Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

› For 2G, Power control modified settings implemented in One MBU; availability degraded from 30th

April, DCR, Availability graph shown), ICC feature Implemented on One MBU (VQI Shown) and
Parameter tuning of handover Margin(value was increased, OHSR shown) was implemented on
13 relations.
› For 3g, CQI feedback was reduced to d8 on U900 Cells (8 Cells). MPO Constant and
CQI ADJ BY DYN BLEr WAS IMPLEMENTED IN STEPS ON One City for throughput
improvement, however no major gains observed.

You might also like