Download as pdf
Download as pdf
You are on page 1of 1
Peck & Hale), INSTALLATION PROCEDURE FOR F655 BREECH BASE (RAISED) DECK SOCKET INSTALLATION INSTRUCTIONS: STEP 1: DECK LINES ‘Shipyard is to lay out intersecting lines on the deck which locate the center line of the deck socket ‘opening ralative to the center lines of the I.S.O. container comer casting openings. STEP 2: POSITIONING Socket to be positioned over deck lines described in STEP 1 above. : SUPPORTS AND STIFFENERS Shipyards to supply supports, stiffeners, and reinforcing plates to sult ship structure with adequate installation and construction to satisfy appropriate classification society requirements. STEP 4: PREPARATION Socket, deck plates, and base plates are to be properly prepared and cleaned before welding, ‘STEP 5: PREHEAT Socket to be preheated to 100°C -150°C. Retard cooling after welding ‘STEP 6: WELDING ‘Weld with 70,000 P-S.1. low hydrogen rod equal to A.W.S. E7018. Moisture content to be controlled per recommended A.W.S. storage and reconditioned procedures. STEP 7: CLASSIFICATION SOCIETY APPROVAL ‘Shipyard to obtain appropriate classification society approval on specific welding procedures. STEP DECK LINES TOP VIEW (SEE STEPS 1-2) SIDE VIEW (SEE STEPS 3-7) 180 DIVISION AVE., WEST SAYVILLE, NEW YORK 11796 ~ TEL. (516) 589-2510, 1-800-448-7925 ~ FAX (516) 589-2925,

You might also like