Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

REPUBLIC OF THE PHILIPPINES

TABLE OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL
OF
CONTENTS
DISTRICT/CITY/MUNICIPALITY

ARCHITECTURAL LAND USE & ZONING


A-1 PERSPECTIVE VIEW & TABLE OF CONTENTS

A-2 GROUND FLOOR PLAN SECOND FLOOR PLAN

A-3 REFLECTED CEILING PLAN CROSS SECTION


RIGHT SIDE ELEVATION

A-4 SCHED. OF DOORS & WINDOWS RAMP


DETAILS, EAVES DETAIL, SUN BREAKER
DETAIL DAMP PROOFING DETAIL, BALCONY
RAILING DET.
LINE & GRADE
A-5 ROOF PLAN, LONGITUDINAL SECTION
A-6 FRONT ELEV., REAR ELEV.
A-7 STAIR & HANDRAIL DETAILS

A-8 TOILET DETAILS

ARCHITECTURAL

STRUCTURAL
S-1 FOUNDATION PLAN, 2ND FLOOR FRAMING
PLAN
ROOF DECK FRAMING PLAN
STRUCTURAL
S-2
SCHEDULE OF SLAB

S-3 DET. STAIR ON GRADE, RAMP & STAIR


DET. OF FOOTING, TIE BEAM & COLUMN

S-4 TRUSS DIAGRAM, SCHEDULE OF


1 PERSPECTIVE VIEW BEAM DETAILS OF STEEL
CONNECTION
A-1 SCALE : N T S

SANITARY

ELECTRICAL
E-1 GENERAL NOTES, LEGEND, LOAD
SCHEDULE, RISER DIAGRAM, SINLE
DIAGRAM

E-2 POWER LAYOUT (GROUND & SECOND


FLOOR)
E-3 LIGHTING LAYOUT (GROUND & SECOND
FLOOR) ELECTRICAL

SANITARY
P-1 SEWER SYSTEM LAYOUT, LEGEND,
DESIGN CRITERIA, NOTES

P-2 WATER & DRAINAGE SYSTEM LAYOUT,


SEPTIC TANK, CATCH BASIN, DRAIN PIT,
& LEACHING FIELD DETAILS MECHANICAL

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-1


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
PERSPECTIVE VIEW, TABLE OF CONTENTS
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 11
4500 9000 4500 600
CONCRETE
4500 4500 SUNBREAKER (SEE
CONCRETE SUNBREAKER
DETAIL)
1
A-3

675
A WF1
WF1 W-1
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1

LANDING
17
WF1 WF1 WF1 WF1
16 18

15 19
dn.
14 CLASSROOM CLASSROOM CLASSROOM CLASSROOM DN.
7000

13

12 5
11

10
FL1 FL1 FL1 FL1
9

CHALKBOARD

CHALKBOARD

CHALKBOARD

CHALKBOARD

CHALKBOARD

CHALKBOARD

CHALKBOARD

CHALKBOARD
6
WF1 WF1 WF1 WF1
5

3
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2
2 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1

B 1

25mm 25mm 25mm 25mm 25mm 25mm 25mm 25mm


DEP. DEP. DEP. DEP. DEP. DEP. DEP. DEP.
2500

FL1 FL1 FL1 FL1


C O R R I D O R C O R R I D O R

C
FD FD

2 SECOND FLOOR PLAN


A-2 SCALE : 1 : 100M

CONCRETE

1 2 3 4 11
SUNBREAKER

200x200mm VITRIFIED
FLOOR TILES (UNGLAZED) 9000 4500
4500 1 4500 4500 600 2000 250 1500
1500 2250 600 A-5
200x200mm VITRIFIED
UNGLAZED FLOOR TILES
W-3
SCHEDULE OF FINISH
675

W-3

A SLOP
900

900
D-4 SINK
UD
D-4 FLOORS :
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
SHE HE
900

D-4 FL1 - PLAIN CEMENT FLOOR FINISH

1500
SD 2
FL3 FL3
D-3 A-3
WF1
D-3
1500

SINK COUNTER

FL2 - PLAIN CEMENT FLOOR ROUGH


7000

D-5 WITH GROOVES


CLASSROOM CLASSROOM CLASSROOM CLASSROOM

SINK COUNTER
STO. D-5 STO.
1
FL3 - 200X200 VITRIFIED FLR TILES

4450
FL1 FL1 FL1 FL1 ( UNGLAZED )
3300

WF1 WF1 WF1 WF1


D-2 D-2
WALLS :
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1

B UP
WF1 - 150 MM THK. CHB W/ PLAIN
CEMENT PLASTER FIN (PAINT)
25mm 25mm 25mm 25mm 25mm 25mm 25mm 25mm
DEP. DEP. DEP. DEP. DEP. DEP. DEP. DEP.
UP
2500

2103 2397
FL1 FL1 FL1 FL1
C O R R I D O R C O R R I D O R WF2 - 150mm THK. CHB w/200X200mm
VITRIFIED WALL TILES ( GLAZED )
C
1475

RAMP UP UP RAMP WF3 - 100mm THK. CHB PLAIN CEMENT


UP UP PLASTER w/50mmØ G.I. PIPE
HANDRAIL PAINT FIN.
5150 6
A-6
- 100mm THK. CHB w/200X200mm
WF4
VITRIFIED WALL TILES ( GLAZED )
1 GROUND FLOOR PLAN
A-2 SCALE : 1 : 100M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-2


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY GROUND FLOOR PLAN
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p SECOND FLOOR PLAN

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11
9000 9000 9000 9000

600 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600
1000

A
LIGHTING FIXTURE

6mm THK. ORD PLYWOOD CEILING


w/6mm GROOVE ON 50x50mm CLEILING
JOISTS (PAINT FIN.)
7000

b
6mm THK. MARINE PLYWOOD CEILING
w/GROOVE ON 50x50mm CEILING JOISTS
2500

(PAINT FIN.)

CEILING VENT. (SEE DETAIL)

c
1000

GA.26 PLAIN G.I. GUTTER ON


12x300mm THK. FIBER
CEMENT FASCIA BOARD

A-6

1 SECOND FLOOR REFLECTED CEILING PLAN


A-3 SCALE : 1 : 100M

A B C
9500
C B A A B C
1000 7000 2500 1000
9500 9500
TOP OF TRUSS 1000 2500 7000 1000 1000 7000 2500 1000

APEX LINE OF TRUSS APEX LINE OF TRUSS


GA. 26 CORR. G.I. SHEET GA. 26 CORR. G.I.
2500

ROOFING (PAINT FINISH) SHEET ROOFING


(PAINT FINISH)
2500

2500
SEE TRUSS DETAIL

TOP OF ROOF BEAM


538

TOP OF ROOF BEAM GA. 26 PLAIN G.I. SHEET TOP OF ROOF BEAM GA. 26 PLAIN G.I. SHEET
GUTTER ON 12x300mm GUTTER ON 12x300mm
FIBER CEMENT FASCIA FIBER CEMENT FASCIA
BOARD (PAINT FINISH)
3200

BOARD (PAINT FINISH)


