Maersk Ultra deepwater

drilling and development

Discoverer semi-submersible

Discoverer.indd 1 19-09-2014 09:04:48


Discoverer.indd 4 19-09-2014 09:04:48
Maersk Drilling Maersk Discoverer

Maersk
Discoverer
TYPE Maersk Drilling is a considerable player in the ultra deepwater
DPS2/M, Column stabilised dynamically positioned semi- market with four newly built drillships and three Ultra
submersible drilling rig with capability to attach to an 8-point Deepwater Development semi-submersibles.
pre-installed mooring system; provisions to attach to a
12-point pre-installed mooring system The three semi-subs are DP rigs designed for year-round
operation in areas such as Brazil, the Gulf of Mexico, West
BUILT Africa and Asia pacific at water depths up to 3,000 m
KeppelFELS, Singapore , 2009 (10,000 ft).

CLASS
American Bureau of Shipping

FLAG
Singapore

Main advantages
• Exploratory, appraisal and development drilling • Large 5-chair driller’s cabin with automated sequenced
pipe handling operations
• Batch drilling and completion of multiple well clusters
• Automated and dust-free bulk, mud and chemical transfer
• Installation of subsea facility components and mixing systems

• Derrick – 1,361 t (3,000,000 lbs) combined load rating • Hydraulic work baskets and service platforms providing
Max. 2,500,000 lbs single load rating safe access for servicing of major drilling equipment

• Main hoisting system – 910 t (2,000,000 lbs) capacity • Deck drainage, containment and treatment systems for
controlled discharge
• Auxiliary hoisting system – 680 t (1,500,000 lbs) capacity

• Large heave compensated knuckle-boom crane (165 t lift


capacity from deck to deck) with winch for deployment of
subsea trees and other components up to 100 t over the
side of the rig to 3,000 m water depth

Discoverer.indd 2 19-09-2014 09:04:48


Discoverer.indd 4 19-09-2014 09:22:26
Maersk Drilling Maersk Discoverer

Main particulars

DIMENSIONS IMPERIAL METRIC


Length overall 384 ft 117 m
Width overall 256 ft 78 m
Length of pontoons 376 ft 115 m
Pontoon (width / height) 57 ft / 33 ft 18 m / 10 m
Columns 55 ft x 57 ft 17 m x 18 m
Upper hull (length / width) 259 ft / 258 ft 78.5 m / 78 m
Moonpool opening 108.3 ft x 29.5 ft 33 m x 9 m
Draft operational (max / min) 67.3 ft / 60.7 ft 20.5 m / 18.5 m
Draft transit 31.8 ft 9.7 m

PARTICULARS IMPERIAL METRIC


Rated drilling depth 40,000 ft 12,000 m
Hook load static (main) 2,500,000 lbs 1,134 t
Hook load static (aux) 1,500,000 lbs 680 t
Rotary load static (main) 2,756,000 lbs 1,250 t
Rotary load static (aux) 2,000,000 lbs 907 t
Setback load 2,646,000 lbs 1,200 t
Variable deck load (max / transit) 15,400,000 lbs / 10,120,000 lbs 7,000 t / 4,600 t
Variable column load (max / transit) 3,300,000 lbs / 880,000 lbs 1,500 / 400 t
Variable pontoon load (max / transit) 11,000,000 lbs / 4,400,000 lbs 5,000 t / 2,000 t
Total payload (max / transit) 29,900,000 lbs / 15,400,000 lbs 13,500 t / 7,000 t
Riser tensioner load 4,200,000 lbs 1,906 t
Pipe rack area 10,765 ft2 1,000 m2

WEATHER/DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC


Water depth (moored in less than 1,640 ft / 500 m) 328 ft – 10,000 ft 100 m – 3,000 m
Wind speed 56 knots 29 m/sec
Wave height (Hs) 26.2 ft 8m
Wave period 12.3 s 12.3 s
Current (surface) 1.7 knots 0.9 m/sec

CAPACITIES IMPERIAL METRIC


Drill water 12,580 bbl 2,000 m³
Potable water 5,032 bbl 800 m³
Fuel oil 25,160 bbl 4,000 m³
Brine 4,718 bbl 750 m³
Base oil 4,718 bbl 750 m³
Liquid mud (surface pits) 9,435 bbl 1,500 m³
Liquid mud (pontoons) 9,435 bbl 1,500 m³
Bulk mud 24,000 ft³ 680 m³
Bulk cement 24,000 ft³ 680 m³
Sack material 2,160 ft³ 200 m³
Accommodation 180 people 180 people

