Schedule of Slab: Parallel To Short Span Parallel To Long Span

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF SLAB

PARALLEL TO SHORT SPAN PARALLEL TO LONG SPAN

SCHEDULE OF BEAMS
TOP BARS @
SUPPORTS

TOP BARS @
BOTTOM BARS SUPPORTS
TOP BARS @ @ MID-SPANS
SUPPORTS

FLOOR LINE

TOP BARS @
BOTTOMBARS SUPPORTS
@ MID-SPANS

SCHEDULE OF FOOTINGS
FLOOR LINE
SIZE REINFORCEMENT DEPTH (D)
MARKS THICKNESS REMARKS FLOOR BEAM

TYPICAL TWO-WAY SLAB


REINFORCEMENT DETAIL
FLOOR LINE
SLAB ON GRADE

"Y"

FTB FTB FTB

"Y"

NOTES:
1.) SPLICING SHOULD BE LOCATED
@ MID-HEIGHT OF COLUMN
2.) "Y"- CLOSER SPACING OF COLUMN
TIES PER SET AS SPECIFIED
IN THE COLUMN SCHEDULE.

ELEVATION OF TIED COLUMN

You might also like