From To Pipe D (mm) Cover (mm) Length (m) Slope (%) Surface Level (m)
P1 I.L @ P1 225 450 N/A N/A 8
P1 P2 I.L @ P2 225 450 20 1 8.5
P2 P3 I.L @ P3 375 450 30 1 7.5
P3 P4 I.L @ P4
P4 P5 I.L @ P5
P5 P6 I.L @ P6
P6 P7 I.L @ P7
P7 P8 I.L @ P8
P8 P9 I.L @ P9
P9 P10 I.L @ P10
P10 P11 I.L @ P11
P11 P12 I.L @ P12
P12 P13 I.L @ P13
P13 P14 I.L @ P14
Pipe Invert @
Based on Cover (m) Based on Slope (m) Selected I.L (m)
7.325 7.325
7.825 7.125 7.125
6.675 6.825 6.675
0 6.675 0.000