3
W-1 W-2
3200

3200
A-3
150mm THK. CHB PLAIN
SECOND FLOOR LEVEL CLASSROOM 3 PLASTER PAINT FIN.
150mm THK. CHB
6725

CORRIDOR

SECOND FLR. LVL. SECOND FLR. LVL. PLAIN PLASTER


6725

6725
CONCRETE SUNBREAKER (SEE PAINT FIN.
50mm GA# 40
DETAIL)
G.I. PIPE
3200

HANDRAIL
3 32mm Ø G.I. PIPE
W-1 W-2
3200

3200
A-3 HANDRAIL WITH 32mmØ
150mm THK. CHB WALL 32mm Ø G.I. PIPE VERT. SUPPORT @300mm
HANDRAIL WITH 32mmØ O.C. (PAINT FINISH)
GROUND FLOOR LEVEL
CLASSROOM 1 PLASTER PAINT FIN.
VERT. SUPPORT @300mm
325

FIN. GRD. LN. GROUND FLR. LVL. O.C. (PAINT FINISH) GROUND FLR. LVL.
325

325
EXPOSE CEILING NAT. GRD. LN. NAT. GRD. LN.
UNDERSLAB PAINT FINISH
1 CROSS SECTION 1 RIGHT SIDE ELEVATION 4 LEFT SIDE ELEVATION
A-3 SCALE : 1 : 100M
A-3 SCALE : 1 : 100M
A-3 SCALE : 1 : 100M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-3


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY REFLECTED CEILING PLAN, CROSS SECTION & RIGHT SIDE
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
ELEVATION
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 7
4 5 6 7 8 11
9000 9000 9000

600 4500 4500 4500 4500 4500 4500 4500 4500 600
APEX LINE OF TRUSS
GA. 26 CORR. G.I.
SHEET ROOFING
(PAINT FINISH)
2500

GA#26 G.I. SHEET CORR. ROOFING


PAINT FIN.
GA. 26 PLAIN G.I.
GUTTER ON
TOP OF ROOF BEAM
12x300mm FIBER
CEMENT FASCIA BD.
(PAINT FINISH)
3200

100mm THK. CHB w/ 50mmØ


G.I. PIPE HANDRAIL PAINT W-1 W-1
FIN. (SEE DETAIL)

D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 100 MM THK. CHB
SECOND FLOOR LEVEL
6725

RAILING W/50mm Ø
G.I. PIPE RAILING

32mm Ø G.I. PIPE


3200

32mmØ G.I. PIPE GRAB BAR


w/32mmØ G.I. PIPE RAILING D-2 D-2 HANDRAIL WITH 32mmØ
@300mm O.C. VERT. SUPPORT @
300mm O.C. (PAINT
FINISH)
D-1 W-2 W-2 D-1 W-2 W-2 D-1 D-1 W-2 W-2
D-1 D-1
GROUND FLOOR LEVEL
325

NAT. GRD. LN.

1 FRONT ELEVATION
A-4 SCALE : 1 : 100M

10 9 8 7 6 5 4 3 2 1
9000
4500 4500 4500 600

APEX LINE OF TRUSS

2500
TOP OF ROOF BEAM

3200
W-1 W-1 W-1
SECOND FLOOR LEVEL

6725
3200
W-3

W-1 W-1
GROUND FLOOR LEVEL

325
NAT. GRD. LN.

2 REAR ELEVATION
A-4 SCALE : 1 : 100M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-4


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY FRONT ELEV. REAR ELEV.
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11
9000 9000 9000 9000 GA. 26 PL. G.I. SHT. GUTTER
ON 12x300mm FIBER
600 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600
CEMENT FASCIA BD. PAINT
FIN.

RD RD RD RD RD RD

1000
GA. 26 CORR. G.I. SHEET
ROOFING PAINT FIN.
A
GA. 26 PL. G.I. SHT.
FLASHING ON 12x300mm
FIBER CEMENT FASCIA
BOARD PAINT FIN.
7000

GA. 26 PL. G.I. SHT. RIDGE


ROLL PAINT FIN.
11500

B
2500

C
1000

LN. OF STRUCTURE

RD RD RD RD RD RD

1 ROOF PLAN
A-3 SCALE : 1 : 100M

1 2 3 4 5 6 7 8 9 10 11
9000 9000 9000 9000
600 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600

APEX OF TRUSS
2500

THIRD FLOOR LEVEL


3200
10200

W-1 W-1 CLASSROOM 5 W-1 W-1 CLASSROOM 6 W-1 W-1 CLASSROOM 7 W-1 W-1 CLASSROOM 8 W-1 W-1
SECOND FLOOR LEVEL
LANDING LANDING

W-3
W-3
3200

SHE W-1 CLASSROOM 1 W-1 W-1 CLASSROOM 2 W-1 W-1 CLASSROOM 3 W-1 W-1 CLASSROOM 4 W-1 HE
GROUND FLOOR LEVEL
325

NAT. GRD. LN.

EXPOSED UNDER SLAB CEILING


PAINT FINISH

2 LONGITUDINAL SECTION
SCALE : 1 : 100M
A-3

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-5


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY ROOF PLAN
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p LONGITUDINAL SECTION

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1000 900 900 600 700 4 EQUAL PARTS = 2500 2 EQUAL PARTS = 1225 4 EQUAL PARTS = 2500
750

7-BLADES
260
14-BLADES 260
300

±635
14-BLADES
±1240

±1240
2400
2400

2400

2400
STAINLESS
2100

2100
STEEL KICKING

(VAR)
1200

1800

1765
PLATE

1500

1500

900
900
300

300
FFL FFL

CLASSROOM TOILET TOILET (DISABLED) TOILET (CUBICLE) STO.

TANGUILE PANEL DOOR ON 50X150 MM HOLLOW CORE FLUSH TYPE SWING LOUVER TYPE DOUBLE SWING DOOR SWING DOOR ON 50X100 HOLLOW CORE FLUSH TYPE SWING DOOR JALOUSIE WINDOWS WITH CLEAR GLASS JALOUSIE WINDOWS WITH CLEAR GLASS JALOUSIE WINDOWS WITH CLEAR GLASS
D-1 THK. YACAL/GUIJO JAMB W/ FIXED D-2 DOOR W/ MARINE PLYWOOD FACING D-3 COMPLETE W/ HARDWARES AND D-5 YACAL/GUIJO DOOR JAMB D-4 ORDINARY COMPLETE W/ HARDWARES BLADES ON STANDARD ALUMINUM CASING BLADES ON STANDARD ALUMINUM CASING BLADES ON STANDARD ALUMINUM
CLEAR GLASS TRANSOM COMPLETE INSIDE AND ORDINARY OUTSIDE ACCESSORIES PROVIDE KICK PLATE COMPLETE WITH HARDWARES AND ACCESSORIES W-1 AND FIXED CLEAR GLASS TRANSOM ON W-2 AND FIXED CLEAR GLASS TRANSOM ON W-3 CASING ON 50X150 YACAL/GUIJO JAMB
WITH HARDWARES AND ACCESSORIES COMPLETE W/ HARDWARES AND ACCESSORIES 50X150 YACAL/GUIJO JAMB COMPLETE WITH 50X150 YACAL/GUIJO JAMB COMPLETE WITH COMPLETE WITH HARDWARES AND
ACCESSORIES HARDWARES AND ACCESSORIES HARDWARES AND ACCESSORIES ACCESSORIES
1 DOORS & WINDOWS SCHEDULE
CONCRETE HOLLOW GA#26 CORR. G.I. ROOFING
BLOCKS A-6 SCALE : 1 : 50M
SHT. PAINT FIN.
CONCRETE SLAB 1000
6mm THK. MARINE PLYWOOD
POLYETHYLENE SHEET DAMP PROOFING TOP CHORD SEE STRUCTURAL DETAIL CEILING ON 50x50mm CEILING
GRAVEL BEDDING JOIST @600mm BW
38mmØ TEKSCREW 38mmØ TEKSCREW
C-PURLIN (SEE STRUC'L DETAIL)

