MAIN DB
M-1 Air Conditioning 230 0.8 1200 0.8 960.0 6.5 MCB 1 20
M-2 Electric Water Heater 230 1.0 4500 0.2 900.0 19.6 ELCB (10mA) 1 20
M-3 Fluorescent Lighting (18 Watt x 10 Nos ) 230 0.9 180 0.6 108.0 0.9 MCB 1 6
M-4 Fluorescent Lighting (18 Watt x 10 Nos) 230 0.9 180 0.6 108.0 0.9 MCB 1 6
M-5 Ceiling Fan Point (100 Watt x 8 Nos) 230 0.8 800 0.8 640.0 4.3 MCB 1 6
M-6 Ceiling Fan Point (100 Watt x 7 Nos) 230 0.8 700 0.8 560.0 3.8 MCB 1 6
M-7 Spare 230 0.8 1000 0.8 800.0 5.4 MCB 1 6
INCOMING MAIN DB (PERANTI ARUS BAKI) 230 0.8 4,076 22.2 RCCB (30mA) 2 40
SUB DB
S-1 13 A S.S.O (2 Nos - Bedroom 1) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
S-2 13 A S.S.O (2 Nos - Bedroom 2) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
S-3 13 A S.S.O (2 Nos - Bedroom 3) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
S-4 13 A S.S.O (4 Nos.- Kitchen Appliances) 230 0.8 5800 0.5 2,900.0 31.5 MCB 1 32
S-5 13 A S.S.O (6 Nos. - Living Room) 230 0.8 5800 0.8 4,640.0 31.5 MCB 1 32
S-6 13 A S.S.O (2 Nos. - Ruang Tengah) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
S-7 13 A S.S.O (2 Nos. - Belakang Rumah) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
S-8 13 A S.S.O (2 Nos. - Depan Rumah) 230 0.8 3500 0.2 700.0 19.0 MCB 1 20
INCOMING SUB DB - (PERANTI ARUS BAKI) 230 0.8 11,040 60.0 RCCB (30mA) 2 63