³
zak
kg
kg
liter
SAT.
4
ADI)
m³
m³
m³
m³
m³
m³
SAT.
4
kg
kg
kg
kg
gross
buah
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
SAT.
4
m³
m³
m³
m³
m³
m³
m³
m³
m³
batang
lembar
lembar
lembar
lembar
lembar
lembar
lembar
lembar
lembar
m²
buah
SAT.
4
lembar
lembar
lembar
lembar
lembar
lembar
m'
m'
zak
kg
SAT.
4
DINDING
m²
m²
m²
buah
m²
m²
m²
m²
buah
m²
buah
buah
buah
buah
buah
m²
m²
m²
m²
buah
buah
SAT.
4
m²
m²
m²
m²
m²
m²
m²
buah
m²
SAT.
4
m'
m'
m²
m²
m'
m'
m²
m'
m'
m'
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
SAT.
4
m²
m'
m²
lembar
batang
batang
batang
batang
batang
batang
SAT.
4
kg
kg
kg
kg
kg
kg
kg
kg
liter
liter
kg
kg
liter
kg
kg
kg
kg
kg
kg
buah
buah
buah
buah
kg
liter
m²
m²
liter
kg
m²
m²
SAT.
4
m'
tube
kg
kg
m²
SAT.
4
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
batang
SAT.
4
buah
ps.
set
set
buah
buah
ps.
SAT.
4
Unit
Buah
Jam
Buah
Unit
Unit
Buah
Buah
Buah
Botol
Botol
Kwh
Kg
Kg
Jam
Jam
Jam
Liter
Liter
Liter
Liter
Jam
Jam
ANALISA BIAYA SATUAN PEKERJAAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APRATUR NEGARA BPS PROVINSI NTB
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BPS
LOKASI : PRAYA KABUPATEN LOMBOK TENGAH
TAHUN ANGGARAN : 2013
SNI 7393 : 2008 ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMUNIUM
I. Bahan
Pasir pasang (/kg) kg 731.000 Rp 71.66
Kerikil maksimum 3 mm (/kg) kg 1,031.000 Rp 171.43
I. Bahan
Air liter 215.000 Rp 300.00
Jumlah I
Pekerja OH 1.650 Rp 45,070.00
Tukang batu OH 0.275 Rp 62,150.00
Kepala tukang batu OH 0.028 Rp 68,360.00
II. Tenaga kerja
Mandor OH 0.083 Rp 74,600.00
Jumlah II
Jumlah (I + II)
Over head 10 %
Jumlah harga per satuan pekerjaan
SNI 7395 : 2008 ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING
I. Bahan
Cat Dasar Mutu Tinggi kg 0.100 Rp 55,000.00
I. Bahan
Cat Tembok Interior Mutu Menengah kg 0.260 Rp 31,000.00
Jumlah I
Pekerja OH 0.020 Rp 45,070.00
Tukang cat OH 0.063 Rp 62,150.00
Kepala tukang cat OH 0.006 Rp 62,150.00
II. Tenaga kerja
Mandor OH 0.0025 Rp 74,600.00
Jumlah II
Jumlah (I + II)
Over head 10 %
Jumlah harga per satuan pekerjaan
Kukuh Sugiarto,ST.
Direktur
SARANA APRATUR NEGARA BPS PROVINSI NTB
R BPS
GAH
PEKERJAAN PERSIAPAN
Jumlah Harga
Rp 48,000.00
Rp 39.00
Rp 28,000.00
Rp 76,039.00
Rp 4,507.00
Rp 6,463.00
Rp 709.50
Rp 373.00
Rp 12,052.50
Rp 88,091.50
Rp 8,809.15
Rp 96,900.65
Jumlah Harga
Rp 68,400.00
Rp 95,000.00
Rp 1,170.00
Rp 164,570.00
Rp 18,028.00
Rp 12,926.00
Rp 1,419.00
Rp 1,492.00
Rp 33,865.00
Rp 198,435.00
Rp 19,843.50
Rp 218,278.50
PEKERJAAN TANAH
Jumlah Harga
Rp 33,802.50
Rp 1,865.00
Rp 35,667.50
Rp 35,667.50
Rp 3,566.75
Rp 39,234.25
Jumlah Harga
Rp 40,563.00
Rp 3,357.00
Rp 43,920.00
Rp 4,392.00
Rp 48,312.00
Jumlah Harga
Rp 47,323.50
Rp 4,998.20
Rp 52,321.70
Rp 52,321.70
Rp 5,232.17
Rp 57,553.87
Jumlah Harga
Rp 45,070.00
Rp 2,387.20
Rp 47,457.20
Rp 47,457.20
Rp 4,745.72
Rp 52,202.92
Jumlah Harga
Rp 22,535.00
Rp 3,730.00
Rp 26,265.00
Rp 26,265.00
Rp 2,626.50
Rp 28,891.50
Jumlah Harga
Rp 122,124.00
Rp 122,124.00
Rp 13,521.00
Rp 746.00
Rp 14,267.00
Rp 136,391.00
Rp 13,639.10
Rp 150,030.10
Jumlah Harga
Rp 98,400.00
Rp 98,400.00
Rp 13,521.00
Rp 746.00
Rp 14,267.00
Rp 112,667.00
Rp 11,266.70
Rp 123,933.70
PEKERJAAN PONDASI
belah, campuran 1 PC : 3 PP
Jumlah Harga
Rp 225,018.00
Rp 259,368.00
Rp 55,605.25
Rp 539,991.25
Rp 67,605.00
Rp 46,612.50
Rp 5,127.00
Rp 5,595.00
Rp 124,939.50
Rp 664,930.75
Rp 66,493.08
Rp 731,423.83
belah, campuran 1 PC : 5 PP
Jumlah Harga
Rp 225,018.00
Rp 174,624.00
Rp 62,369.60
Rp 462,011.60
Rp 67,605.00
Rp 46,612.50
Rp 5,127.00
Rp 5,595.00
Rp 124,939.50
Rp 586,951.10
Rp 58,695.11
Rp 645,646.21
aanstamping)
Jumlah Harga
Rp 225,018.00
Rp 49,528.80
Rp 274,546.80
Rp 35,379.95
Rp 24,238.50
Rp 2,666.04
Rp 2,909.40
Rp 65,193.89
Rp 339,740.69
Rp 33,974.07
Rp 373,714.76
PEKERJAAN PLESTERAN
: 5 PP, tebal 15 mm
Jumlah Harga
Rp 9,984.38
Rp 2,636.95
Rp 12,621.33
Rp 13,521.00
Rp 9,322.50
Rp 1,025.40
Rp 1,119.00
Rp 24,987.90
Rp 37,609.23
Rp 3,760.92
Rp 41,370.16
: 5 PP, tebal 15 mm
Jumlah Harga
Rp 6,656.26
Rp 2,980.90
Rp 9,637.16
Rp 13,521.00
Rp 9,322.50
Rp 1,025.40
Rp 1,119.00
Rp 24,987.90
Rp 34,625.06
Rp 3,462.51
Rp 38,087.56
: 3 PP, tebal 20 mm
Jumlah Harga
Rp 13,312.51
Rp 3,554.15
Rp 16,866.66
Rp 18,028.00
Rp 12,430.00
Rp 1,367.20
Rp 1,641.20
Rp 33,466.40
