Professional Documents
Culture Documents
Issued Work Permits 14 - 08
Issued Work Permits 14 - 08
Issued Work Permits 14 - 08
DATE PERMIT TYPE LOCATION DESCRIPTION OF WORK SPECIAL ADVISORY NOTE REMARKS
14/08/18 COLD UTILITY CABLE LAYING/LIGHT FITTING/ USE PROPER PPE’S PERMIT
TRAY INSTALLATION (HOLD) INITIATED BY TPL
14/08/18 COLD UTILITY INSULATION WORK BY LIJAN USE PROPER PPE’S PERMIT
(Chimney) INITIATED BY TPL
SCAFFOLDING REMOVAL WORK PERMIT
14/08/18 COLD UTILITY NEAR UTILITY AND TANK 205 USE PROPER PPE’S INITIATED BY TPL
(HOLD)
MTL -003A AND GSL -001 PUMP PERMIT
14/08/18 COLD PUMP HOUSE LEAKAGE CHECKING AND USE PROPER PPE’S INITIATED BY TPL
RECTIFICATION
14/08/18 COLD ADMIN INTERIOR PAINTING & DRILLING BY USE PROPER PPE & ELECTRICAL PERMIT
ALPHA DECORATOR AND EXTEERIOR CONNECTION INITIATED BY HIF
WORK IN GROUND FLOOR