Bucasan, Danny Boy E. (Accomplishment Report)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Republic of the Philippines

Province of Nueva Vizcaya


Smith Bell Mini Hydro Corporation
-oo0oo-

ACCOMPLISHMENT REPORT

PROBLEM ACTION TAKEN

Vines along the perimeter fence and Bermuda  Removing the vines and grasses along
grass at the switchyard the perimeter fence and bermuda’s
inside the switchyard

GENERAL CLEANING AT THE POWER


HOUSE
Dust and Muds in the Power House  Removing webs in the ceiling
 Washing and sweeping the muds
 Dusting the generator sets
 Vacuum cleaning of cubicles
 Cleaning of canals

Rusts and loosed bolts at the Penstock  Scraping the Old paint and apply a
new one
 Tightening the bolts

Algaes and muds at the Tail Race  Drain the water by the use of water
pump and remove the algaes and the
muds

Leak at the Bypass  Dismantling the bypass and welded


the hole then back to its original
position
 Dismantling the Guide vanes and
Rusty Mavs and Guide Vanes and turbine sanding to remove rust then apply
over speed grease and recalibrate the wicket gates
and mavs.

ALARM MESSAGES
 Busbar earth fault  Acknowledge the alarm then reset the
 Mains not ok isometer when the unit is offline
 Acknowledge the alarm and restart
the unit

BUCASAN, DANNY BOY E.


TRAINEE
SUPPORTING DOCUMENTS

You might also like