Rp 50,333.06
Rp 5,033.31
Rp 55,366.37
: 3 PP, tebal 20 mm
Jumlah Harga
Rp 8,875.01
Rp 4,012.75
Rp 12,887.76
Rp 18,028.00
Rp 12,430.00
Rp 1,367.20
Rp 1,641.20
Rp 33,466.40
Rp 46,354.16
Rp 4,635.42
Rp 50,989.57
Jumlah Harga
Rp 4,173.00
Rp 4,173.00
Rp 9,014.00
Rp 6,215.00
Rp 683.60
Rp 746.00
Rp 16,658.60
Rp 20,831.60
Rp 2,083.16
Rp 22,914.76
alsiboard, tebal 6 mm
Jumlah Harga
Rp 126,500.00
Rp 251.00
Rp 126,751.00
Rp 1,352.10
Rp 4,524.10
Rp 496.65
Rp 298.40
Rp 6,671.25
Rp 133,422.25
Rp 13,342.23
Rp 146,764.48
sum profil
Jumlah Harga
Rp 28,875.00
Rp 675.00
Rp 29,550.00
Rp 4,507.00
Rp 3,231.50
Rp 354.75
Rp 373.00
Rp 8,466.25
Rp 38,016.25
Rp 3,801.63
Rp 41,817.88
PEKERJAAN KAYU
Jumlah Harga
Rp 140,000.00
Rp 2,925.00
Rp 142,925.00
Rp 6,760.50
Rp 29,083.50
Rp 3,192.75
Rp 596.80
Rp 3,789.55
Rp 146,714.55
Rp 14,671.46
Rp 161,386.01
ah calsiboard rangkap
Jumlah Harga
Rp 3,765.00
Rp 98,900.00
Rp 102,665.00
Rp 6,760.50
Rp 14,541.75
Rp 3,192.75
Rp 596.80
Rp 3,789.55
Rp 106,454.55
Rp 10,645.46
Rp 117,100.01
PEKERJAAN DINDING
Jumlah Harga
Rp 81,200.00
Rp 42,307.80
Rp 10,433.15
Rp 133,940.95
Rp 27,042.00
Rp 12,430.00
Rp 1,367.20
Rp 2,238.00
Rp 43,077.20
Rp 177,018.15
Rp 17,701.82
Rp 194,719.97
Jumlah Harga
Rp 81,200.00
Rp 28,504.80
Rp 11,694.30
Rp 121,399.10
Rp 27,042.00
Rp 12,430.00
Rp 1,367.20
Rp 2,238.00
Rp 43,077.20
Rp 164,476.30
Rp 16,447.63
Rp 180,923.93
Jumlah Harga
Rp 40,600.00
Rp 18,451.08
Rp 4,586.00
Rp 63,637.08
Rp 13,521.00
Rp 6,215.00
Rp 683.60
Rp 1,119.00
Rp 21,538.60
Rp 85,175.68
Rp 8,517.57
Rp 93,693.25
Jumlah Harga
Rp 40,600.00
Rp 12,429.12
Rp 5,159.25
Rp 58,188.37
Rp 13,521.00
Rp 6,215.00
Rp 683.60
Rp 1,119.00
Rp 21,538.60
Rp 79,726.97
Rp 7,972.70
Rp 87,699.67
da baja IWF
Jumlah Harga
Rp 17,365.00
Rp 17,365.00
Rp 2,704.20
Rp 4,101.60
Rp 425.70
Rp 223.80
Rp 7,455.30
Rp 24,820.30
Rp 2,482.03
Rp 27,302.33
perakitan
Jumlah Harga
Rp 10,700.00
Rp 3,000.00
Rp 13,700.00
Rp 4,507.00
Rp 6,215.00
Rp 68.36
Rp 373.00
Rp -
Rp 11,163.36
Rp 15,670.36
Rp 1,567.04
Rp 17,237.40
Jumlah Harga
Rp 1,000.00
Rp 321.00
Rp 120.00
Rp 1,441.00
Rp 180.28
Rp 124.30
Rp 13.67
Rp 14.92
Rp -
Rp 333.17
Rp 513.45
Rp 51.35
Rp 564.80
munium
Jumlah Harga
Rp 104,500.00
Rp 6,000.00
Rp 1,800.00
Rp 112,300.00
Rp 1,938.01
Rp 2,672.45
Rp 273.44
Rp 149.20
Rp 5,033.10
Rp 117,333.10
Rp 11,733.31
Rp 129,066.41
m dinding partisi
Jumlah Harga
Rp 93,500.00
Rp 6,000.00
Rp 1,800.00
Rp 101,300.00
Rp 3,830.95
Rp 5,282.75
Rp 615.24
Rp 298.40
Rp 10,027.34
Rp 111,327.34
Rp 11,132.73
Rp 122,460.07
ka alumunium
Jumlah Harga
Rp 79,200.00
Rp 15,750.00
Rp 8,100.00
Rp 103,050.00
Rp 3,830.95
Rp 5,282.75
Rp 615.24
Rp 373.00
Rp 10,101.94
Rp 113,151.94
Rp 11,315.19
Rp 124,467.13
Jumlah Harga
Rp 156,975.00
Rp 292.50
Rp 95,000.00
Rp 252,267.50
Rp 9,014.00
Rp 24,860.00
Rp 1,709.00
Rp 746.00
Rp 36,329.00
Rp 288,596.50
Rp 28,859.65
Rp 317,456.15
Jumlah Harga
Rp 96,390.00
Rp 195.00
Rp 7,550.00
Rp 104,135.00
Rp 6,760.50
Rp 18,645.00
Rp 2,050.80
Rp 596.80
Rp 28,053.10
Rp 132,188.10
Rp 13,218.81
Rp 145,406.91
PEKERJAAN BETON
Jumlah Harga
Rp 317,148.00
Rp 62,272.54
Rp 171,257.14
Rp 64,500.00
Rp 615,177.68
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 714,740.31
Rp 71,474.03
Rp 786,214.34
Jumlah Harga
Rp 354,384.00
Rp 59,334.48
Rp 173,485.71
Rp 64,500.00
Rp 651,704.19
Rp 74,365.50
Rp 14,139.13
Rp 1,914.08
Rp 6,191.80
Rp 96,610.51
Rp 748,314.70
Rp 74,831.47
Rp 823,146.17
Jumlah Harga
Rp 383,916.00
Rp 14,260.34
Rp 174,342.86
Rp 64,500.00
Rp 637,019.20
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 736,581.83
Rp 73,658.18
Rp 810,240.01
n mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
Jumlah Harga
Rp 295,320.00
Rp 63,992.38
Rp 176,057.14
Rp 60,000.00
Rp 595,369.52
Rp 54,084.00
Rp 12,430.00
Rp 1,367.20
Rp 6,191.80
Rp 74,073.00
Rp 669,442.52
Rp 66,944.25
Rp 736,386.78
n mutu f'c = 14,5 Mpa (K 175), slump (12±2) cm, w/c = 0,66
Jumlah Harga
Rp 418,584.00
Rp 54,461.60
Rp 176,400.00
Rp 64,500.00
Rp 713,945.60
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 813,508.23
Rp 81,350.82
Rp 894,859.05
Jumlah Harga
Rp 451,968.00
Rp 52,383.46
Rp 176,742.86
Rp 64,500.00
Rp 745,594.32
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 845,156.95
Rp 84,515.69
Rp 929,672.64
Jumlah Harga
Rp 476,364.00
Rp 50,018.68
Rp 179,485.71
Rp 64,500.00
Rp 770,368.39
