DESIGN OF JETTY HEAD/TRESTLE DECK SLABS

1.0 DESIGN PARAMETERS

Characteristic Strength of Concrete = 40 N/mm2


Characteristic Yield Strength of Reinforcement = 410N/mm2
Concrete Density = 24kN/m2
Exposure Condition : Very severe
Cover to Reinforcement: 50mm
Assumed bar size = 12mm

2.0 PRELIMINARY SIZING

Span , L = 6000mm
Basic L/d =26 (Continuous slab)
Assume modification factor =1.4
Minimum Effective Depth, d = Span/(Basic l/d x M.F) =6000/(26x1.4)=165
Overall depth of slab = 165+50+12/2= 2
Try 200mm thick slab
3.0 LOADING
200mm slab = 0.2 x 24 = 4.8kN/m2
Nominal dead load , gk = 4.8kN/m2
Nominal live Load, qk = 7.5kN/m2
Total Service Load = 1.0 x4.8+1.0X7.5=12.3kN/m2
Total Ultimate Load = 1.4x4.8+1.6x7.5 =18.75kN/m2

3.0 BENDING MOMENTS AND SHEARS


3.1 Trestle Slab
Effective Span =3m
At the serviceability limit state,
Moment due to dead Load =0.125x 4.8x32= 5.4kNm/m run
Moment due to live Load =0.125x7.5x32=8.4375kNm/m run
Shear force due to dead load=0.5x4.8x3=7.2kN/m run
Shear force due to live load=0.5x7.5x3=11.25kN/m run
At the Ultimate limit state,
Moment due to dead Load =0.125x 4.8x32x1.4= 7.56kNm/m run
Moment due to live Load =0.125x7.5x32x1.6=13.5 kNm/m run
Shear force due to dead load=0.5x4.8x3x1.4=10.1kN/m run
Shear force due to live load=0.5x7.5x3x1.6=18kN/m run
Design Moment= 7.56+13.5=21.1knM/m run
Job No Sheet No Revision Member Drw. Ref

Design Shear Force=1o.1+18 =28.1kN/m run


(See Computer printout for Section Analysis and Reinforcement Details)

4.0 JETTY HEAD DECK SLAB


One-Way Spanning slab – 3 Spans of 3m
Effective Span , L =3m
Allowing 20% redistribution at support, the bending moment , M is given as:
Moment due to dead Load =0.8x5.4= 4.32kNm/m run
Moment due to live Load =0.8x8.4375=6.75 kNm/m run
Shear force due to dead load=1.25x7.2=9kN/m run
Shear force due to live load=1.25x11.25=14.0625kN/m run
At the Ultimate limit state,
Moment due to dead Load =1.4x4.32= 6.048kNm/m run
Moment due to live Load =1.6x6.75=10.8 kNm/m run
Shear force due to dead load=1.4x9=12.6kN/m run
Shear force due to live load=1.6x10.8=17.28kN/m run
(See Computer printout for Section analysis and reinforcement Details)

5.0 DESIGN OF BEAMS


5.1 Preliminary Sizing
Span , L = 6000mm
Basic L/d =20.8 (Continuous beam, flanged))
Assume modification factor =1.4
Minimum Effective Depth, d = Span/(Basic l/d x M.F) =6000/(20.8x1.4)=165
Assumed bar size - main bar -20mm , stirrup-10mm
Overall depth of slab = 206+50+12/2= 2
Try 200mm thick slab
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE
Job No Sheet No Revision Member Drw. Ref
CNL/2018-36 1 of 25 01 General Arrangement
Job Title Proposed Jetty for A.A Rano Made by: FIO Date: 27/06/18 Checked: M.E

CALCULATION REFERENCE

You might also like