Batch Memo

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

GEPCO

M.No: ___________/ Dated: ______/2018

The Executive Engineer,

GEPCO City Division No # 1 Skt.

Sub: 3-Phase Defective Meter’s


Please find herewith Result of M&T against following A/c No’s and list of defective 3/phase against
batch no 24 for further process.

M&T Results
Sr. No A/c No’s Percentage Slow
1 03-12415-0071004 33%
2 21-12415-1749000 33%
3 24-12415-0128800 66%
4 24-12415-1661400 33%
5 27-12415-1802400 33%
6 29-12415-0235002 33%
7 24-12415-1178600 1.5%
8 24-12415-1399901 1.5%
9 24-12415-1552300 1.5%
10 24-12415-1556700 1.5%
11 24-12415-1661400 1.5%

List of Defective Meter’s against Batch No # 24

Sr. A/c No’s Discrepancies Sr. A/c No’s Discrepancies


No No
1 24-12415-0437701 Screen wash 14 24-12415-0129000 Screen Dim
2 24-12415-1118203 Opened 15 24-12415-0164602 Screen Dim
3 24-12415-1400000 Screen wash 16 24-12415-0320401 Wash
4 24-12415-1798400 Burnt 17 24-12415-0648601 Burnt
5 24-12415-0437000 Flash 18 24-12415-0864401 Wash
6 24-12415-0791401 Screen wash 19 24-12415-0912200 Wash
7 24-12415-0188900 Burnt 20 24-12415-0953004 Wash
8 24-12415-1118206 Opened 21 24-12415-1057102 Wash
9 24-12415-1438800 Opened 22 24-12415-1059300 Wash
10 24-12415-1060100 Wash 23 24-12415-1127301 Wash
11 24-12415-1104600 Error 24 24-12415-1555800 Wash
12 24-12415-1568700 Error 25 24-12415-1773200 Wash
13 24-12415-1662600 wash 26 24-12415-1798400 Wash

S.D.O GEPCO
Naika Pura S/Div Skt

You might also like