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 869,931.02
Rp 86,993.10
Rp 956,924.13
Jumlah Harga
Rp 493,056.00
Rp 49,588.72
Rp 178,114.29
Rp 64,500.00
Rp 785,259.01
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 884,821.64
Rp 88,482.16
Rp 973,303.80
Jumlah Harga
Rp 521,304.00
Rp 49,015.44
Rp 175,885.71
Rp 64,500.00
Rp 810,705.15
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 910,267.78
Rp 91,026.78
Rp 1,001,294.56
Jumlah Harga
Rp 530,292.00
Rp 48,800.46
Rp 175,028.57
Rp 64,500.00
Rp 818,621.03
Rp 74,365.50
Rp 17,091.25
Rp 1,914.08
Rp 6,191.80
Rp 99,562.63
Rp 918,183.66
Rp 91,818.37
Rp 1,010,002.03
Jumlah Harga
Rp 563,676.00
Rp 48,012.20
Rp 172,457.14
Rp 64,500.00
Rp 848,645.34
Rp 94,647.00
Rp 21,752.50
Rp 2,392.60
Rp 7,833.00
Rp 126,625.10
Rp 975,270.44
Rp 97,527.04
Rp 1,072,797.49
Jumlah Harga
Rp 575,232.00
Rp 47,797.22
Rp 171,428.57
Rp 64,500.00
Rp 858,957.79
Rp 94,647.00
Rp 21,752.50
Rp 2,392.60
Rp 7,833.00
Rp 126,625.10
Rp 985,582.89
Rp 98,558.29
Rp 1,084,141.18
olos
Jumlah Harga
Rp 158,550.00
Rp 2,925.00
Rp 161,475.00
Rp 3,154.90
Rp 4,350.50
Rp 478.52
Rp 298.40
Rp 8,282.32
Rp 169,757.32
Rp 16,975.73
Rp 186,733.05
Rp 18,673.31
ir
Jumlah Harga
Rp 202,230.00
Rp 1,950.00
Rp 204,180.00
Rp 2,253.50
Rp 3,107.50
Rp 341.80
Rp 223.80
Rp 5,926.60
Rp 210,106.60
Rp 21,010.66
Rp 231,117.26
Rp 23,111.73
pondasi
Jumlah Harga
Rp 160,000.00
Rp 5,850.00
Rp 1,200.00
Rp 167,050.00
Rp 23,436.40
Rp 16,803.80
Rp 1,844.70
Rp 1,939.60
Rp 44,024.50
Rp 211,074.50
Rp 21,107.45
Rp 232,181.95
sloof
Jumlah Harga
Rp 180,000.00
Rp 5,850.00
Rp 1,200.00
Rp 187,050.00
Rp 23,436.40
Rp 16,803.80
Rp 1,844.70
Rp 1,939.60
Rp 44,024.50
Rp 231,074.50
Rp 23,107.45
Rp 254,181.95
kolom
Jumlah Harga
Rp 160,000.00
Rp 7,800.00
Rp 2,400.00
Rp 75,000.00
Rp 35,700.00
Rp 16,000.00
Rp 296,900.00
Rp 29,746.20
Rp 21,327.90
Rp 2,341.35
Rp 2,461.80
Rp 55,877.25
Rp 352,777.25
Rp 35,277.73
Rp 388,054.98
balok
Jumlah Harga
Rp 160,000.00
Rp 7,800.00
Rp 2,400.00
Rp 90,000.00
Rp 35,700.00
Rp 16,000.00
Rp 311,900.00
Rp 29,746.20
Rp 21,327.90
Rp 2,341.35
Rp 2,461.80
Rp 55,877.25
Rp 367,777.25
Rp 36,777.73
Rp 404,554.98
lantai
Jumlah Harga
Rp 160,000.00
Rp 7,800.00
Rp 2,400.00
Rp 75,000.00
Rp 35,700.00
Rp 48,000.00
Rp 328,900.00
Rp 29,746.20
Rp 21,327.90
Rp 2,341.35
Rp 2,461.80
Rp 55,877.25
Rp 384,777.25
Rp 38,477.73
Rp 423,254.98
dinding
Jumlah Harga
Rp 120,000.00
Rp 7,800.00
Rp 2,400.00
Rp 100,000.00
Rp 35,700.00
Rp 24,000.00
Rp 289,900.00
Rp 29,746.20
Rp 21,327.90
Rp 2,341.35
Rp 2,461.80
Rp 343,315.45
Rp 633,215.45
Rp 63,321.55
Rp 696,537.00
tangga
Jumlah Harga
Rp 120,000.00
Rp 7,800.00
Rp 1,800.00
Rp 75,000.00
Rp 35,700.00
Rp 16,000.00
Rp 256,300.00
Rp 29,746.20
Rp 21,327.90
Rp 2,341.35
Rp 2,461.80
Rp 55,877.25
Rp 312,177.25
Rp 31,217.73
Rp 343,394.98
k pengecoran beton
Jumlah Harga
Rp 105,600.00
Rp 11,700.00
Rp 4,000.00
Rp 121,300.00
Rp 6,760.50
Rp 3,231.50
Rp 354.75
Rp 596.80
Rp 10,943.55
Rp 132,243.55
Rp 13,224.36
Rp 145,467.91
Jumlah Harga
Rp 973,303.80
Rp 617,603.99
Rp 2,311,172.60
Rp 1,232,438.14
Rp 5,134,518.53
Jumlah Harga
Rp 973,303.80
Rp 263,062.15
Rp 1,595,310.00
Rp 745,569.06
Rp 3,577,245.00
Jumlah Harga
Rp 973,303.80
Rp 251,220.87
Rp 1,523,548.09
Rp 712,031.80
Rp 3,460,104.56
Jumlah Harga
Rp 973,303.80
Rp 329,001.82
Rp 1,362,228.24
Rp 645,181.37
Rp 3,309,715.23
Jumlah Harga
Rp 973,303.80
Rp 410,265.51
Rp 1,392,643.27
Rp 665,908.74
Rp 3,442,121.32
Jumlah Harga
Rp 973,303.80
Rp 544,234.49
Rp 1,442,865.05
Rp 703,255.35
Rp 3,663,658.69
ertulang F.6 = 1.50 x 1.50 m', K250
Jumlah Harga
Rp 973,303.80
Rp 544,234.49
Rp 1,442,865.05
Rp 700,547.72
Rp 3,660,951.06
Jumlah Harga
Rp 973,303.80
Rp 266,312.70
Rp 1,170,400.92
Rp 449,970.64
Rp 2,859,988.05
Jumlah Harga
Rp 973,303.80
Rp 2,540,802.77
Rp 3,645,551.21
Rp 1,247,358.11
Rp 8,407,015.90
Jumlah Harga
Rp 973,303.80
Rp 3,389,007.94
Rp 3,109,404.09
Rp 7,471,715.83
Jumlah Harga
Rp 973,303.80
Rp 4,139,382.42
Rp 6,439,458.43
Rp 1,097,038.01
Rp 12,649,182.66
Jumlah Harga
Rp 973,303.80
Rp 5,173,936.98
Rp 5,717,841.01
Rp 962,851.64
Rp 12,827,933.43
tulang K3.1 = 30/30 (Pedestal), K250
Jumlah Harga
Rp 973,303.80
Rp 7,761,099.50
Rp 2,736,959.93
Rp 1,382,086.01
Rp 12,853,449.24
Jumlah Harga
Rp 973,303.80
Rp 7,761,099.50
Rp 2,736,959.93
Rp 1,382,086.01
Rp 12,853,449.24
Jumlah Harga