Derrick rated for US GOM category 4 hurricane

Discoverer.indd 3 19-09-2014 09:04:48


Maersk Drilling Maersk Discoverer

Key features
CROWN MOUNTED COMPENSATION WELL CONTROL EQUIPMENT
Main rotary: static / compensating load 2,500,000 lbs  / 18 ¾” BOP – 15,000 psi equipped with two annular + six ram
1,000,000 lbs (1,134 t / 454 t). Hydraulic locking with preventers. The lower ram can be configured as a test ram.
25 ft stroke. Auxiliary rotary: static / compensating load Multiplex BOP control system; redundancy to allow both
1,500,000 lbs / 750,000 lbs (680 t / 340 t). Hydraulic locking pods to operate with one MUX cable. 60 ½” diverter system
with 25 ft stroke. Active heave compensation mode and riser gas handler, choke & kill manifold, 15,000 psi and
available. mud gas separator, 12 MMscfd.

DERRICK AND HOISTING SYSTEMS HP MUD SYSTEM


Rated drilling depth capacity 30, 000 ft. MAIN side equipped Four 2,200 hp mud pumps rated for 7,500 psi.
with hoisting System capable of 2,500,000 lbs static hook
load. Drawworks: 6,000 hp. Top drive: 2,000,000 lbs capacity. MUD RETURN SYSTEM
Rotary: 60 ½”. AUX side equipped with hoisting System System design to minimise time displacing mud system  /
capable of 1,500,000 lbs hook load. Drawworks: 4,500 hp completion fluids and capable of handling more than one
Top Drive: 1,500,000 lbs capacity. Rotary: 60 ½”. mud system. Provisions for centrifuge and cuttings dryer
installation. Completion fluid capability. Eight shale shakers.
TUBULAR HANDLING SYSTEMS Cuttings blower system.
Primary mover is one pipehandling knuckle-boom crane
feeding two horizontal pipe conveyor / skate systems. Two MUD AND BULK SYSTEM
V-door stand-building and tripping machines. Two column Fitted with two automatic sack cutting machines in sack
rackers for pipe handling and two iron roughnecks. Offline store and one bigbag machine: One dual liquid additive
casing make-up capability drill string / casing vertical pump unit. Four surge tank outlet feeders, four automatic
setback designed for 3” – 16”. Tubulars racked in nominal mud mixing hoppers, one caustic mixing unit. Two HP mud
135 ft stand lengths. Marine riser vertical storage for 126 ea. shearing devices.
75 ft of riser joints. Total 9,450 ft plus two telescoping joints;
additional storage area for drilling riser on deck. PROVISIONS FOR 3RD PARTY EQUIPMENT
Designed for two large work class ROV systems
DRILL STRING AND TUBULARS (Oceaneering Millenium +) port forward and starboard aft for
In excess of 50,000 ft setback capability for drill pipe, work flexibility of operation. Diesel cementing unit (Schlumberger).
string and casing running string, capable of racking 25,000 ft Staging area for subsea completion equipment, including
of 6 ⅝” drill pipe. Approximately 15,000 ft of 9 ⅝” casing subsea tree transport system. Completion equipment,
racking capacity in addition to drill string. including well test equipment and coil tubing. Dedicated
control rooms, store rooms and offices for 3rd party system
MARINE RISER AND TENSIONING SYSTEMS operators.
Clip riser with two 15,000 psi choke & kill lines, one 7,500 psi
booster line, two hydraulic conduit lines total 10,000 ft of POWER SYSTEMS
riser, 75 ft length joints and 21” OD Riser tensioning system 8 generators x 4,800 kw(e), 11 kVAC, 60 Hz, divided into two
consisting of 6 x 700,000 lbs N-line cylinder riser tensioners. self-contained power plants. Power Distribution System:
Tripsaver system to allow movement of BOP and riser to wet 690 VAC, 60 Hz IT. One emergency generator: 1,500 kW(e).
storage position.
POSITIONING SYSTEMS
BOP AND SUBSEA TREE HANDLING SYSTEMS DP Class 2: power management system and position,
At port side of the main deck: BOP overhead (gantry type) reference systems to DP Class 3. Azimuthing thrusters
crane: 2 x 125 t. In the moonpool: BOP transporter: 400 t. 8  x 4,000 kW(e) of min. 700 kN static thrust each. Optional
Subsea tree overhead crane installed underneath drill floor + moored operation: four double drum windlasses for 3.”
subsea tree staging and skidding system. Subsea tree cart K4 chains, 8 x 600 m K-4 chain for attachment to a pre-
underhull guide systems each rotary. installed. Space for additional windlasses and chain for
12-point mooring system.

Discoverer.indd 5 19-09-2014 09:04:48


Maersk Drilling Maersk Discoverer

CRANES
Port deck crane: Knuckle-boom crane with 3,000 m, 3” wire
for deployment of subsea trees and other modules up to
100 t heave compensated over the side of the rig. 165 t lift
capability from supply boat. Auxiliary whipline hoist 15 t SWL
@ 50 m. Starboard deck crane: 50 m max. reach, SWL 60 t @
20 m dynamic. One pipehandling knuckle-boom crane: 30 m
max. reach, SWL 12 t @ 10 m.