200
2-32mmØ G.I. PIPE HANDRAIL GA#26 GI STRAP
w/32mmØ VERT. SUPPORT COPPER RIVET
@300mm OC (PAINT FIN.) SAG ROD SEE STRUCTURAL DETAIL
12x300mm FIBER CEMENT FASCIA
BOARD FIX W/METAL SCREW ON STL.
6mm THK. MARINE PLYWOOD CEILING ON
6 DAMP PROOFING DET. 50x50mm CEILING JOIST @600mm BW
FRAME PAINT FINISH

900
GA#26 GI GUTTER PAINT FIN.
6mm THK. ORD. GA#26 GI STRAP
A-6 NOT TO SCALE
2 12mMØ STEEL DOWEL PLYWOOD CEILING W/ ROOF

700
20x20X2mm ANGULAR BAR FOR
EMBEDD IN CONC. 6mm GROOVE ON 2A
BEAM GA#26 G.I. GUTTER ON 12x300mm FIBER
A-4 A-1
FASCIA BOARD FRAME COATED
NON-SKID PLAIN CEMENT 50x50mm CEILING JOIST CEMENT FASCIA BOARD PAINT FIN. WITH PRIMER
2-32mmØ G.I. PIPE HANDRAIL
FLOOR FIN. w/ GROOVE @600mm BW (PAINT
w/32mmØ VERT. SUPPORT @300mm
LINES FIN.) BASKET STRAINER
O.C.(PAINT FIN.)

100
BASKET STRAINER

NON-SKID PLAIN CEMENT


FLOOR FINISH 2A 75mmØ PVC DOWNSPOUT PAINT FINISH
w/GROOVE LINES
700 200

A-1
CEILING VENT (SEE DETAIL) 75mmØ PVC
DOWNSPOUT PAINT
700 200

DETAIL SECTION SECTION DETAIL (EAVES)


900

FINISH
1200

2A 7
900

A-6 SCALE : 1 : 10M


A-6 SCALE : 1 : 10M 8 SPOT DETAIL (EAVES)
300

A-6 SCALE : 1 : 10M

SEE TRUSS DET.


3 DET. ELEVATION OF RAMP 2000

A-6 SCALE 1:50 M


100X100 CONCRETE

5 6 SKIRTING

9000

6mm THK. ORD. PLYWD.


100

32 mm Ø G.I PIPE VERTICAL CEILING (PAINT) ON


150

SUPPORT @ 300mm ON CENTER 50x50mm CLG. JST. CONC. BEAM


PROVIDE 12mmØ STEEL DOWELS @600mm OC BW
(PAINT FIN.)
B
10mmØ @250mm ON
6mm THK. MARINE CENTER

SPOT DETAIL
FR. QUARTER-C
PLYWD. CEILING
2A MOULDING CEILING

100
(PAINT) ON 50x50mm
CONTACT TO CONC.
5000

CLG. JST. @600mm OC


CORRIDOR WALL
A-6 SCALE : 1 : 5M
BW

SPOT DETAIL (CORNER CLG.)

100
9
2400

11
A-6 SCALE : 1 : 10M
12x12mm GROOVE
25x25mm WOOD VENT.
C
A-6
FR. 25x75mm WOOD PROVIDE INSECT SCREEN BEAM REBARS SEE
175

FRAMEPAINT FIN. STRUCTURAL DETAIL


50 12 325 12 50

675
2800
1400

RAMP UP
300

A-4

3600
12 CONCRETE SUNBREAKER DET.
NON-SKID PLAIN
CEMENT FLOOR
5150
1175 6 25 300
A-6 SCALE : 1 : 10M

FINISH w/GROOVE TOTAL RUN OF RAMP 6mm THK PLYWOOD CEILING


32mmØ G.I. PIPE HANDRAIL 25x25mm WOOD VENT FR.25x75mm
LINES ON 50x50mm CEILING JOIST
4
w/32mmØ VERT. SUPPORT PROVIDE INSECT SCREEN VENT FRAME
(PAINT FIN.) @600mm OC. BW (PAINT FIN.)
@300mm O.C. (PAINT FIN.)
DETAIL PLAN (VENT.)
A-4

10
2 DET. PLAN OF RAMP 11 SECTION DEATIL (VENT.)
A-6 SCALE : 1 : 10M

A-6 SCALE : 1 : 5M
A-6 SCALE : 1 : 50M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-6


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY SCHED. OF DOORS & WINDOWS
AL
IC

MERALCO AVENUE, PASIG CITY


IV

RAMP DETAILS, EAVES DETAIL, SUN BREAKER DETAIL


SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


5 3
A-7
6 5 50mmØ G.I. PIPE SCH. 40
50mmØ G.I. PIPE SCH. 1250
9000 A-7 PAINT FIN.
40 PAINT FIN.
4400 4400 50mm%% G.I. PIPE
200 146 SCH. 40 PAINT FIN.
500
50mmØ G.I. PIPE
A

250
SCHEDULE 40
19mm SQUARE BAR WELD 19mm SQUARE BAR (PAINT FINISH)
TO G.I. PIPE HANDRAIL WELDED TO G.I. PIPE
W-1 @146mm O.C. HANDRAIL @146mm
O.C.
PLAIN CEMENT STEEL 19mm SQUARE BAR

4500
TROWELL FIN. WELDED TO G.I. PIPE
HANDRAIL @146mm
5000

19mm SQUARE BAR


LANDING O.C. WELD TO G.I. PIPE

TYPICAL
HANDRAIL @146mm

4500
9 O.C.

WALL
250
8
HANDRAIL DETAIL

4498
4248
A-7
A-7 6 SECOND F.F.L. 5
A-7

TYPICAL
±842
18 17 A-7 SCALE : 1 : 20M ANCHOR @R.C.

730
STAIR
19 16
ANCHOR @R.C. STAIR

50
LANDING TREAD
15
DN 50mmØ G.I. PIPE SCH. 40
14 w/19mm SQ. BAR @146mm 730
14000

ON CENTER PAINT FIN. 25x25x2mm ANGULAR BAR


13

12 1460
NOSING
7 CRASH RAILING 9 SPOT DETAIL
16 TREADS @ 292mm EACH = 4672mm

500
TYPICAL
11
A-7 SCALE : 1 : 20M A-7 SCALE : 1 : 20M

10
4 SECTION DETAIL

50
0
9344

2x25x25mm ANGULAR
A-7 SCALE : 1 : 20M
BAR NOSING @STEP

3368
12x12x2mm FLAT BAR
STRAP @600mm O.C.
FIBER CEMENT FASCIA
X W/METAL SCREW ON STL.
INT FINISH 175
50mmØ SCH. 40 G.I. 50mmØ G.I. PIPE
NOSING DETAIL
3494 50
GUTTER PAINT FIN. PIPE PAINT FIN. SCHEDULE 40
6 1007 1007
(PAINT FINISH)

B A-7 SCALE : 1 : 10M


19mm SQ. BAR ANCHORED
TO THE WALL (PAINT FIN.)

