OM Turbine

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Sub-supplier Documentation

Delivery Specification

Show Info

D
Operation and Maintenance Documentation

B-No.:

Documents

IEC Code
BB

Included
Project Name:
Document Tab
KKS Designation:
AB02 List of Documents
CJJ10-50 1
Equipment Name:
FP01 List of Warnings
Control Cubicles 2
We reserve all rights in this document and in the information contained therein.

© Demag Delaval Industrial Turbomachinery AB

DC02 Installation and Assembly


3
Reproduction, use or disclosure to third parties without express authority is

Instructions
Supplier:
DC07 Commissioning Instructions
ABB 4
Supplier Doc. Reference:
DC03 Operating Instructions
CC_xxxx_En_01 5
Supplier Order No.:
AB02 Drawings
1000525 (Overview and/or Assembly drawing) 6
Supplier Article No. or Type:
PB01 Component List
7
strictly forbidden.

Steam Turbine (for the drawings above)

● AB02 Component Documentation


8
(with List of Contents)
SIEMENS Purchase Order & pos.
DC05 Maintenance Instructions
9
SIEMENS Supplier Code:
PB01 Operation Consumables List
10208 10
SIEMENS Article No.:
PB02 Recommended Spare Parts
11
DE02 Other Documentation
12

Instructions, tab 2, 5 and 9—as well as corresponding


parts under tab 8—must be translated to end user
language, see Instruction 9630-3.

The content of this document has been reviewed by:


Supplier SIEMENS

............................................... ...............................................

2003-08-28

You might also like