Rp 973,303.80
Rp 5,172,772.82
Rp -
Rp 5,727,289.44
Rp 11,873,366.05
Jumlah Harga
Rp 973,303.80
Rp 6,895,736.91
Rp -
Rp 2,232,393.64
Rp 10,101,434.34
Jumlah Harga
Rp 973,303.80
Rp 7,070,361.64
Rp -
Rp 2,209,238.74
Rp 10,252,904.18
Jumlah Harga
Rp 973,303.80
Rp 7,761,099.50
Rp 6,223,812.62
Rp 14,958,215.92
Rp 180,994.41
Jumlah Harga
Rp 973,303.80
Rp 6,208,879.60
Rp -
Rp 4,435,432.84
Rp 11,617,616.24
Jumlah Harga
Rp 973,303.80
Rp 6,895,736.91
Rp -
Rp 2,232,393.64
Rp 10,101,434.34
Jumlah Harga
Rp 973,303.80
Rp 3,104,439.80
Rp 4,415,633.92
Rp 842,502.18
Rp 9,335,879.71
Jumlah Harga
Rp 973,303.80
Rp 4,139,382.42
Rp 6,439,458.43
Rp 1,097,038.01
Rp 12,649,182.66
Jumlah Harga
Rp 973,303.80
Rp 5,173,936.98
Rp 5,717,841.01
Rp 962,851.64
Rp 12,827,933.43
Jumlah Harga
Rp 973,303.80
Rp 5,173,936.98
Rp 5,717,841.01
Rp 962,851.64
Rp 12,827,933.43
Jumlah Harga
Rp 973,303.80
Rp 3,202,861.74
Rp 3,216,274.01
Rp 977,827.63
Rp 8,370,267.18
Jumlah Harga
Rp 973,303.80
Rp 4,854,659.70
Rp 2,235,181.24
Rp 1,681,549.81
Rp 9,744,694.55
Jumlah Harga
Rp 973,303.80
Rp 3,282,154.51
Rp -
Rp 4,502,507.35
Rp 8,757,965.66
Jumlah Harga
Rp 973,303.80
Rp 3,506,277.97
Rp -
Rp 3,895,961.05
Rp 8,375,542.82
Jumlah Harga
Rp 973,303.80
Rp 4,719,133.78
Rp -
Rp 3,110,225.71
Rp 8,802,663.30
Jumlah Harga
Rp 973,303.80
Rp 4,854,659.70
Rp 2,554,492.85
Rp 1,349,837.21
Rp 9,732,293.56
Jumlah Harga
Rp 973,303.80
Rp 5,201,363.31
Rp 3,649,272.20
Rp 1,591,058.97
Rp 11,414,998.28
Jumlah Harga
Rp 973,303.80
Rp 11,910,098.46
Rp 2,606,632.91
Rp 1,117,186.50
Rp 16,607,221.67
Jumlah Harga
Rp 973,303.80
Rp 7,012,151.38
Rp 3,212,219.31
Rp 11,197,674.49
Jumlah Harga
Rp 973,303.80
Rp 4,719,942.89
Rp 3,041,064.02
Rp 1,261,157.69
Rp 9,995,468.40
Jumlah Harga
Rp 973,303.80
Rp 4,854,659.70
Rp 2,919,427.00
Rp 1,349,837.21
Rp 10,097,227.72
Jumlah Harga
Rp 973,303.80
Rp 5,056,937.19
Rp 3,193,116.06
Rp 1,491,511.58
Rp 10,714,868.63
Jumlah Harga
Rp 973,303.80
Rp 4,854,659.70
Rp 2,919,427.00
Rp 1,349,837.21
Rp 10,097,227.72
Jumlah Harga
Rp 973,303.80
Rp 5,393,931.48
Rp 3,041,064.02
Rp 1,171,320.42
Rp 10,579,619.72
Jumlah Harga
Rp 973,303.80
Rp 4,719,942.89
Rp 2,128,751.75
Rp 1,261,157.69
Rp 9,083,156.13
Jumlah Harga
Rp 973,303.80
Rp 5,056,937.19
Rp 2,736,959.93
Rp 1,491,511.58
Rp 10,258,712.49
Jumlah Harga
Rp 973,303.80
Rp 5,393,931.48
Rp 3,041,064.02
Rp 1,724,162.29
Rp 11,132,461.59
Jumlah Harga
Rp 973,303.80
Rp 8,090,290.39
Rp 5,695,358.09
Rp 14,758,952.28
Jumlah Harga
Rp 973,303.80
Rp 3,526,983.71
Rp 2,470,478.28
Rp 6,970,765.78
Jumlah Harga
Rp 973,303.80
Rp 2,821,840.92
Rp 2,343,032.97
Rp 6,138,177.69
Jumlah Harga
Rp 973,303.80
Rp 4,232,549.75
Rp 2,083,772.80
Rp 7,289,626.35
Jumlah Harga
Rp 973,303.80
Rp 9,438,585.94
Rp 1,260,821.57
Rp 11,672,711.31
Jumlah Harga
Rp 973,303.80
Rp 1,200,000.00
Rp 1,757,270.06
Rp 3,930,573.86
Jumlah Harga
Rp 135,680.00
Rp 13,353.60
Rp 5,159.25
Rp 22,518.00
Rp 176,710.85
Rp 31,549.00
Rp 21,752.50
Rp 2,392.60
Rp 2,611.00
Rp 58,305.10
Rp 235,015.95
Rp 23,501.60
Rp 258,517.55
Jumlah Harga
Rp 143,100.00
Rp 1,463.76
Rp 343.95
Rp 347.50
Rp 145,255.21
Rp 4,056.30
Rp 5,593.50
Rp 615.24
Rp 373.00
Rp 10,638.04
Rp 155,893.25
Rp 15,589.33
Rp 171,482.58
Jumlah Harga
Rp 56,800.00
Rp 11,941.20
Rp 2,063.70
Rp 40,310.00
Rp 111,114.90
Rp 40,563.00
Rp 27,967.50
Rp 3,076.20
Rp 3,357.00
Rp 74,963.70
Rp 186,078.60
Rp 18,607.86
Rp 204,686.46
aras
Jumlah Harga
Rp 180,000.00
Rp 15,087.00
Rp 4,012.75
Rp 199,099.75
Rp 398,199.50
Rp 21,752.50
Rp 2,392.60
Rp 2,611.00
Rp 424,955.60
Rp 451,711.70
Rp 45,171.17
Rp 496,882.87
mik
Jumlah Harga
Rp 105,000.00
Rp 585.00
Rp 105,585.00
Rp 9,014.00
Rp 6,463.00
Rp 709.50
Rp 746.00
Rp 16,932.50
Rp 122,517.50
Rp 12,251.75
Rp 134,769.25
Jumlah Harga
Rp 70,000.00
Rp 975.00
Rp 13,867.20
Rp 3,668.80
Rp 13,900.00
Rp 102,411.00
Rp 18,028.00
Rp 12,926.00
Rp 1,419.00
Rp 1,492.00
Rp 33,865.00
Rp 136,276.00
Rp 13,627.60
Rp 149,903.60
PEKERJAAN PENGECATAN
ok kayu
Jumlah Harga
Rp 1,968.80
Rp 201.60
Rp 2,170.40
Rp 1,802.80
Rp 2,486.00
Rp 248.60
Rp 186.50
Rp 4,723.90
Rp 6,894.30
Rp 689.43
Rp 7,583.73
Jumlah Harga
Rp 9,000.00
Rp 3,691.50
Rp 7,650.00
Rp 13,353.60
Rp 21,003.60
Rp 3,154.90
Rp 559.35
Rp 372.90
Rp 186.50
Rp 4,273.65
Rp 25,277.25
Rp 2,527.73
Rp 27,804.98
Jumlah Harga
Rp 9,000.00
Rp 3,691.50
Rp 7,650.00
Rp 17,976.00
