Test Location:: Radio Network Optimization Report
Test Location:: Radio Network Optimization Report
Test Location:: Radio Network Optimization Report
Test Location:
Optimization Report
Test Route:
Contents
1. INTRODUCTION ...................................................................................................................................3
2. FINDINGS: ............................................................................................................................................4
2.1.1 TEST ROUTE OVERVIEW:..............................................................................................................4
3.1 WCDMA BAND ......................................................................................................................................5
3.1.1 MS1 RSCP PLOT: ..........................................................................................................................5
3.1.2 MS1 EC/NO PLOT:.........................................................................................................................5
3.1.3 MS1 UE TX POWER PLOT: ............................................................................................................6
3.1.4 WCDMA SERVING CELL PLOT: ......................................................................................................6
4.1 GSM BAND ............................................................................................................................................7
4.1.1 MS2 RXLEV PLOT: ........................................................................................................................7
4.1.2 MS2 RXQUAL PLOT: ....................................................................................................................7
4.1.3 MS2 SQI PLOT: ............................................................................................................................8
4.1.1 MS2 GSM SERVING CELL PLOT: ....................................................................................................8
5.1 WCDMA BAND ......................................................................................................................................9
5.1.1 MS1 INDOOR RSCP PLOTS (PRE & POST): .....................................................................................9
5.1.2 MS1 INDOOR EC/NO PLOTS (PRE & POST): ...................................................................................9
5.2 GSM BAND .......................................................................................................................................... 10
5.2.1 MS1 INDOOR RXLEV PLOTS: ...................................................................................................... 10
5.2.2 MS1 INDOOR RXLEV PLOTS: ...................................................................................................... 10
6.1 NETWORK EVENTS (OUTDOOR) ........................................................................................................ 11
6.2 ELEVATION PROFILE .......................................................................................................................... 11
6.1 OBSERVATIONS AND RECOMMENDATIONS ...................................................................................... 12
Page 2 of 12
Drive Test &Optimization Report
Location:
Test Route:
1. Introduction
The drive test route was OYSEMA SECTION, ADJACENT TO HEAD OF SERVICE OFFICE, OYO STATE GOVERNMENT
SECRETARIA; IBADAN and was tested on 21st October 2014 and the analysis follows immediately.
Page 3 of 12
Drive Test &Optimization Report
Location:
Test Route:
2. Findings:
2.1.1 Test Route Overview:
OYSEMA OFFICE
Page 4 of 12
Drive Test &Optimization Report
Location:
Test Route:
PRE POST
PRE
POST
Page 5 of 12
Drive Test &Optimization Report
Location:
Test Route:
PRE POST
PRE POST
Page 6 of 12
Drive Test &Optimization Report
Location:
Test Route:
PRE POST
PRE POST
Page 7 of 12
Drive Test &Optimization Report
Location:
Test Route:
PRE POST
PRE POST
Page 8 of 12
Drive Test &Optimization Report
Location:
Test Route:
Page 9 of 12
Drive Test &Optimization Report
Location:
Test Route:
Page 10 of 12
Drive Test &Optimization Report
Location:
Test Route:
Page 11 of 12
Drive Test &Optimization Report
Location:
Test Route:
Improvements observed in the first floor 3G coverage after up-tilt of OY0916J from 6 to 2.
Secretariat is located on a downslope from OY0916J.
Coverage was very poor in the basement offices, with no improvement observed after
varying tilt adjustments on OY0916J and OY0087G.
3G and 2G boosters recommended to further improve user experience within the secretariat
offices and to enhance coverage in the basement offices.
Page 12 of 12