POLE.REQ.004 Paint Shot Blasting + Zinc Phosphate primer + PU Paint Yes Page 6, S. No. 7
POLE.REQ.007 Chequered plate Total weight of pole structure Yes Page 6, S. No. 6
Pole Design should be approved by structural
POLE.REQ.008 Design Engineer appointed by PCSCL and must follow Yes Page 6, S. No. 8
appropriate guidelines.