Rp 25,626.00
Rp 3,154.90
Rp 6,525.75
Rp 248.60
Rp 186.50
Rp 10,115.75
Rp 35,741.75
Rp 3,574.18
Rp 39,315.93
Jumlah Harga
Rp 2,460.00
Rp 5,500.00
Rp 8,060.00
Rp 16,020.00
Rp 901.40
Rp 3,915.45
Rp 391.55
Rp 186.50
Rp 5,394.90
Rp 21,414.90
Rp 2,141.49
Rp 23,556.38
Jumlah Harga
Rp 2,460.00
Rp 5,500.00
Rp 22,802.00
Rp 30,762.00
Rp 901.40
Rp 3,915.45
Rp 391.55
Rp 186.50
Rp 5,394.90
Rp 36,156.90
Rp 3,615.69
Rp 39,772.58
Jumlah Harga
Rp 75,000.00
Rp 75,000.00
Rp 11,267.50
Rp 38,778.00
Rp 4,257.00
Rp 932.50
Rp 55,235.00
Rp 130,235.00
Rp 13,023.50
Rp 143,258.50
Jumlah Harga
Rp 28,000.00
Rp 28,000.00
Rp 4,507.00
Rp 12,926.00
Rp 1,064.25
Rp 559.50
Rp 19,056.75
Rp 47,056.75
Rp 4,705.68
Rp 51,762.43
Jumlah Harga
Rp 12,000.00
Rp 12,000.00
Rp 4,507.00
Rp 12,926.00
Rp 1,064.25
Rp 559.50
Rp 19,056.75
Rp 31,056.75
Rp 3,105.68
Rp 34,162.43
Jumlah Harga
Rp 8,000.00
Rp 8,000.00
Rp 1,126.75
Rp 3,231.50
Rp 354.75
Rp 96.98
Rp 4,809.98
Rp 12,809.98
Rp 1,281.00
Rp 14,090.98
Jumlah Harga
Rp 4,800.00
Rp 4,800.00
Rp 1,126.75
Rp 3,231.50
Rp 354.75
Rp 96.98
Rp 4,809.98
Rp 9,609.98
Rp 961.00
Rp 10,570.98
Jumlah Harga
Rp 11,000.00
Rp 11,000.00
Rp 11,267.50
Rp 38,778.00
Rp 4,257.00
Rp 932.50
Rp 55,235.00
Rp 66,235.00
Rp 6,623.50
Rp 72,858.50
Jumlah Harga
Rp 88,000.00
Rp 88,000.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 93,588.61
Rp 9,358.86
Rp 102,947.47
Jumlah Harga
Rp 121,000.00
Rp 121,000.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 126,588.61
Rp 12,658.86
Rp 139,247.47
5 mm
Jumlah Harga
Rp 154,990.00
Rp 154,990.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 160,578.61
Rp 16,057.86
Rp 176,636.47
Jumlah Harga
Rp 198,000.00
Rp 198,000.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 203,588.61
Rp 20,358.86
Rp 223,947.47
8 mm
Jumlah Harga
Rp 209,990.00
Rp 209,990.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 215,578.61
Rp 21,557.86
Rp 237,136.47
Jumlah Harga
Rp 253,000.00
Rp 253,000.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 258,588.61
Rp 25,858.86
Rp 284,447.47
Jumlah Harga
Rp 308,000.00
Rp 308,000.00
Rp 1,126.75
Rp 3,231.50
Rp 1,170.68
Rp 59.68
Rp 5,588.61
Rp 313,588.61
Rp 31,358.86
Rp 344,947.47
Kukuh Sugiarto,ST.
Direktur
REKAPITULASI ANALISA BIAYA SATUAN PEKERJAAN
PROGRAM
PEKERJAAN
LOKASI
TAHUN ANGGARAN
SNI T-12-2002
A.6.4
RSNI T-12-2002.6.2
SNI 2835:2008
SNI 2835:08.6.1
SNI 2835:08.6.2
SNI 2835:08.6.3
SNI 2835:08.6.4
SNI 2835:08.6.9
SNI 2835:08.6.10
SNI 2835:08.6.11
SNI 2835:08.6.15
SNI 2836:2008
SNI 2836:08.6.1
SNI 2836:08.6.3
SNI 2836:08.6.9
SNI 2837:2008
SNI 2837:08.6.3
SNI 2837:08.6.5
SNI 2837:08.6.14
SNI 2837:08.6.16
SNI 2837:08.6.27
SNI 2839:2008
SNI 2839:08.6.1
SNI 2839:08.6.8
SNI 3434:2008
SNI 3434:08.6.23
SNI 3434:08.6.24
SNI 6897:2008
SNI 6897:08.6.2
SNI 6897:08.6.4
SNI 6897:08.6.8
SNI 6897:08.6.10
SNI 7393:2008
SNI 7393:08.6.1
SNI 7393:08.6.2
SNI 7393:08.6.3
SNI 7393:08.6.5
SNI 7393:08.6.11
SNI 7393:08.6.12
SNI 7393:08.6.13
SNI 7393:08.6.18
SNI 7393:08.6.19
SNI 7394:2008
SNI 7394:08.6.1
SNI 7394:08.6.2
SNI 7394:08.6.3
SNI 7394:08.6.4
SNI 7394:08.6.5
SNI 7394:08.6.6
SNI 7394:08.6.7
SNI 7394:08.6.8
SNI 7394:08.6.9
SNI 7394:08.6.10
SNI 7394:08.6.11
SNI 7394:08.6.12
SNI 7394:08.6.17
SNI 7394:08.6.17.a
SNI 7394:08.6.18
SNI 7394:08.6.18.a
SNI 7394:08.6.20
SNI 7394:08.6.21
SNI 7394:08.6.22
SNI 7394:08.6.23
SNI 7394:08.6.24
SNI 7394:08.6.25
SNI 7394:08.6.26
SNI 7394:08.6.27
SNI 7394:08.6.28
SNI 7394:08.6.28.f
SNI 7394:08.6.28.g
SNI 7394:08.6.29
SNI 7394:08.6.29.a
SNI 7394:08.6.30.d
SNI 7394:08.6.30.e
SNI 7394:08.6.30.f
SNI 7394:08.6.30.g
SNI 7394:08.6.30.g.1
SNI 7394:08.6.30.d
SNI 7394:08.6.30.i
SNI 7394:08.6.30.e
SNI 7394:08.6.30.f
SNI 7394:08.6.30.l
SNI 7394:08.6.30.m
SNI 7394:08.6.30.n
SNI 7394:08.6.30.o
SNI 7394:08.6.31
SNI 7394:08.6.31.a
SNI 7394:08.6.31.b
SNI 7394:08.6.31.c
SNI 7394:08.6.31.d
SNI 7394:08.6.31.e
SNI 7394:08.6.31.f
SNI 7394:08.6.31.g
SNI 7394:08.6.31.h
SNI 7394:08.6.31.i
SNI 7394:08.6.31.j
SNI 7394:08.6.31.k
SNI 7394:08.6.31.l
SNI 7394:08.6.31.m
SNI 7394:08.6.31.n
SNI 7394:08.6.31.o
SNI 7394:08.6.31.p
SNI 7394:08.6.31.q
SNI 7394:08.6.32
SNI 7394:08.6.32.a
SNI 7394:08.6.32.b
SNI 7394:08.6.32.c
SNI 7394:08.6.32.d
SNI 7395:2008
SNI 7395:08.6.34
SNI 7395:08.6.35
SNI 7395:08.6.39
SNI 7395:08.6.41
SNI 7395:08.6.58
SNI 2002.8
SNI-02.8.6.30
