QUOTATION
Electrical Work Design & Installation
PROJECT: Revamp and Modification
LOCATION: Sungai Choh, Rawang NO. RUJUKAN Rev. 0
DATE: 13 June 2016
NOTA PERHATIAN
1.0 HARGA ADALAH TETAP PADA TARIKH BIL INI DIKELUARKAN DAN TIDAK TERTAKLUK PADA PERUBAHAN KUANTITI, KADAR UPAH SEMASA
& HARGA BAHAN MENTAH
2.0 BIL KUANTITI BARU MESTI/HENDAKLAH DIKELUARKAN DENGAN NOMBOR RUJUKAN BARU, DITANDATANGANI DAN DIREKODKAN JIKA
BERLAKU PERUBAHAN KUANTITI, KADAR UPAH SEMASA DAN HARGA BAHAN MENTAH SEPANJANG TEMPOH PROJEK BERLANGSUNG.
3.0 BAYARAN DITERIMA HANYALAH DALAM BENTUK TUNAI. BAYARAN HENDAKLAH MENGIKUT JADUAL PEMBAYARAN (1) (a) DI ATAS.
4.0 BAYARAN DEPOSIT MESTILAH DIBAYAR SEBANYAK 60% DARIPADA JUMLAH HARGA AKHIR DI ATAS, OLEH PENGGUNA PERKHIDMATAN
KEPADA KONTRAKTOR ELEKTRIK. DEPOSIT MESTI DIBAYAR SEBELUM KERJA PEMBELIAN DAN PEMASANGAN DIBUAT. DEPOSIT ADALAH
BERTUJUAN PEMBELIAN BARANGAN DAN ALATAN KELENGKAPAN PEMASANGAN ALAT ELEKTRIK.
5.0 BAKI 30% DARIPADA JUMLAH HARGA AKHIR DIATAS MESTILAH DIBAYAR KETIKA SEMUA KERJA PEPASANGAN SIAP DAN BAKI 10%
MESTILAH DIBAYAR KETIKA SEMUA KERJA PENGUJIAN SELESAI DILAKSANAKAN.