ABB SAKTI INDUSTRI Q24IV003A

Date: Revision: Replaces: Page:


150811 - 10 - 09 1 of 3
Prepared by: QA Reviewed by: Approved by: Valid for:

EP

WORK INSTRUCTION FAT


For Inspection on MV and LV - Switchgear
No. Inspection Type Scope of Inspection Requirement Reff

1 Visual / Physical Inspection 1. Check on all of mechanical assembly


of:
a. Main switchgear (CB, DS/LBS, ES, Complete & correct as determined in Design drawing & Spec’s.
Mech box, Contactor, etc) the drawing & project specs.
b. Measuring transformers (CT & PT)
c. Measuring instruments (Ammeter, Visually no damage & no oil leakage. Design drawing & Spec’s.
Vmeter, KWH, Wmeter, etc)
d. Protection relays & aux. Components
(ON/OFF push button, Ass, Vss, etc)
e. Cubicle parts & accessories (bottom
plate, end cover, field control, etc)
f. Control wiring (wire size, colour of
cable, terminal number, cable
marking, etc)
2. Check on the dimension of panel Conform to dimension specified in the Design drawing & Spec’s
drawing.
ABB SAKTI INDUSTRI Q24IV003A
Date: Revision: Replaces: Page:
150811 - 10 - 09 2 of 3
Prepared by: QA Reviewed by: Approved by: Valid for:

EP

2 Functional Test 1. Mechanical Operation Tests on: Mechanically operated 5 times in each IEC 298, Sub-clause 7.102
a. Circuit Breaker / Contactor direction, in order to ensure that the Design drawing & specs.
b. DS / LBS switching device & removable parts
c. ES comply with the prescribed operating
d. Mechanical Interlocking conditions and that mechanical
e. Mechanical tripping interlocks work properly.

2. Electrical Function on: The Electrical components and other IEC 298, Sub-clause 7.105
a. Electrical operation (on & off, interlocks together with control devices Design drawing & Spec’s
remote & local, etc) having predetermined sequence of
b. Electrical interlocking operation shall be tested five times in
c. Protection relay succession in the intended condition of
d. Motorized LBS use and operation.
Motorized operation must be integrated Design drawing & Spec’s
with the applied system
ABB SAKTI INDUSTRI Q24IV003A
Date: Revision: Replaces: Page:
150811 - 10 - 09 3 of 3
Prepared by: QA Reviewed by: Approved by: Valid for:

EP

3 Final Visually Check. 1. Cleanness All the above Test has been passed. Design drawing,
2. Cubicle accessories All performance conforms to Project specification and Bill of
Spec’s & Design drawing. Material (BOM)