Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ECE 4501 Power Systems Laboratory Manual Rev 1.

4.1.4 PROCEDURE

CAUTION! – High voltages are present in this Experiment. DO NOT make any
connections with the power supply ON. Get in the habit of turning OFF the power supply
after every measurement.

1) Examine the construction of the Transformer Module, EMS 8341, paying particular attention
to the laminated steel core and the three windings.

2) List the rated voltage for each of the three windings, list the rated voltage between each of the
identified connection terminals, and list the rated current for each of the listed connections:

Rated Voltage for Each Rated Voltage Between Rated Current Between
Winding: Connections: Connections:

Terminals 1 to 2: Terminals 3 to 7: Terminals 1 to 2:


_______ V rms _______ V rms _______ A rms

Terminals 3 to 4: Terminals 7 to 8: Terminals 3 to 4:


_______ V rms _______ V rms _______ A rms

Terminals 5 to 6: Terminals 8 to 4: Terminals 5 to 6:


_______ V rms _______ V rms _______ A rms

Terminals 3 to 8: Terminals 3 to 7:
_______ V rms _______ A rms

Terminals 7 to 4: Terminals 8 to 4:
_______ V rms _______ A rms

Terminals 5 to 9:
_______ V rms

Terminals 9 to 6:
_______ V rms

You might also like