SNI-02.8.6.34
SNI 2002.14
SNI-02.14.6.6
SNI-02.14.6.8
SNI-02.14.6.9
SNI-02.14.6.14
SNI-02.14.6.14.a
SNI 2002.17
SNI-02.17.6.2
SNI-02.17.6.5
SNI-02.17.6.6
SNI-02.17.6.7
SNI-02.17.6.8
SNI-02.17.6.9
SNI-02.17.6.16
SNI-02.17.6.17
SNI-02.17.6.17.a
SNI-02.17.6.18
SNI-02.17.6.18.a
SNI-02.17.6.19
SNI-02.17.6.20
ANALISA BIAYA SATUAN PEKERJAAN
URAIAN PEKERJAAN
2
Rp 96,900.65
Rp 218,278.50
Rp 39,234.25
Rp 48,312.00
Rp 57,553.87
Rp 52,202.92
Rp 17,400.97
Rp 28,891.50
Rp 150,030.10
Rp 123,933.70
Rp 731,423.83
Rp 645,646.21
Rp 373,714.76
Rp 41,370.16
Rp 38,087.56
Rp 55,366.37
Rp 50,989.57
Rp 22,914.76
Rp 146,764.48
Rp 41,817.88
Rp 161,386.01
Rp 117,100.01
Rp 194,719.97
Rp 180,923.93
Rp 93,693.25
Rp 87,699.67
Rp 27,302.33
Rp 27,302.33
Rp 17,237.40
Rp 564.80
Rp 129,066.41
Rp 122,460.07
Rp 124,467.13
Rp 317,456.15
Rp 145,406.91
Rp 786,214.34
Rp 823,146.17
Rp 810,240.01
Rp 736,386.78
Rp 894,859.05
Rp 929,672.64
Rp 956,924.13
Rp 973,303.80
Rp 1,001,294.56
Rp 1,010,002.03
Rp 1,072,797.49
Rp 1,084,141.18
Rp 186,733.05
Rp 18,673.31
Rp 231,117.26
Rp 23,111.73
Rp 232,181.95
Rp 254,181.95
Rp 388,054.98
Rp 404,554.98
Rp 423,254.98
Rp 696,537.00
Rp 343,394.98
Rp 145,467.91
Rp 5,134,518.53
Rp 3,660,951.06
Rp 2,859,988.05
Rp 8,407,015.90
Rp 7,471,715.83
Rp 11,873,366.05
Rp 10,101,434.34
Rp 10,252,904.18
Rp 14,958,215.92
Rp 14,958,215.92
Rp 13,992,539.41
Rp 11,617,616.24
Rp 10,101,434.34
Rp 10,252,904.18
Rp 12,649,182.66
Rp 12,827,933.43
Rp 12,649,182.66
Rp 12,827,933.43
Rp 8,370,267.18
Rp 9,744,694.55
Rp 8,757,965.66
Rp 8,375,542.82
Rp 8,802,663.30
Rp 9,732,293.56
Rp 11,414,998.28
Rp 16,607,221.67
Rp 11,197,674.49
Rp 9,995,468.40
Rp 10,097,227.72
Rp 10,714,868.63
Rp 10,097,227.72
Rp 10,579,619.72
Rp 9,083,156.13
Rp 10,258,712.49
Rp 11,132,461.59
Rp 14,758,952.28
Rp 6,970,765.78
Rp 6,138,177.69
Rp 7,289,626.35
Rp 11,672,711.31
Rp 3,930,573.86
Rp 178,890.31
Rp 258,517.55
Rp 171,482.58
Rp 204,686.46
Rp 496,882.87
Rp 134,769.25
Rp 149,903.60
Rp 7,583.73
Rp 27,804.98
Rp 39,315.93
Rp 23,556.38
Rp 39,772.58
Rp 143,258.50
Rp 51,762.43
Rp 34,162.43
Rp 14,090.98
Rp 10,570.98
Rp 72,858.50
Rp 102,947.47
Rp 139,247.47
Rp 176,636.47
Rp 223,947.47
Rp 237,136.47
Rp 284,447.47
Rp 344,947.47
RENCANA ANGGARAN BIAYA
(RAB)
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APRATUR NEGARA BPS PROVINSI NTB
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BPS
LOKASI : PRAYA KABUPATEN LOMBOK TENGAH
TAHUN ANGGARAN : 2013
URAIAN PEKERJAAN
NO SAT KODE ANALISA HARGA SATUAN
1 2 4 5 6
1 2 4 5 6
1 2 4 5 6
V. PEKERJAAN PARTISI
Pek. Rangka Kusen Dinding Partisi M1 SNI 7393:08.6.12 Rp 122,460.07
1
Pek. Dinding Partisi Calsiboard 6mm M2 SNI 3434:08.6.24 Rp 117,100.01
2
Pek. Kaca 5 mm Partisi M2 SNI-02.17.6.17 Rp 139,247.47
3
JUMLAH HARGA
Rp 964,038,811.76
Rp 24,709,202.51
Rp 997,000.00
Rp 6,878,900.00
Rp 496,000.00
Rp 10,000,000.00
Rp 6,337,302.51
Rp -
Rp 10,740,997.01
Rp 4,623,877.92
Rp 2,802,110.14
Rp 1,109,416.46
Rp 764,553.39
Rp 1,441,039.11
Rp 143,822,372.82
Rp 6,706,685.07
Rp 22,529,824.50
Rp 854,857.19
Rp 24,712,713.76
Rp 2,965,367.31
Rp 31,415,339.28
Rp 5,265,642.30
Rp 8,520,357.78
Rp 2,994,209.75
Rp 3,391,316.55
Rp 288,150.00
Rp 24,410,475.13
Rp 9,767,434.19
Rp 703,778,389.30
Rp 4,560,201.73
Rp 48,059,093.44
Rp 1,647,427.98
Rp 71,350,343.93
Rp 6,321,071.59
Rp 177,815,530.02
Rp 20,455,404.54
Rp 20,762,130.97
Rp 5,997,948.95
Rp 110,367,883.26
Rp 6,047,429.68
Rp 8,967,899.70
Rp 14,976,646.82
Rp 170,456,135.71
Rp 12,761,271.41
Rp 7,263,700.49
Rp 15,968,269.07
JUMLAH HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 80,987,850.12
Rp 36,990,937.27
Rp 7,781,378.10
Rp 3,602,481.70
Rp 22,790,034.22
Rp -
Rp -
Rp 9,823,018.84
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 217,874,554.41
Rp 33,757,500.59
Rp -
Rp 16,348,589.32
Rp -
Rp 17,408,911.28
Rp -
Rp -
Rp -
Rp 184,117,053.82
Rp 60,992,485.24
Rp 14,373,330.92
Rp 16,148,324.09
Rp -
Rp 80,719,293.91
Rp 4,238,482.38
Rp -
Rp 7,645,137.28
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
JUMLAH HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
REKAPILTULASI
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APRATUR NEGARA BPS PROVINSI NTB
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BPS
LOKASI : PRAYA KABUPATEN LOMBOK TENGAH
TAHUN ANGGARAN : 2013
URAIAN PEKERJAAN
NO.