HELICOPTER DECK
Helicopter deck suitable for an EH101 helicopter or Sikorsky
S61.

SAFETY EQUIPMENT
Lifesaving and firefighting equipment in accordance with
Singapore flag state requirements and the IMO MODU code
2001. The rig holds a vessel specific safety case which has
been approved by HSE UK.

ACCOMMODATION
Accommodation for 180 people in 10 one-man rooms and 85
two-men rooms. Ample office spaces and conference rooms
for clients and 3rd party service contractors. Recreation
rooms, total area of 270 m2.

Discoverer.indd 6 19-09-2014 09:04:49


Discoverer.indd 5 19-09-2014 09:22:27
Maersk Drilling Maersk Discoverer

Drilling features
The rig includes a number of innovative features, which enhance the capacity and flexibility for
multiple concurrent activities and improve the drilling efficiency. Back-up facilities and solutions
are generally provided to reduce the impact of equipment failures.

Rig Floor Moonpool


FLEXIBILITY FOR MULTIPLE ACTIVITIES LARGE MOONPOOL;
• Two hoisting / rotary systems FLEXIBILITY FOR MULTIPLE ACTIVITIES
• Large setback area for drill pipe, casing and completion • N-Line riser tensioner system with tripsaver
riser outside of derrick / drillfloor • Transfer of equipment across the moonpool
• Offline pipe handling capability : standbuilding, casing • Dedicated off-line ‘wet parking’ position for BOP / drilling
make-up and rack back riser
• Transfer of drill string, casing and riser from outside of • BOP handling area (starboard side)
derrick / drillfloor • Subsea tree staging area (port side)

OPTIMUM LAYOUT FOR SUBSEA COMPLETION


• Capability for large umbilical and services (tubing hanger
running tool or subsurface test tree)
• Additional space for small umbilicals for completion
accessories

Optimised layout
The hull design and layout are based on the operational experience of various deepwater operators
and third party system suppliers and incorporate a number of innovative ideas from our potential
customers. Great emphasis has been made on optimising the rig’s layout to facilitate flexibili­t y in
installation and operation of third party equipment.

Subsea completions Logistics


FLEXIBLE SYSTEM FOR MAXIMUM USUABLE DECK SPACE FOR OPTIMUM
MULTIPLE WELL SUBSEA DEVELOPMENTS LAYOUT OF DRILLING AND COMPLETION EQUIPMENT
• Option to deploy equipment through the main well centre • 9,600 ft (2,926 m) vertical riser storage
or over the side by large knuckle-boom crane • Large vertical drill pipe and casing setback area
• Large staging area for multiple subsea trees and • Large pipe rack area (aft) for deepwater completion
accessories equipment layout
• Flexibility in subsea tree handling area for various subsea • Well test equipment
system designs • Tubing / downhole tools
• High load capacity for flatbed transporter and tree cart • Completion riser accessories
• High vertical clearance in moonpool for subsea system • Completion fluids / filtration
stack-up and transport • Stimulation
• Coil tubing
• Primary ROV within upper hull ; 2nd ROV location on aft deck

Discoverer.indd 7 19-09-2014 09:04:49


Maersk Drilling Maersk Discoverer

Drilling features
TOP VIEW AND DRILL FLOOR

TANK TOP

Discoverer.indd 8 19-09-2014 09:04:53


Maersk Drilling Maersk Discoverer

SIDE VIEW

Discoverer.indd 9 19-09-2014 09:05:10


October 2014

Head office:

Maersk Drilling Follow us to learn more


50, Esplanaden  www.maerskdrilling.com
1098 Copenhagen K
 www.facebook.com/MaerskDrilling
Denmark
 www.linkedin.com/company/maerskdrilling
Telephone: +45 3363 3363  www.twitter.com/maerskdrilling
Telefax: +45 3363 3182  www.vimeo.com/maerskdrilling

E-mail: copenhagen@maerskdrilling.com  www.youtube.com/user/Maerskcom


www.maerskdrilling.com  www.instagram.com/maerskdrilling

“DISCLAIMER: This brochure is for promotional purposes only. All descriptions, specifications and other information contained in this brochure and/or in any accompanying material is: (i) intended to give only a general indication of the sorts
of service or equipment or performance that might be available (ii) intended to be no more than an invitation to treat (iii) subject to contract and possible change or alteration at our discretion and without notice to you (iv) not to be relied
upon by you for any purposes whatsoever when entering into any legally binding agreement with us.”

Discoverer.indd 10 19-09-2014 09:05:13

You might also like