INTRODUCTION
This guide is prepared for the use of TSSA non-nuclear survey team leaders, members
and applicants for TSSA Certificates of Authorization. It is not intended to replace or
interpret the requirements of the CSA B-51 Standard or the ASME Boiler and Pressure
Vessels Codes, B31.1, B31.3 and B31.5. The checklist does not list all of the detailed
requirements of the CSA B-51 and ASME Codes referenced, but rather lists the
highlights that the applicant is required to include in the written Quality Control (QC)
Manual.
In addition, to assist the TSSA survey team, this guide is provided to applicants for
TSSA Certificates of Authorization for their use in identifying and verifying the
paragraph(s) where their QC Manual addresses all applicable control requirements of
the CSA Standard and ASME Codes. The QC Manual must contain the description of
the controls necessary for implementing the QC Program but, it is not required to
contain all of the programmatic requirements which will be found in the QC Program,
such as written procedures.
The guide is based upon CSA B-51 and ASME B31.1, B31.3 and B31.5 requirements.
The guide is subject to revision by TSSA based on changes made to CSA B-51 and
ASME Codes, from time to time, or based on feedback received from users.
A survey must cover a QC Manual and its implementation. It is recognized that the
scope of work, QC Manual and Manual implementation will vary from one applicant to
another, therefore, only those activities to be performed under the scope of an
applicant’s TSSA Certificate of Authorization are required to be addressed in the QC
Manual. TSSA survey teams are advised that this guide may not outline all possible
aspects of each survey. The QC Manual need not follow the format of this guide.
Questions of possible need for Interpretation raised by survey team members or the
applicant shall be submitted to the TSSA Chief Inspector for an answer, and when
submitted by the applicant a copy of the inquiry and reply should be provided by the
inquirer to the applicant’s Inspection Agency and any known involved enforcement
authority.
Review each checklist item in the checklist against the QC Manual and:
1) Check (√) the applicable column - “Yes”, “No” or “N/A” (Not Applicable)
2) Note the paragraph number in the QC Program Manual which covers the
subject addressed in the column labelled “Quality Program Reference”.
Submit one copy of the completed checklist with one controlled copy of the QC Manual
to TSSA Head Office for review, at least one month prior to the scheduled
implementation review date.
2 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Company Name:
Reviewed by: Date(s):
Note: The cover sheet may also contain the effective date of
the QC Manual, mailing address, phone number or other
information desired by the certificate holder or applicant.
(b) In the case where the QC Manual exists in more than one
language, at least one version is in English and identified as
the authoritative version.
3 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
3. ORGANIZATION
(a) Procedures exist which assure that the latest applicable drawings,
design calculations, specifications and instructions, required by
the Code, as well as authorized changes, are used for
manufacture, assembly, examination, inspection and testing.
Procedures include provision for:
4 of 11
QUALITY SYSTEM REVIEW CHECKLIST
B31.3
MATERIAL CONTROL
5.
(a) Procedures for material control exist and ensure that the
5 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
material received is properly identified and has documentation
including, as applicable, required material certifications or
material test reports, to satisfy Code requirements as ordered.
(b) The Material Control System ensures that only the intended
material is used in Code construction.
(d) The title of the individual responsible for identifying the need for
material test reports or certificate of compliance is designated.
B31.3
B31.3
6 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
7 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
7. CORRECTION OF NON-CONFORMITIES
WELDING
8.
(a) Welding conforms to requirements of Section IX and other
Sections of the Code, as applicable to the scope of work.
(b) Those responsible for certifying PQR’s and WPQ’s are identified.
(e) Those responsible for assuring that only qualified welders are
assigned to perform Code welding are identified.
(g) Measures are established for the control, issuance and return of
welding material.
8 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
(j) Measures provide for the right of the TSSA Inspector to require
re-qualification of a welder or procedure for cause.
B31.3
9. NON-DESTRUCTIVE EXAMINATION
9 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
applicable Code Section requirement;
HEAT TREATMENT
10.0
(a) Controls provided to assure that heat treatment as required by the
Code for the scope of Code work is applied.
RECORDS RETENTION
12.0
(a) Procedures exist for the maintenance of Piping Installation Test
Data Reports, Radiographs and records required by the applicable
Section of the Code.
SAMPLE FORMS
13.0
(a) Forms used to control functions relative to quality are included
within the QC Manual and their use explained in the text of the
QC Manual.
(b) Sample forms are subject to the same revision controls as the
rest of the QC Manual.
TSSA INSPECTOR
14.0
(a) A controlled copy of the QC Manual is available to the TSSA
Inspector at the plant or construction site where Code activities
are being carried out.
10 of 11
QUALITY SYSTEM REVIEW CHECKLIST
Item Quality element and subelements Yes No N/A Quality Program
No. Reference
(d) Provisions exist for free access for the TSSA Inspector and the
Inspector Supervisor to all areas involving Code activities.
REVIEW DEMONSTRATION
Note: A demonstration or implementation of the QC System during the joint review should include the administrative
functions to support the QC System and the manufacturing, fabrication and testing of product necessary to indicate
knowledge and ability to produce the component/parts covered by the Scope of the system.
The demonstration may be conducted on in-process work, a mock-up to current Code rules, or combination thereof,
and a review of past job documentation. Where Code work is in progress, the demonstration shall include the
administrative and construction functions for the products and orders, which are being processed to meet Code
requirements.