Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 20

Lot Detail

Lot No. : 18.04.0000.326.07.17.005


Lot
Description : R/M of Shed No.09

Bill of Quantities

Table
Name : Bill of Quantities

Item Group Item


No. Code Item

1 Part-A White washing

old or new
surface
including
cleaning the
surface by
sand paper but
excluding cost
of scrapping
the smoke
marks, mosses
etc. as per
direction.

2 Part-A Oil bound


distemper
washing two
coats of
approved
colour and
quality including
rubbing the
surface with
sand paper
complete as
per direction.
3 Part-A Cement
washing two
coats with
cement, lime
etc. including
cleaning by
scrapping
properly with
iron brush,
broom brush
etc. complete
as per
direction.

4 Part-A Synthetic
enamel painting
to wooden
surface
including
preparation of
surface

complete as
per
specification
and direction.

4a Part-A Two coats.


5 Part-A Printing or
painting of
letters or
figures up to
610mm size.

6 Part-A Labour for


taking out hard
board, partex,
ablite board of
ceiling or
walling carefully
from wooden
frame and
stacking the
same as per
direction.

7 Part-A 3mm thick hard


board.
8 Part-A Labour for
taking out old
wooden
battens
including
stacking as per
direction.

9 Part-A Garjan,
chapalish,
kacha etc.
(Planned).
10 Part-A Jarul, silkarai,
gammer wood
etc.
11 Part-A Labour for
taking out and
refixing door
and window
leaves with old
and new fittings
as required and
directed.

12 Part-A Supplying and


fitting fixing
3mm thick
glass panes
including bread,
putty, staples
etc. as required
and directed.

13 Part-A Providing putty


round the glass
panes of sizes
as per direction
including
removing old
ones.

14 Part-A Easing MS
crittal doors
and windows
including
welding if
necessary as
per direction.
15 Part-A Scrapping out
and cleaning
moss, old
colour wash,
smoke marks
from wall or
ceiling etc.
complete
(Measurements
to be given for
scrapping area
only).

16 Part-A Carriage of
glass, released
doors,
windows, pipes
and other same
materials etc.
including
loading,
unloading and
carriage to a
selected places
etc. as per
direction.

16b Part-A Up to 2(two)


km by small
truck.
17 Part-A Labour for
cleaning the
septic tank and
removing the
sludge up to a
safe distance
(3.20km) as
per direction.

17a Part-A 100 Users.


18 Part-A Dismantling
brick masonry
in ground floor
in cement
mortar of any
proportion
including
removing
debris to a safe
distance and
scaffolding etc.
complete
(Debris and the
released bricks
to be carried
by head lead).

19 Part-A 1st class brick


work with
cement mortar
in proportion of
(1:4) with
cement and
sand in
foundation and
plinth including
curing etc.
complete as
per direction.

20 Part-A Cement
concrete work
in foundation,
floor etc. in
proportion of
(1:1½:3) with
cement, using
50% local sand
and 50%
Sylhet sand
over 100%
local sand in all
proportion and
Sylhet shingles
or stone chips
including
ramming,
shuttering,
curing etc.
complete as
per direction
(3days curing
for foundation
and 21 days for
floor).
21 Part-A Taking out old
plaster from
wall surface
including
racking out
joints, removing
debris etc.
complete as
per direction.

22 Part-A 13mm thick


plastering work
in floor or wall
in proportion of
(1:4) with
cement and
sand including
rounding
corners, curing,
scaffolding etc.
complete as
per direction.

23 Part-A Taking out GI


ridging or
asbestos/
dadex ridging
of any width
including

stacking as per
direction.

24 Part-A Labour for


taking out CI
sheet roofing
including
stacking the
same as per
direction.

25 Part-A Labour for


taking out J-
hook or L-bolts
from CI sheet
roofing etc.
complete as
per direction.

26 Part-A Labour for 26


BWG
Galvanized
corrugated iron
roofing 152mm
end lap, 2 corr.
side lap with
necessary GI
screws, limpet
washer
including cost
of necessary
GI fittings
complete as
per direction.

27 Part-A Supplying and


fitting fixing GI
plain sheet
valley gutter of
22 BWG sheet
including supply
of screws, nuts
B bolts.

27a Part-A 91cm wide.


28a Part-A 24 BWG
ridging with
305mm lap on
both sides.
28b Part-A 24 BWG
ridging with
229mm lap on
both sides.
29 Part-A Supplying and
fitting fixing J-
hooks/ J-bolts
of standard
sizes including
making hole in
CI sheet,
scaffolding etc.
as per
direction.

30 Part-A Labour for


taking out GI/
MS pipe

including
stacking the
same as per
direction.

30a Part-A 152mm dia.


31 Part-A Supplying and
fitting fixing 22
BWG
galvanized plain
sheet rain
water down
pipe including
preparing the
pipe and fixing
in proper
position
complete as
per direction.

31a Part-A 152mm dia.


32 Part-A Making holes in
gutter B
supplying fitting
fixing nozzle for
connecting
down pipe
complete as
per direction.

33 Part-A Stopping
leakage of CI
sheet roofing
with bituminous
paste as per
direction.

34 Part-A Supplying and


fitting fixing
4mm thick
acrylic sheet at
shed roof
(approved
quality) with
necessary
fittings as per
direction.

35 Part-A Cleaning and


dressing the
site before and
after work
including
leveling,
dressing,
widding out
grass, up-
rooting trees up
to 150mm dia.,
cutting jungles,
bailing out
water,
removing all
refuges etc. to
a safe distance

as per direction
Grand
Total :

Schedule of Day works

Table
Name :

Item
Item Code
no. Group (if
any)

1 Not -
Applicable

Grand
Total :

Unconditional Discount Form

Table Unconditional Discount


Name :

Discount in Percentage (%)[In figDiscount in Percentage (%) [In word,


Unit Total
Unit Price Price Price
Description of Measurement Quantity
Unit In figures (BDT) In In
Words Figures
(BDT) (BDT)
SqM 1,434.00

SqM 46.00
SqM 331.00

SqM 17,961.00
NoS 238.00

SqM 45.00

SqM 45.00
Rm 110.00

CuM 0.15

CuM 0.80

SqM 14.00

SqM 7.00

NoS 40.00

SqM 9.00
SqM 12,667.00

Trip 4.00

Nos 1.00
CuM 38.00
CuM 38.00

CuM 39.00
SqM 470.00

SqM 900.00

RM 1,020.00

SqM 1,275.00

Nos 8,060.00
SqM 1,275.00

RM 400.00
RM 415.00

RM 350.00

Nos 8,060.00

-
RM 132.00
-

RM 132.00
NoS 66.00

Point 8,060.00

SqM 105.00
LS 1.00

Unit
Description Measurement Nominal Unit Price in Figures Price
of Item Unit Quantity (BDT) in
Words
(BDT)
Not Not Applicable 1
Applicable
Total
Price

In
Words
(BDT)
Total Total
Price in Price
Figures in
(BDT) Words
(BDT)

You might also like