1 2
JUMLAH HARGA
3
Rp 964,038,811.76
Rp 24,709,202.51
Err:509
Rp 10,740,997.01
Rp 143,822,372.82
Rp 703,778,389.30
Rp -
Rp 80,987,850.12
Rp -
Rp 217,874,554.41
Rp 33,757,500.59
Rp 184,117,053.82
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 1,401,583,128.00
Rp 628,004,025.00
Rp 773,579,103.00
Rp 2,583,496,494.18
Rp 258,349,649.42
Rp 2,841,846,143.59
Rp 2,841,846,000.00
h Ratus Delapan Puluh Satu Juta Enam Ratus Empat Puluh Dua Ribu
Kukuh Sugiarto,ST.
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
JASA
Manajemen Proyek
III. 15,500.98 - 15,500.98 100.00% 3.00%
& Perekayasaan
Alat Kerja /
IV. 51,669.93 - 51,669.93 100.00% 10.00%
Fasilitas Kerja
V. Konstruksi & Fabrikasi 413,359.44 - 413,359.44 100.00% 80.00%
VI. Jasa Umum 36,168.95 - 36,168.95 100.00% 7.00%
B. Sub Total Jasa 516,699.30 - 516,699.30 100.00% 100.00%
C. Total Biaya A + B 2,583,496.49 - 2,583,496.49
* Capaian Nilai TKDN di atas dinyatakan sendiri oleh : PT. Damai Indah Utama Mataram, 16 Juni 2012
Kontraktor Pelaksana
PT. Damai Indah Utama
KUKUH SUGIARTO
Direktur
ITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
TKDN GABUNGAN
RUPIAH %
(6) (7)
1,756,777.62 68.00%
310,019.58 12.00%
2,066,797.20 80.00%
15,500.98 0.60%
51,669.93 2.00%
413,359.44 16.00%
36,168.95 1.40%
516,699.30 20.00%
2,583,496.49 100.00%
TIME SC
PROGRAM
PEKERJAAN
LOKASI
TAHUN ANGGARAN
A.
PEKERJAAN LANTAI I (SATU)
I.
PEKERJAAN PENDAHULUAN/PERSIAPAN
Pek. Pembersihan Lokasi Proyek -
1 1.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Izin Mendirikan Bangunan (IMB) M2
2 1,251.46 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Papan Nama Proyek Unit
3 1.00 #DIV/0! #DIV/0!
Sewa Direksi Keet Unit
4 1.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Pek. Pas. Papan Bowplank M'
5 85.00 #DIV/0! #DIV/0!
Pek. Dinding Sementara Multipleks (Lt. I & Lt. II) M2
6 474.11 #DIV/0! #DIV/0! #DIV/0!
II.
PEKERJAAN BONGKARAN
Pek. Bongkaran Dinding Bata & Kusen M3
1 540.75 Err:509 Err:509 Err:509
Pek. Bongkaran Kolom Struktur M3
2 25.20 Err:509 Err:509 Err:509
Pek. Bongkaran Balok Struktur M3
3 21.03 Err:509 Err:509 Err:509
Pek. Bongkaran Plat Lantai & Tangga M3
4 29.03 Err:509 Err:509 Err:509
Pek. Bongkaran Atap M2
5 371.00 Err:509 Err:509 Err:509
III.
PEKERJAAN TANAH DAN PASIR
Pek. Galian Tanah Pondasi Plat M3
1 897.36 #DIV/0!
Pek. Galian Tanah Pondasi Batu Kali M3
2 174.85 #DIV/0!
Pek. Urugan Tanah Peninggian Lantai M3
3 220.50 Err:509
Pek. Urugan Kembali M3
4 357.40 #DIV/0!
Pek. Urugan Pasir Bawah Pondasi M3
5 171.10 #DIV/0!
Pek. Urugan Pasir Bawah Lantai M3
6 36.75 #DIV/0!
IV.
PEKERJAAN PASANGAN DAN PLESTERAN
Pek. Pondasi Batu Kosong M3
1 30.41 #DIV/0!
Pek. Pondasi Batu Belah, Camp. 1PC : 5PS M3
2 75.62 #DIV/0!
Pek. Pas. Trasraam, Camp. 1PC : 3PS M2
3 108.80 #DIV/0!
Pek. Pas. Dinding Bata 1PC : 5PS M2
4 580.77 #DIV/0!
Pek. Plesteran Trasraam, Camp. 1PC : 3PS M2
5 217.60 #DIV/0!
Pek. Plesteran Dinding Bata, Camp. 1PC : 5PS M2
6 1,161.55 #DIV/0!
Pek. Plesteran Kolom M2
7 192.00 #DIV/0!
Pek. Acian M2
8 1,571.15 #DIV/0!
Pek. Rabat Beton Bawah Lantai M3
9 18.38 #DIV/0!
V.
PEKERJAAN BETON
Pek. Lantai Kerja Beton, K175 M3
1 25.84 #DIV/0!
Pek. Foot Plat 300 x 450, K250 (F1) M3
2 25.50 #DIV/0!
Pek. Foot Plat 300 x 450, K250 (F1a) M3
3 25.31 Err:509
Pek. Foot Plat 250 x 450, K250 (F2) M3
4 8.52 Err:509
Pek. Foot Plat 250 x 250, K250 (F3) M3
5 4.60 Err:509
Pek. Foot Plat 200 x 200, K250 (F4) M3
6 8.87 Err:509
Pek. Foot Plat 150 x 150, K250 (F5) M3
7 3.39 Err:509
Pek. Foot Plat 150 x 150, K250 (F6) M3
8 2.51 Err:509
Pek. Foot Plat Tangga150 x 150, K250 M3
9 1.34 #DIV/0!
Pek. Pondasi Lift M3
10 10.02 Err:509
Pek. Sloof 20/35, K 250 M3
11 18.24 #DIV/0!
Pek. Sloof 15/20, K 250 M3
12 0.85 #DIV/0!
