QUOTATION
Electrical Work Design & Installation
PROJECT: Revamp and Modification
LOCATION: Sungai Choh, Rawang NO. RUJUKAN Rev. 0
DATE: 13 June 2016

HARGA SE-UNIT JUMLAH HARGA


NO ITEM UNIT QTY MATERIAL INSTALLATION MATERIAL INSTALLATION
(RM) (RM) (RM) (RM)

1.0 DISTRIBUTION BOARD


1.10 MAIN DB PANEL SET 1 RM500.000 RM500.00
1.11 SUB DB PANEL SET 1 RM400.000 RM400.00
1.12 TPN+E COPPER BUS BAR SET
1.13 MULTI DIGITAL METER SET
1.14 INDICATION LAMP SET
1.15 FUSE MCB SET
1.16 FUSE MCCB SET
1.17 FUSE ELCB SET
1.18 POWER CAPACITOR BANK SET
1.19 ON/OFF DOL STARTER SET

2.0 ELECTRICAL POINT


2.10 LIGHTING POINT (WIRING UP TO THE SWITCH) NO 20 RM140.000 RM2,800.00
2.11 GENERAL PURPOSE SOCKET OUTLET POINT NO 24 RM150.00 RM3,600.00
2.12 CEILING FAN POINT NO 15 RM140.000 RM2,100.00
2.13 TV SOCKET OUTLET POINT NO
2.14 ELECTRICAL HEATER POINT NO 1 RM180.00 RM180.00
2.15 AIR CONDITIONER POINT NO 1 RM180.00 RM180.00
2.16 DOOR BELL POINT NO
2.17 GATE BELL POINT NO

JUMLAH AKHIR: RM9,760.00

JADUAL PEMBAYARAN (1) (a)


DEPOSIT (60%) RM5,856.00

KERJA PEPASANGAN SELESAI (30%) RM2,928.00

KERJA PENGUJIAN SELESAI (10%) RM976.00


JUMLAH RM9,760.00

NOTA PERHATIAN
1.0 HARGA ADALAH TETAP PADA TARIKH BIL INI DIKELUARKAN DAN TIDAK TERTAKLUK PADA PERUBAHAN KUANTITI, KADAR UPAH SEMASA
& HARGA BAHAN MENTAH

2.0 BIL KUANTITI BARU MESTI/HENDAKLAH DIKELUARKAN DENGAN NOMBOR RUJUKAN BARU, DITANDATANGANI DAN DIREKODKAN JIKA
BERLAKU PERUBAHAN KUANTITI, KADAR UPAH SEMASA DAN HARGA BAHAN MENTAH SEPANJANG TEMPOH PROJEK BERLANGSUNG.

3.0 BAYARAN DITERIMA HANYALAH DALAM BENTUK TUNAI. BAYARAN HENDAKLAH MENGIKUT JADUAL PEMBAYARAN (1) (a) DI ATAS.

4.0 BAYARAN DEPOSIT MESTILAH DIBAYAR SEBANYAK 60% DARIPADA JUMLAH HARGA AKHIR DI ATAS, OLEH PENGGUNA PERKHIDMATAN
KEPADA KONTRAKTOR ELEKTRIK. DEPOSIT MESTI DIBAYAR SEBELUM KERJA PEMBELIAN DAN PEMASANGAN DIBUAT. DEPOSIT ADALAH
BERTUJUAN PEMBELIAN BARANGAN DAN ALATAN KELENGKAPAN PEMASANGAN ALAT ELEKTRIK.

5.0 BAKI 30% DARIPADA JUMLAH HARGA AKHIR DIATAS MESTILAH DIBAYAR KETIKA SEMUA KERJA PEPASANGAN SIAP DAN BAKI 10%
MESTILAH DIBAYAR KETIKA SEMUA KERJA PENGUJIAN SELESAI DILAKSANAKAN.

6.0 KAMI AKUI KENYATAAN DI ATAS ADALAH BENAR.

( KONTRAKTOR ELEKTRIK/PENYEDIA PERKHIDMATAN ) ( PENGGUNA PERKHIDMATAN//CLIENT/OWNER )


NAMA : NAMA :
NO. I/C : NO. I/C :
NO. TEL : NO. TEL :
TARIKH : TARIKH :

Zulkifli Bin Masri


13/6/2016

You might also like