Engineering Practices Laboratory Sample Question Paper
1) using plumbing
components like pipes, elbows, reducers, gate valves.
Figure. 1
2. Prepare the water line connection to the tap as shown in the Fig. 2 from the main water line
using GI pipes, GI reducers, valves and clamps.
Figure. 2
3. Prepare the water line connection to the tap as shown in the Fig. 3 from the main water line
using PVC pipes, PVC reducers, valves and clamps.
Figure. 3
4. Prepare threads on the GI pipe using threading die, pipe vice and prepare the plumbing