Pek. Kolom Pedestal 50/50, K 250 (Kolom K1-1) M3
13 3.83 Err:509
Pek. Kolom Pedestal 30/50, K 250 (Kolom K2-1) M3
14 1.84 Err:509
Pek. Kolom Pedestal 30/30, K 250 (Kolom K3-1) M3
15 1.61 Err:509
Pek. Kolom Pedestal 30/30, K 250 (Kolom K4-1) M3
16 0.38 Err:509
Pek. Kolom 50/50, K 250 (Kolom K1-2) M3
17 6.45 #DIV/0!
Pek. Kolom 30/50, K 250 (Kolom K2-2) M3
18 3.10 #DIV/0!
Pek. Kolom 30/30, K 250 (Kolom K3-2) M3
19 4.64 #DIV/0!
Pek. Kolom Praktis 11/11 M1
20 107.50 #DIV/0!
Pek. Balok 30/80, K 250 (Balok BK1) M3
21 4.32 Err:509
Pek. Balok 30/70, K 250 (Balok B1) M3
22 9.45 #DIV/0!
Pek. Balok 30/50, K 250 (Balok B2) M3
23 4.88 Err:509
Pek. Balok 30/40, K 250 (Balok B3) M3
24 4.50 #DIV/0!
Pek. Balok 20/50, K 250 (Balok B4) M3
25 3.50 Err:509
Pek. Balok 20/35, K 250 (Balok B5) M3
26 0.53 Err:509
Pek. Balok 20/35, K 250 (Balok B6) M3
27 3.61 Err:509
Pek. Balok 20/60, K 250 (Balok B7) M3
28 4.26 Err:509
Pek. Balok 20/50, K 250 (Balok B8) M3
29 4.05 Err:509
Pek. Balok 20/40, K 250 (Balok B9) M3
30 2.79 Err:509
Pek. Balok Bordes 20/35, K 250 (Balok B6) M3
31 0.42 #DIV/0!
Pek. Balok Latei 11x20 cm M3
32 0.50 #DIV/0!
Pek. Plat Lantai II, tebal = 12cm M3
33 57.69 #DIV/0!
Pek. Plat Tangga, tebal = 12cm M3
34 7.31 #DIV/0!
Pek. List Plank Beton M3
35 1.93 #DIV/0!
VI.
PEKERJAAN KUSEN ALUMINIUM DAN KACA
Pek. Kusen Pintu dan Jendela Aluminium M1
1 239.49 #DIV/0!
Pek. Daun Pintu dan Jendela Aluminium M2
2 51.73 #DIV/0!
Pek. Rangka Plafond Metal furing M2
3 344.45 #DIV/0!
Pek. Kaca 3 mm M2
4 11.98 #DIV/0!
Pek. Kaca 5 mm M2
5 20.66 #DIV/0!
Pek. Kaca 12 mm M2
6 4.27 #DIV/0!
Pek. Alluminium Composite & Rangka Hollow M2
7 3.39 #DIV/0!
Pek. Relling Tangga + Kaca 8mm M2
8 10.64 #DIV/0!
V. PEKERJAAN PARTISI
Pek. Rangka Kusen Dinding Partisi M1
1 133.45 #DIV/0!
Pek. Dinding Partisi Calsiboard 6mm M2
2 176.22 #DIV/0!
Pek. Kaca 5 mm Partisi M2
3 45.34 #DIV/0!
V. PEKERJAAN PARTISI
Pek. Rangka Kusen Dinding Partisi M1
1 410.20 Err:509
Pek. Dinding Partisi Calsiboard 6mm M2
2 210.22 Err:509
Pek. Kaca 5 mm Partisi M2
3 41.69 Err:509
V. PEKERJAAN ATAP
Pek. Atap Genteng Keramik M2
1 363.15 Err:509
Pek. Bubungan Genteng Keramik M1
2 68.40 Err:509
Pek. Rangka Atap Baja Ringan M2
3 363.15 Err:509
Pek. Listplank GRC 10 mm M1
4 74.60 Err:509
Pek. Talang M1
5 15.62 Err:509
Pek. Rangka Atap Baja Siku 2L 60.60.8 mm Kg.
6 4,228.14 Err:509
Pek. Rangka Atap Baja Siku 2L 45.45.7 mm Kg.
7 2,249.22 Err:509
Pek. Gording Baja Profil Kanal 150.65.20.2,3 mm Kg.
8 1,787.50 Err:509
Pek. Gording Baja Profil Kanal 125.50.202,3 mm Kg.
9 493.85 Err:509
Pek. Dudukan Gording Profil Siku L 50.65.5 mm Kg.
10 41.85 Err:509
Pek. Plat Simpul t = 8 mm Kg.
11 933.53 Err:509
Pek. Plat Dudukan/Landasan t = 10 mm Kg.
12 72.31 Err:509
Bout Angker Ø 14 mm Bh.
13 92.00 Err:509
Bout Mur Kuda-kuda Ø 12 mm Bh.
14 3,100.00 Err:509
Pek. Pengelasan Cm.
15 2,886.00 Err:509
Pek. Erection/Penyetelan /100Kg.
16 88.01 Err:509
Pek. Atap spandek 0,35mm M2
17 83.70 Err:509
Pek. Rangka Atap Spandec Pipa GI Ø 3" M1
18 36.40 Err:509
VI. PEKERJAAN BESI PENGUNCI
Kunci Pintu Bh.
1 8.00 Err:509
Engsel Pintu Bh.
2 24.00 Err:509
Engsel Jendela Bh.
3 36.00 Err:509
Grendel Pintu Bh.
4 24.00 Err:509
Grendel Jendela Bh.
5 36.00 Err:509
Hak Angin Bh.
6 36.00 Err:509
MINGGU KE-
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 3 hari
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
Err:509
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
#DIV/0!
Err:509
#DIV/0!
#DIV/0!
Err:509
Err:509
Err:509
Err:509
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
Err:509 Err:509
#DIV/0! #DIV/0!
Err:509 Err:509
#DIV/0! #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Err:509
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
Err:509 Err:509
Err:509 Err:509
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 1.350 0.579
1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 1.663506 0.7129311
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
KUKUH SUGIARTO,ST.
Direktur
KET.
PEKERJAAN YANG DISUBKONTRAKKAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR NEGARA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR WILAYAH KEMENTRIAN AGAMA PROVINSI NTB
LOKASI : JALAN UDAYANA N0. 6 MATARAM
TAHUN ANGGARAN : 2012
KUKUH SUGIARTO,ST.
Direktur
SCHEDULE BAHAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR NEGARA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR WILAYAH KEMENTRIAN AGAMA PROVINSI NTB
LOKASI : JALAN UDAYANA N0. 6 MATARAM
TAHUN ANGGARAN : 2012
1 Kepala tukang OH
4 Mandor OH
6 Pekerja OH
7 Tukang kayu OH
8 Tukang batu OH
9 Tukang cat OH
MINGGU KE-
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
KUKUH SUGIARTO,ST.
Direktur
PT. DAMAI INDAH UTAMA
SCHEDULE ALAT
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR NEGARA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR WILAYAH KEMENTRIAN AGAMA PROVINSI NTB
LOKASI : JALAN UDAYANA N0. 6 MATARAM
TAHUN ANGGARAN : 2012
MINGGU KE-
NO JENIS PEKERJAAN VOLUME SAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Matar
PT. DAM
KUKU
MINGGU KE-
19 20 21 3 hari
1 1 1
2 2 2
KUKUH SUGIARTO,ST.
Direktur