900mm FROM TREAD


1993
(SECOND FLOOR TO GROUND FLOOR)

50
2 DETAIL PLAN OF STAIR 19 mm SQUARE BAR
ANCHOR TO THE
WALL (PAINT FIN.)
SCALE : 1:50 mts
A-7

5 6 A B C 8 SPOT DETAIL
14000 5000 A-7 SCALE : 1 : 5M

9000
4919 9081
ROOF LINE

10 SPOT DETAIL
A A-7 SCALE : 1 : 5M

W-1
1800
2200

TOILET 50mmØ SCH. 40 G.I. PIPE HANDRAIL 10


6400
4656

w/19mm SQ. BAR @146mm O.C


A-7
1700 200

W-1
5 292

A-7

1401 399

1800
50mm G.I.PIPE SCH. 40
17
C
2 RISERS @±168

HANDRAIL w/25mm SQ.


18 16
SECOND FLOOR LINE 19 CORRIDOR BRACKECT @600mm O.C. C
PAINT FIN.
18
337

19 15
LANDING 17
1
5
0
14 16
15
14000

700 200
13 EXPOSED
UNDERSLAB CEILING 14
PAINT FIN. 13
12 5mm THK. FACIAL
12 100mm THK CHB RAILING
16TREADS @ 292mm EACH = 4672mm

W-3 MIRROR
800 11 PLASTER AND PAINT FIN.

0
11 38mmØ STAINLESS

40
17 RISERS @±168 = 2856

STEEL GRAB BAR 10 SECOND FLOOR LEVEL


6400

50
10 9
2863

50mmØ G.I. PIPE SCH. 40


5526

600 1200

w/19mm SQ. BAR @146mm 8


9344

9 7
ON CENTER PAINT FIN. 200x200mm VITRIFIED
GLAZED WALL TILES 6

3702
8
ELEV.
3530

3290

1401 399
7 LAV
584 4
3 SCALE: 1:50m DETAIL
±1800

1800
±337
WC 684
WC
2 SCALE: 1:20m
6
9 1
CORRIDOR
5
A-7 GROUND FLOOR LINE HE HCR
11 BALCONY RAILING DET.
650

4
NATURAL GRADE LINE
A-7 SCALE : AS SHOWN
292

3
100

1800 3000
2 9345

B
16 TREADS @ 292 = 4672
1

(GRD FLOOR TO SECOND FLOOR)


UP
7 3 DETAIL SECTION OF STAIR
A-7
1 DETAILED PLAN OF STAIR A-7 SCALE : 1 : 50M

A-7 SCALE : 1 : 100M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-7


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY STAIR DETAILS
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED HANDRAIL DETAILS


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


100 1175 850 850 425

1 2 10 11 200x200mm VITRIFIED
GLAZED TILES

4500 4500

PLAIN CEMENT PLASTER


PAINT FINISH

SD
1750 100 100 1750 200X200 VITRIFIED
2ND FLR. LVL. 2ND FLR. LVL. CERAMIC WALL TILES
( GLAZED )

600
651
512

512
LANDING LANDING
SINK COUNTER
LANDING LVL. LANDING LVL.

125

125
200x200mm VITRIFIED
1013

1013
GLAZED WALL TILES

3500

3200

3200
W-3 W-3

2688

2688
DET. PLAN
2713

2738
2613

2613
TREAD
SINK
DET. ELEVATION
1600

1600
URINAL

900
200 250
150

150
PLAIN CEM. PLASTERED
CORRIDOR LVL. WC FEMALE CLASSROOM LVL. CLASSROOM LVL. MALE WC CORRIDOR LVL.

50

50
25

25
PAINT FIN.
300

300
TOILET LVL. TOILET LVL. TOILET LVL. TOILET LVL.
FIN. GRADE LN. FIN. GRADE LN.

200x200mm GLAZED

3 DET. SECTION OF FEMALE TOILET 4 DET. SECTION OF MALE TOILET WALL TILES

A-8 SCALE : 1 : 50M


A-8 SCALE : 1 : 50M

200 150 250

1 2

150
4500 10 11
1800 600
4500

LOW PARTITION w/
1500 2250
150 1750 URINAL
200 250 1500
200x200mm VITRIFIED

800
W-3
GLAZED WALL TILES W-3

A SLOP
600

UD

900
D-5
900

D-5 SINK

URINAL
2500

200x200mm VITRIFIED DET. SECTION


943

200x200mm VITRIFIED
FLOOR TILES
FLOOR TILES
900

D-5 (UNGLAZED) FL3

1500
D-2
HCR (UNGLAZED)
SD
450

450 100

SHE
600

5375

PLAIN CEM. PLASTERED


SINK COUNTER

FL3
D-3 3mm THK. SOLID WOOD
1500

PAINT FIN.
HCR FASCIAL MIRROR ON AL.
HE D-4 FRAMING
600

600
7000

7000
SINK COUNTER
7000

450

STO.

2650
600

200x200mm VITRIFIED WALL


STO. D-4
TILES (GLAZED)
450
1550

800
240

2500
240 450 600 600 450

D-3
3300

D-2

200
1500
2186

300
B

800
UP
2103 2397
UP

150
1 FEMALE TOILET DETAIL 2 MALE TOILET DETAIL
A-8
DET. OF COUNTER SINK
SCALE : 1 : 20M
A-8 SCALE : 1 : 20M

A-8 SCALE : 1 : 20M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED A-8


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

8
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY TOILETS DETAIL
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3
C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3

A TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2
7000
100mm THICK
SLAB ON FILL
WITH Ø10mm
SPACED AT 400
BOTHWAYS

F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2

B TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3
2500

TG-1

TG-1

TG-1

TG-1

TG-1
TG-1

TG-1
B

S-3

F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
C C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1

A FOUNDATION PLAN
S-1 SCALE : 1:100 M.

1 2 3 4 5 6 7 8 9 10 11
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

G-3a G-3 G-3 G-3 G-3 G-3a G-3 G-3 G-3 G-3a
A
STAIR WELL STAIR WELL
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

CB-1
7

7
CB-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
7000

G-5

G-5
-

-
G

G
B-2

B-2
S-2 S-2
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
B
2500

S-2 S-2
G-4

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-4
S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2

G-6
C
G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1

B 2ND FLOOR FRAMING PLAN


S-1 SCALE : 1:100 M.

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED S-1


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

4
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY FOUNDATION PLAN
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p 2ND FLOOR FRAMING PLAN

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
A

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2
7000

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1
B RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
2500

RG-1

RG-1
RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1
C
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

LC-120x40x20x2.0 PURLINS
Ø12mm CROSS
SPACED @ 750 mm O.C
BRACINGS
WITH Ø10 SAGRODS @ MIDSPAN

A ROOF DECK FRAMING PLAN


S-2 SCALE : 1:100 M.

