METHOD STATEMENT / WORK PROCEDURE

OF ESCALATOR INSTALLATION
PROJECT : DASWIN OFFICE TOWER, JAKARTA

DESCRIPTION PROCEDURE SAFETY

START

1 Prepare The Tools and Equipment ;


1 Chain Block 1 The Worker Must know about Safety (Tool, Material
2 Hand Pallet and Location)
PREPARATION
3 Wire ropes
4 Pipes
5 Keys
6 Jack rods

2 Install Baseplate 1 As a safety measure Against falling, use safety belt


INSTALL 1 Draw the truss centerline to decide the direction of the 2 Check all tool before using
BASEPLATE entrance or exit 3 Install Safety fence
2 Set and Install Base plate to the marking of centerline 4 Be Carefull with Electric Current
and levelness 5 When Welding Process, the Worker prepare Fire
Extinguisher

3 Joint, Hoisting and Centering Truss 1 Install Safety fence


JOINT, HOISTING 1 Joint the bottom and top of truss 2 Be Carefull, the Worker must keep the material and
AND CENTERING
TRUSS 2 Hoist the truss tool, don’t pull down
3 Install of centering column or piano wire 3 The worker must wear helm safety helm and Safety
4 Center the truss belt

SET AND INSTALL 4 Set and Install Balustrade and Glass Holder The worker must wear helm safety helm and Safety
BALUSTRADE AND 1 Set and install the balustrade belt
GLASS HOLDER
2 Set and install the glass above the glass holder

5 Set and Install Moving Hand Rail


1 Centering for return hand rail guide The worker must wear helm safety helm and Safety
SET AND INSTALL
MOVING HAND 2 Centering for skirt angle belt
RAIL 3 Install of rubber handrail
4 install of skirt angle

6 Wiring
WIRING
1 Install Safety devices The worker must wear helm safety helm and Safety
2 Install Cable from top until bottom belt
3 Install control panel Be Carefull with Electric Current

7 Set and Install Inner and Outer Deck


SET AND INSTALL
INNER AND 1 Install the outer deck The worker must wear helm safety helm and Safety
OUTER DECK 2 Install the inner deck belt
3 Install the guard rail

8 Cleaning, Lubrication and Step The worker must wear helm safety helm and Safety
CLEANING,
LUBRICATION 1 Cleaning belt
AND STEP 2 Lubrication
3 Install step

9 Finish
FINISH