Section6 - Bill of Quantities
Section6 - Bill of Quantities
Bill of Quantities
Table
Name : Bill of Quantities
old or new
surface
including
cleaning the
surface by
sand paper but
excluding cost
of scrapping
the smoke
marks, mosses
etc. as per
direction.
4 Part-A Synthetic
enamel painting
to wooden
surface
including
preparation of
surface
complete as
per
specification
and direction.
9 Part-A Garjan,
chapalish,
kacha etc.
(Planned).
10 Part-A Jarul, silkarai,
gammer wood
etc.
11 Part-A Labour for
taking out and
refixing door
and window
leaves with old
and new fittings
as required and
directed.
14 Part-A Easing MS
crittal doors
and windows
including
welding if
necessary as
per direction.
15 Part-A Scrapping out
and cleaning
moss, old
colour wash,
smoke marks
from wall or
ceiling etc.
complete
(Measurements
to be given for
scrapping area
only).
16 Part-A Carriage of
glass, released
doors,
windows, pipes
and other same
materials etc.
including
loading,
unloading and
carriage to a
selected places
etc. as per
direction.
20 Part-A Cement
concrete work
in foundation,
floor etc. in
proportion of
(1:1½:3) with
cement, using
50% local sand
and 50%
Sylhet sand
over 100%
local sand in all
proportion and
Sylhet shingles
or stone chips
including
ramming,
shuttering,
curing etc.
complete as
per direction
(3days curing
for foundation
and 21 days for
floor).
21 Part-A Taking out old
plaster from
wall surface
including
racking out
joints, removing
debris etc.
complete as
per direction.
stacking as per
direction.
including
stacking the
same as per
direction.
33 Part-A Stopping
leakage of CI
sheet roofing
with bituminous
paste as per
direction.
as per direction
Grand
Total :
Table
Name :
Item
Item Code
no. Group (if
any)
1 Not -
Applicable
Grand
Total :
SqM 46.00
SqM 331.00
SqM 17,961.00
NoS 238.00
SqM 45.00
SqM 45.00
Rm 110.00
CuM 0.15
CuM 0.80
SqM 14.00
SqM 7.00
NoS 40.00
SqM 9.00
SqM 12,667.00
Trip 4.00
Nos 1.00
CuM 38.00
CuM 38.00
CuM 39.00
SqM 470.00
SqM 900.00
RM 1,020.00
SqM 1,275.00
Nos 8,060.00
SqM 1,275.00
RM 400.00
RM 415.00
RM 350.00
Nos 8,060.00
-
RM 132.00
-
RM 132.00
NoS 66.00
Point 8,060.00
SqM 105.00
LS 1.00
Unit
Description Measurement Nominal Unit Price in Figures Price
of Item Unit Quantity (BDT) in
Words
(BDT)
Not Not Applicable 1
Applicable
Total
Price
In
Words
(BDT)
Total Total
Price in Price
Figures in
(BDT) Words