L1 L2

L1/3 TOP BAR


L1/3 L2/3 TOP BAR

L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR

B TYPICAL SLAB ELEVATION


S-2

S C H E D U L E OF S L A B S
REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
in mm in mm
THICK-
FLOOR SLAB
NESS LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
LEVEL MARK REBAR REBAR
in mm SIZE SIZE
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.
LEVEL
SECOND

S-1 100 10Ø 200 300 - 300 200 300 10Ø 250 300 - 300 250 300 TWO-WAY

S-2 100 10Ø 300 300 - 300 300 300 10Ø 300 300 - 300 300 300 TWO-WAY

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED S-2


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

4
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY ROOF DECK FRAMING PLAN
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED SCHEDULE OF SLAB


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


COLUMN SCHEDULE AS SHOWN
Ø10 SPACED

LEVEL C-1 C-2 C-3


MAIN BARS
Ø10 @250 Ø10 @250
CUT BARS
10 11
1-Ø10
NOSING BAR
NGL
350 350 350

100

125
5
TIE BEAM

12
Ø10 300mm TEMP
(SEE SCHEDULE)
BARS BOTHWAYS

100
2ND FLOOR LEVEL TO

400
350

350

350
4-Ø10 CONT. BARS
ROOF DECKLEVEL

125
Ø10 @250
Ø10mm
CUT BARS

MAIN BAR: MAIN BAR: MAIN BAR:

8-Ø16mm 8-Ø20mm 8-Ø20mm


A DETAIL OF TIE BEAM B DETAIL OF STAIR ON GRADE C DETAIL OF RAMP
TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm SCALE NTS SCALE 1 : 25M SCALE 1 : 50M
S-3 S-3 S-3
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

350 350 350

L1 L2 L3

L2/3 L2/3 L3/3 L3/3

2D 2D LAP SPLICES ARE ALLOWED 2D 2D LAP SPLICES ARE ALLOWED 2D


FOUNDATION LEVEL TO

ONLY IN THIS PORTION ONLY IN THIS PORTION


350

350

350
2ND FLOOR LEVEL

D
L2/5 L2/5 L2/5 L3/6

2-Ø12mm SIDE BARS


MAIN BAR: MAIN BAR: MAIN BAR:

8-Ø16mm 14-Ø20mm 12-Ø20mm

TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm


D TYPICAL BEAM ELEVATION
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER S-3

B E A M S C H E D U L E

BEAM S T E E L R E I N F O R C E M E N T S
L
DIMENSIONS S T I R R U P S
FLOOR BEAM
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT
Ø10mm
NGL (mm Ø) (UNLESS NOTED OTHERWISE)
b h TOP BOTTOM TOP BOTTOM TOP BOTTOM

G-1 200 400 Ø20mm 2 2 2 2 2 2 1@50, 6@100, REST@200

G-2 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200


D

Y-BARS
X-BARS G-3 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200
W

G-3a 200 800 Ø20mm 3 2 2 2 3 2 1@50, 8@175, REST@300


t

G-4 200 400 Ø20mm 2 2 2 2 5 3 1@50, 6@100, REST@200

2ND FLOOR LEVEL


Y-BARS
100

X-BARS
G-5 250 500 Ø20mm 5 3 2 4 5 3 1@50, 8@100, REST@200
100 mm THICK
L G-6 200 400 Ø20mm 2 2 2 2 5 3 1@50, 6@100, REST@200
GRAVEL BEDDING

PLAN SECTION G-7 250 500 Ø20mm 5 3 2 6 5 3 1@50, 8@100, REST@200

B-1 200 400 Ø16mm 4 2 2 2 4 2 1@50, 6@100, REST@200

E TYP. FOOTING DETAIL B-2 200 400 Ø16mm 2 2 2 4 2 2 1@50, 6@100, REST@200

SCALE NTS CB-1 200 400 Ø16mm 4 2 4 2 4 2 1@50, 6@100, REST@200


S-3

RG-1 200 400 Ø16mm 2 2 2 2 2 2 1@50, 6@100, REST@200

ROOF
LEVEL
SCHEDULE OF FOOTING RG-2 200 500 Ø16mm 5 3 2 3 4 3 1@50, 8@100, REST@200

FOOTING
FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS
TG-1 300 500 Ø20mm 3 2 2 2 4 3 1@50, 8@100, REST@200

BEAM
MARK TIE
LENGTH WIDTH DEPTH Thickness TG-2 300 500 Ø20mm 4 3 2 2 4 3 1@50, 8@100, REST@200
BAR X BAR Y
(L) (W) (D) (t)
TG-3 300 500 Ø20mm 2 2 2 2 2 2 1@50, 6@100, REST@200

F-1 1400 1400 1500 300 7 - 16mmØ 7 - 16mmØ SQUARE FOOTING

SQUARE FOOTING STB-1 200 400 Ø16mm 3 2 2 4 3 2 1@50, 6@100, REST@200


F-2 2300 2300 1500 300 12 - 16mmØ 12- 16mmØ
BEAM
STAIR

STB-2 200 500 Ø16mm 4 2 2 4 4 2 1@50, 8@100, REST@200


F-3 2100 2100 1500 300 11 - 16mmØ 11 - 16mmØ SQUARE FOOTING

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED S-3


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

4
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
DET. STAIR ON GRADE, RAMP & BEAM
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED DET. OF FOOTING, TIE BEAM & COLUMN


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


D
S-4
L

C
5 S-4
6
S-4 200 4500

50 50 50 50 2200 2200

6mm GUSSET PLATE

BOTTOM CHORD A
2500

W-2
W
1 - 4-Ø12x300mm LONG
1

2
-

W-2

W-2
W

-
ANCHOR STUDS

W
2

2
F

W-2
S-2

W-2
-

2150
-
W

W
S-4

50
2
W-2 - 200x200x10mm

W-2
W

2834
EMBEDED PLATE

W-1
1187
W-2

W-2

200
100
STB-2
E
W-2 S-4
2L-2x2x1/4 STRUT W-2 DC-1
DC-1

1000 2-SPAN @1250 2-SPAN @1125 4-SPAN @1187.5 1000 P


2500 2250 4750

50
9500 S-4
SEE SCHEDULE OF

4500mm
2ND FLOOR LEVEL
DN S-2 (2ND/3RD LVL)
CB-1 FOR DETAIL OF REIN.
CB-1

DETAIL OF T-1 PLAN

7000
A G-2

=
G-3a M
STB-2

EACH
SCALE 1 : 25 M S-4
S-4 2150

300mm
N

4500

3200
S-4

2856
6mm GUSSET PLATE
292

SCHEDULE OF TRUSS MEMBERS

0
200

@
BOTTOM CHORD (FULLY

20
TREADS
WELDED TO BASE PLATED)

B-2
TO 6mm GUSSET PLATE (TYP.) 50 50 50 50

168
D P
R CH
CHO OR
P D MARK DESCRIPTION QTY SIZE 4-Ø12x250mm LONG
TO
ANCHOR STUDS

15
W-1 TOP & BOT. CHORDS 2L 2"x2"x1/4" GROUND FLOOR LEVEL
200x200x10mm BASE
PLATE
W-2 WEB MEMBERS 2L 2"x2"x3/16"

FULL WELD
COLUMN OR BEAM
B O
TG-3

S-4
KING POST

D CONNECTION DETAIL K STAIR FRAMING PLAN (TYP.) L STAIR SECTION DETAIL


1 : 5 M
S-4
SCALE
ORD S-4 SCALE 1:50 M
S-4 SCALE 1:50 M

CH
P
TO 6mm GUSSET PLATE (TYP.)

Ø16 @200 Ø10 @300


FULL WELD
TEMP BARS

Ø12@ 125 TOP Ø12@ 125


MAIN BARS STEP BARS 2-Ø10

SECTION STEP BAR

200mm 200

200
TYPICAL TRUSS
Ø12 @120

200
H ANCHORAGE DETAIL Ø16 @ 200
MAIN BAR MAIN BAR:
SCALE 1:5 M

0
CONNECTION DETAIL
FULL WELD 4-Ø16mm
S-4
SECTION OF STAIR SLAB

0
F M

2
6mm GUSSET PLATE (TYP.) Ø12 @300
TIES : Ø10 mm

SCALE 1 : 5 M 1@50, 8@75, REST @


S-4 S-4 SCALE 1:25 M
150mm TO CENTER

N SPOT DETAIL DC-1


BOTTOM CHORD SCALE 1 : 25 M
SEE TRUSS ANCHORAGE DETAIL
S-4 (FROM LANDING TO
E CONNECTION DETAIL W
-
1
Ø10 @300 2ND/3RD FLOOR LEVEL)

SCALE 1 : 5 M 120x40x20x2.0mm
S-4 STEEL C-PURLINS
2-Ø10
±750mm O.C.
STEP BAR
10mmØ SAG ROD WITH 200mm
STANDARD NUTS & Ø10 @300
75

W-2
±7 WASHERS @ EACH END
50
LC-120x40x20x2.0 6-Ø10x200mm LONG
2-Ø10
PURLINS
STEP BAR
75

1-Ø10mm A-307
ANCHOR BOLT
L-2.5x2.5x1/4

100
100
100 100
100
CB-1
W-2
Ø10mm @
TG-3
300mm o.c.

3-Ø10mm STB-2

HALF TRUSS O SPOT DETAIL P SPOT DETAIL


G PURLIN CONNECTION DETAIL I SAG ROD CONNECTION DETAIL J CONNECTION DETAIL S-4
SCALE 1 : 25 M
S-4
SCALE 1 : 25 M

SCALE 1 : 5 M SCALE 1 : 10 M SCALE 1 : 10 M


S-4 S-4 S-3

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED S-4


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

4
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
TRUSS DIAGRAM, DETAIL OF STAIR
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED DETAILS OF STEEL CONNECTION


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


LOAD SCHEDULE
GENERAL NOTES LEGEND

SYMBOL DESCRIPTION
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PANELBOARD: LP

PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF - CEILING LIGHT OUTLET
MAIN : 100AT, 100AF, 2P, 230V
THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. THE ELECTRICAL
2 - 2 x 40 WATTS FLUORESCENT LAMP
CIRCUIT BREAKER
WORKS SHALL BE DONE UNDER THE IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER. F - CEILING FAN OUTLET CKT. VA
DESCRIPTION WIRE & CONDUIT SIZE
NO. LOAD
S/Sa - ONE GANG DEVICE SWITCH VOLT POLE AT AF

S ab - TWO GANG DEVICE SWITCH 1 1260


CONVENIENCE OUTLET - 7x180w 230 2 20 50 3.35mm² THW IN 15mmØ C

S cde - THREE GANG DEVICE SWITCH 2 720


CONVENIENCE OUTLET - 4x180w 230 2 20 50 3.35mm² THW IN 15mmØ C
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz.
S 3W - THREE WAY DEVICE SWITCH 3 1260
CONVENIENCE OUTLET - 7x180w 230 2 20 50 3.35mm² THW IN 15mmØ C

720
CONVENIENCE OUTLET - 4x180w 230 2 20 50 3.35mm² THW IN 15mmØ C
3. WIRING METHOD SHALL BE AS FOLLOWS : Sf - FAN CONTROL SWITCH 4

LIGHTING OUTLET 13x100w


a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT S EF - EXHAUST FAN SWITCH 5
EXHAUST FAN 1x180w
1480 230 2 20 50 3.35mm² THW IN 15mmØ C

b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT SCH. 40 6 LIGHTING OUTLET 15x100w 1500 230 2 20 50 3.35mm² THW IN 15mmØ C
- RACEWAY CONDUIT CONCEALED IN CEILING
BRANCH CKT., & AUXILIARY
- RACEWAY CONDUIT CONCEALED UNDER FLOOR 7 LIGHTING OUTLET 11x100w 1100 230 2 20 50 3.35mm² THW IN 15mmØ C
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE "THW" UNLESS OTHERWISE INDICATED IN THE
8 LIGHTING OUTLET 15x100w 1500 230 2 20 50 3.35mm² THW IN 15mmØ C
PLAN. THE MINIMUM SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE 3.5mm² AND INSULATED - PANELBOARD
10 S P A R E 1500 230 2 20 50
FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE 15mmØ TRADE/NOMINAL SIZE. I
- CKT. BREAKER, RATING AS INDICATED
10 S P A R E 1500 230 2 20 50
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE

10 AMPS, 250 VOLT WITH MODERN PLATE COVER


5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP TYPE WITH FACTORY KNOCKOUTS.
- EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE
EF
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED LP
TYPE FOR THE PARTICULAR LOCATION AND
- HOMERUN DIRECT TO PANELBOARD
PURPOSE OF USAGE.
- PUSH BUTTON
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL
- ENCLOSED AIR CIRCUIT BREAKER
CODE REQUIREMENT.
FA - FIRE ALARM CONTROL PANEL TOTAL 14680
8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
F - FIRE ALARM STATION OUTLET

a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR IL @ 80% D.F.


12540
= 54.5x A80% x 1.25 = FEEDER: 2-30mm² THW IN 32mmØ C
- VIBRATING BELL OUTLET
B
230 V 100 AT, 100 AF, 2P, 230 V
PROTECTION:
b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.
B - FIRE ALARM BELL

c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR M - SERVICE METER


OVERHEAD SERVICE ENTRANCE
CONNECTED TO 220V AC, 1Ø, 2 WIRE, 60
- SERVICE ENTRANCE Hz FITTED WITH
32MMØ TYPE "F" CONDULET
d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR

BUILDING WALL TO SIMILAR OUTLET


e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR
@ SECOND FLOOR

& THIRD FLOOR


2ND FLOOR LINE

f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

PANEL LP
2-32mm²THW B B
IN32mmØ RSC

150AT, 225AF, 2P, 230V AC


TO LINE SIDE OF LP

1 2

20 20
F
3 4
20 20
METERING CONDUIT

3-3.5mm² THW
KWHR METER IN15mmØ RSC
5 6
20
20

FA
7 8
20 20

9 10

20 20 2-3.5mm² THW
ENCLOSED ACB IN15mmØ RSC
11 12 RATING: 20AT, 50AF,
20 20
230V, 2P 2-3.5mm² THW

mm
mm
IN15mmØ RSC TO NEAREST C.O.

13 14

1500
20

1800
20

15 16
20 20

GROUND TERMINAL
ELECTRICAL FIRE ALARM VIBRATING BELL
GROUND FLOOR LINE

#14MM² BARE COOPER WIRE


FIN. GRADE LINE

16mmØx2400mm
2
1-8.0mm BARE COPPER WIRE
IN 15mmO C
COPPERWELD
GROUND ROD
16MMO x 240MM LENGTH
GROUNDING ROD COPPERWELD

SINGLE LINE DIAGRAM RISER DIAGRAM


NOT TO SCALE
NOT TO SCALE

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED E-1


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :
LOAD SCHEDULE
3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY GENERAL NOTES LEGEND
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED SINGLE LINE DIAGRAM RISER DIAGRAM


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9

A
2
2

2 2 2 2 2 2
S
S

DN DN

F F F

2 2 2 2 2 2

LP
7
S ab Sf S cd Sf S ef Sf
B UP
S ghi
UP
S jk
g h i j k
2 2

LP
6

SECOND FLOOR LIGHTING LAYOUT


SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 9 10 11

A EF
UD
EF

s S s
j
Sj

URINAL
a b
SD
2 2 S r
r
SINK COUNTER

i i
q
Si

SINK COUNTER
F
STO.

a b

2 2

Sq
LP LP
6 5
S ab SF
B UP
S klm S nop UP

k l p
2 2 2

LP
7

C
RAMP RAMP
UP UP

GROUND FLOOR LIGHTING LAYOUT


SCALE : 1 : 100 METERS

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED E-2


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
AL

LIGHTING LAYOUT
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11

DN DN

LP
3

B UP UP

LP
4

B B

SECOND FLOOR POWER LAYOUT


SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 9 10 11

A UD

URINAL
SD
SINK COUNTER

SINK COUNTER
STO.

LP
1

B UP
UP

TO C.O.
LP
2

TO F.A.
B B

C
ENCLOSED AIR CIRCUIT BREAKER RATING
230V 2P 100AT 100AF TO LINE SIDE OF
RAMP
RAMP
PANEL
UP UP

OVERHEAD SERVICE ENTRANCE REFER


TO RISER DIAGRAM

GROUND FLOOR POWER LAYOUT


SCALE : 1 : 100 METERS

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED E-3


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
POWER LAYOUT
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10 11
600 4500 9000 9000 9000 9000 4500 600

4500 4500 4500 4500 4500 4500 4500 4500

RD RD RD RD RD RD

1000
A

7000

B
2500

2 ROOF DRAIN LAYOUT


C
1000

LN. OF STRUCTURE
P-1 SCALE : 1 : 100 METERS

RD RD RD RD RD RD

1 2 3 4 5 6 11

CO 100mmĐ PVCSP 100mmĐ PVCSP


SEPTIC TANK OUTLET
50mmPVCSP

50mmPVCSP

100mm� PVCSP 100mmĐ PVCSP CO

CO

100mmĐ PVCSP
CB 150mmØ CDP CB CB
150mmØ CDP
75mmØ 100CO
PVCDS DS 75mmĐ
50mmPVCWP

75mØPVCDS

75mPVCDS
A
75mPVCSTR

PVCDS

75mØPVC

PIE(VSTR)
WC WC
75mPVCSTR

75mØPVC

PIE(VSTR)
SS UD 50mmØ PVCVTW
100mmØ PVCSP
50mmPVCVSTR
100mmĐ PVCSP
12mmØ GICWL

50mmĐ PVCWP

5
V
OUTLET

5
V
0
S
0
S
50mmØ PVCVR

m
T
m
WC

T
FD LAV 50mmPVCVSTR RISER

m
R
m
R
RISER

P
P
V
V
C
C
12mmØ GICWL

FD CO WC
LAV FD CO
CS

12mmØ
50mmØ PVCVTW
CO
WC

12mmĐ GICWL
FD
12mmØ GICWL CLASSROOM

GICWL
CO STO.
STO.
CS
12mmØ GICWL
20mmØ GICWL
150mmØ CDP

12mmĐ GICWL
CV

20mmĐ GICWL
B UP
UP

FD FD

C
75mPVCDS

75mPVCDS

HB
38mmØ GICWL

RAMP RAMP
UP UP

CB CB 150mmØ CDP
150mmØ CDP TO MAIN
DRAINAGE SYSTEM

PLUMBING RO-IN LAYOUT

38mmØ GICWL TO MAIN


150mmØ CDP TO MAIN

WATER SYSTEM
DRAINAGE SYSTEM
1

P-1 SCALE : 1 : 100 METERS

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: EMEC
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED P-1


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG ELIAS M. EMEL B. CUBA II LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
ROOF DRAIN LAYOUT , PLUMBING RO-IN LAYOUT
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


PVCVDS

PIPE (VSTR)
PVC
75mmØ

75mmØ
11

PIPE (VSTR)
PVC
75mmØ

O
10

C
W
T
V
C
5

V
0

P
m

S
V m

Ø
P

R
S V

T
T C

S
R

V
PVCVDS

C
Ø
CB

V
m

P
m

m
0

m
0

R
0
1

E
P

S
S

I
C

R
V

75mmPVCDS
P
Ø
P

C
S
75mmØ

W
0
C

0
V

1
P
9
5
0

1
Ø

V
m

2
LA
m
V m

m
P

O
S

m
FD
V

C
Ø
T

C
C

FD
R

W
P
0

G
CD
ØO
1

I
mC

C
0m0

W
B
115 0

L
C

P
W
75mmPVCDS

.
V
75mmPVCDS

O
C Ø

T
m

2
S

S
PV m

0
D
5

m
7

m
0

Ø
C
5

G
I
C
8

W
L
L
W
FD

C
I
G
O

Ø
m
C

m
1
PVCVDS

2
2

1
m
CB

S
Ø

C
DS

P
G
I

U
C
W
L

75mmPVCDS
75mmØ
7

CB

3 I
8 N
M

m
A

m W
Ø A
FD
P
CD

G
I R
Ø

C S
T
m

W Y
E
0m

L S
OO

1
15

T E
M

O M
SR

m D
S

I
T

T
m RA
Y

N EM
AS
E

Ø I
S
L

T
T

CL
U

C
O

D
P E
N
A
G

T
O
P
CD
6

Ø
m
0m
15
U MP
P
S

A
C

P
R
V
PVCVDS

CB
Ø
K

DS
m
N
A

m
T

O
0

C
C

0
I

75mmPVCDS
T

1
P
E
S

75mmØ
5

CB
FD
P
CD
Ø
m

M
0m

OO
15

SR
AS
CL

B
H

P
CD
P
4

Ø
S

m
0m
C

15
V
P

L
W
Ø

C
I
m

G
m
PVCVDS

Ø
CB

m
0

m
1

8
DS

3
75mmPVCDS
75mmØ
3

CB
FD
P
CD
Ø
m

M
0m

OO
15

SR
AS
CL
75mmPVCVSTR

B
H

P
CD
2

Ø
m
0m
75mmPVCVSTR

15
P

CB
S
C

DS
V
P
Ø

75mmPVCDS
m
m
0
0
1
1

CB
P
C mØ CD
P
S

PV 5m mØ
C

FD
V

7 m
P

0
m

5
m

M
1
0

S
5

OO
D

SR
AS
CL

B
H
S
O

S
P
C

P
C

CD
L
W
V

Ø
IC
P
P

m
m
S

0m
m
C

15
0
V

m
5
P

R
m
m

T
2
m

S
1
0

V
O

S
5

C
C
C

V
FD

P
m
m
0
5
C
B

m L
2 W
C

75mmPVCDS
1 IC
m

G
C

W Ø
W

IC m
P

FD

G m

L
S

2
C

1
V

V
P

LA

CB
Ø
m
m

FD
0

O
0

T
1

S
S R
R CV

R
E
V
P

I
A

U MP
m

L
m

W
0

P
5

B
I
V Ø

R
H
G
C Ø
C m

G m

Ø
P m

P
L
T

m
m

D
W
0

m
C
2

0
5

P
1
V

U
m

PLUMBING RO-IN LAYOUT


m
0
5
1

P-1 SCALE : 1 : 125 METERS


B

B
C

1
5
D

0
R

m
A

m
I

Ø
N
A

C SY
G

D S
E
C

P T
T
O
E

M
M

A
I
N

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: EMEC
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED P-2


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG ELIAS M. EMEL B. CUBA II LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY ISOMETRIC VIEW
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


LEGEND:
CB CATCH BASIN

100mm THK. + FIN. SLAB w/100mmØ CDP CONCRETE DRAIN PIPE


100mm THK.+FIN. SLAB w/10mmØ REBARS BENT UP 2 OUT OF 3 @L/4 FROM FACE
150mm THK. CHB
@200mm OC BENT UP 2 OUT OF 3 AT L/4 FROM 150x300mm RC BEAM w/2-16mmØ TOP AND
SUPPORT BW
1500 FACE SUPPORT BOTHWAYS BOT. REBARS & 10mmØ STIRRUPS 1@50, CO CLEAN OUT
3@100, REST @300mm OC
AIR SPACE
AIR SPACE 2500
NGL CV CHECK VALVE
NGL

VAR.
MH MH HB HOSE BIBB

AIR SPACE INLET


FD FLOOR DRAIN
749 249

749 250
GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)

125
WATER
WATER LEVEL GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)
LEVEL
375 1750 375 INLETS
GV GATE VALVE
LEACHING PLASTERED w/WATERPROOFING PLASTERED w/WATERPROOFING
5375

CHAMBER MH MANHOLE

4750
3999

COMPOUND OR APPLY ONE FACE COMPOUND OR APPLY ONE FACE


BITUMEN TAR BITUMEN TAR
GRAVEL BED DIGESTIVE CHAMBER PVCDS POLYVINYL CHLORIDE DOWNSPOUT

WALL REINFORCEMENT 10mmØ VERT. & WALL REINFORCEMENT 10mmØ VERT. &
PVCDP POLYVINYL CHLORIDE DRAIN PIPE
HOR. BAR @200mm OC BW HOR. BAR @200mm OC BW

1% SLOPE PVCDS POLYVINYL CHLORIDE DOWNSPOUT


375

100mm THK. SLAB w/ 10mmØ REBARS

375
100mm THK. SLAB w/ 10mmØ REBARS
@300mm BOTHWAYS
@300mm BOTHWAYS PVCSP POLYVINYL CHLORIDE SOIL PIPE

375 6250 375


375 2500 375 10000 375 PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
7000
13625
PVCVP POLYVINYL CHLORIDE VENT. PIPE

PVCVS POLYVINYL CHLORIDE VENT STACK

PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL


2 SECTION DETAIL 3 SECTION DETAIL PVCWP POLYVINYL CHLORIDE WASTE PIPE

P-3 SCALE : 1:40 Mts.


P-3 SCALE : 1:40 Mts.
PVCWS POLYVINYL CHLORIDE WASTE STACK

RD ROOF DRAIN
700
UD URINAL DRAIN
150 400 150

WC WATER CLOSET

LAV LAVATORY

150
DRAINAGE PIPE CS COUNTER SINK

700
400
INLET OUTLET
PLUMBING NOTES:

150
1. GRADES OF HORIZONTAL PIPINGS RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE
NOT LESS THAN TWO PERCENT (2%)
13624

DETAIL PLAN
375 2503 375 9999 375 CHANGE IN DIRECTION ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°)
5a 2.
WYES, LONG SWEEP QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM
500 1500 500 3750 375 1750 375 3750
HORIZONTAL TO VERTICAL A SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER
P-3 SCALE : 1:20 M
BENDS MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
375

3. PROHIBITED FITTINGS NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE
DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE
S-1a 100mm THK. + FIN. SLAB w/ 100mmØ
2250

OUTLET PROHIBITED.
REBARS @300mm OC BENT UP 2 OUT OF 3 @L/4
FROM FACE SUPPORT BOTHWAYS
125 (TYP.) 700
1.
4. PIPE CLEAN-OUTS
2-100mmØ EXTRA BARS TOP/BOT. ON 150 400 150 CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:
1251500125

TWO PARALLEL SIDE 75 a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°).
b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
7000
6250

MH S-1a MH INLET c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.


S-1a

100
d) AT THE END OF ANY HORIZONTAL PIPE LINES.
2
CDP
P-3
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.

(VARIABLE)
S2 100mm THK. + FIN. SLAB w/

600 min.
50
2250

10mmØ REBARS @300mm OC BENT UP 2% SLOPE


CDP 6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
2/3 OUT @L/4 FACE SUPPORT AND INLET
2% SLOPE VAULT ROOF SLAB.
SHORT SPAN 10mmØ TEMP. BARS 50
@300mm EW OUTLET
150mm THK. CHB w/100mmØ REBARS 7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
375

600

100
HOR. @2-LAYER VERT. @600mm OC.
250 100 250 8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING

100
CONTRACTOR.
3 10mmØ BAR HANDLE
P-3 DESIGN
100

DETAIL SECTION
3-10mmØ (E.W.)
5b CRITERIA
50 50 i. LIVE LOAD_________________ 1000Pa
50 500 50
P-3 SCALE : 1:20 M
ii ALLOWABLE STRESSES
1. CONCRETE
a. FOR FOOTING, BEAMS AND SLABS

1 SEPTIC TANK DETAIL 4 MANHOLE COVER DET. 5 CATCH BASIN DETAIL SECTION fc'' = 20 MPa
2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)
P-3 SCALE : 1:20 MTS. fm' =6.90 MPa, fm = 2.41 MPa
P-3 SCALE : 1:40 Mts.
P-3 SCALE : 1:10 Mts.

3. REINFORCING STEEL BARS


FOR BARS SMALLER THAN 16mmØ
fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: EMEC
DEPARTMENT OF EDUCATION

EIGHT (8) CLASSROOM ENCODED BY: MMC DepED P-3


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG ELIAS M. EMEL B. CUBA II LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :

3
S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
SEPTIC TANK, CATCH BASIN & COVER DETAIL, LEGEND,
AL
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED NOTES & DESIGN CRITERIA


ON
LOCATION : DATE :
PH
De ED
p

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

You might also like