No Uraian

DIVISI 1. UMUM
1.1 Mobilisasi
1.2 Pembersihan
1.3 Rambu Keselamatan Lalulintas
1.4 Papan Nama Proyek
1.5 Direksikeet

DIVISI 2. PEKERJAAN TANAH


2.1 Galian Batu
2.2 Timbunan Pilihan dari sumber galian

DIVISI 3. STRUKTUR
3.1 Beton mutu rendah fc’10 Mpa (K.125)
3.2 Baja Tulangan U 24 Polos
3.3 Beton mutu rendah fc’15 MPa (K.175)

DIVISI 4. DRAINASE
4.1 Anyaman Filter Plastik

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Perekat - Aspal Cair (LAPEN)
5.2 Lapis Pondasi/Perata Penetrasi Macadam
5.3 Bahan Aspal untuk Pekerjaan Pelaburan
5.4 Agregat Penutup BURTU
5.5 Lapis Perekat - Aspal Cair (AC-WC)
5.6 Laston Lapis Aus (AC-WC)
STA 3+449 - 3+500
P = 51
L = 4.5
T rigid = 0.2
T B0 = 0.05

Vol. timbunan =

Vol. B0 = 11.475 m3

Vol. rigid = 45.9 m3

Vol. besi beton Ø 10 =


Berat besi beton Ø 10 = 0.4 kg/m
kbtuhan panjang =
membujur = 1530 30.00 30.00
lintang = 1530 340.00 340.00
3060

Berat total = 1224 Kg

STA 3+500- 3+600


P = 100
L = 4.5
T rigid = 0.2
T B0 = 0.05

Vol. timbunan =

Vol. B0 = 22.5 m3

Vol. rigid = 90 m3

Vol. besi beton Ø 10 =


Berat besi beton Ø 10 = 0.4 kg/m
kbtuhan panjang =
membujur = 3000 30.00 30.00
lintang = 3001.5 666.67 667.00
6001.5
Berat total = 2400.6 Kg

STA 3+600- 3+669


P = 69
L = 4.5
T rigid = 0.2
T B0 = 0.05

Vol. timbunan = 25.0977 81%

Vol. B0 = 15.525 m3

Vol. rigid = 62.1 m3

Vol. besi beton Ø 10 =


Berat besi beton Ø 10 = 0.4 kg/m
kbtuhan panjang =
membujur = 2070 30.00 30.00
lintang = 2070 460.00 460.00
4140

Berat total = 1656 Kg


DIVISI 1. UMUM
No Pekerjaan
1.1 Mobilisasi
1.2 Pembersihan
1.3 Rambu Keselamatan Lalulintas
1.4 Papan Nama Proyek
1.5 Direksikeet

DIVISI 2. DRAINASE
No Pekerjaan
2.1 Anyaman Filter Plastik
Plastik
STA 3+449 - 3+500
STA 3+500- 3+600
STA 3+600- 3+669

DIVISI 3. PEKERJAAN TANAH


No Pekerjaan
3.1 Galian Batu

3.2 Timbunan Pilihan dari sumber galian

DIVISI 4. PERKERASAN ASPAL


No Pekerjaan
4.1 Agregat Penutup BURTU
luas lapen = 12.00
3.00
13.00
5.00

4.2 Bahan Aspal untuk Pekerjaan Pelabur


t= 0.15
4.3 Lapis Perekat - Aspal Cair (AC-WC)
t= 0.15

4.4 Laston Lapis Aus (AC-WC)


2.284
0.04

4.5 Lapis Perekat - Aspal Cair (LAPEN)


0.25

4.6 Lapis Pondasi/Perata Penetrasi Maca


0.05
DIVISI 5. STRUKTUR
No Pekerjaan
5.1 Beton mutu rendah

STA 3+449 - 3+500

STA 3+500- 3+600

STA 3+600- 3+669

5.2 Beton mutu rendah fc’10 Mpa (K.125)

5.3 Baja Tulangan U 24 Polos


STA 3+449 - 3+500
STA 3+500- 3+600
STA 3+600- 3+669
Pekerjaan Volume Satuan
1 Ls
an 1 Ls
selamatan Lalulintas 1 Ls
ma Proyek 1 Ls
t 1 Ls

Pekerjaan Volume Satuan


Filter Plastik
4.9
3+500 P = 51 1078 M2
3+600 P = 100
3+669 P = 69

Pekerjaan Volume Satuan

P = 4.5
13.5 M3
L = 10
T = 0.15
Pilihan dari sumber galian
P = 4.5
9.00 M3
L = 10
T = 0.1

Pekerjaan Volume Satuan


enutup BURTU
luas AC = 473.50 luas burtu = 461.50
465.00 462.00
440.00 427.00
180.40 175.40 2,126.44 M2
176.34 176.34
445.10 224.40
139.80 139.80
60.00 60.00
al untuk Pekerjaan Pelaburan
labur = 69.23
69.30
64.05
26.31 318.97 Liter
318.97 Liter
26.45
33.66
20.97
9.00
kat - Aspal Cair (AC-WC)
perekat AC = 71.03
69.75
66.00
27.06
26.45 488.38 Liter
66.77
67.50
63.86
20.97
9.00
pis Aus (AC-WC)
AC-WC = 43.26
42.48
40.20
16.48
16.11 297.45 Ton
40.66
41.11
38.89
12.77
5.48
kat - Aspal Cair (LAPEN)
perekat lapen = 3.00
0.75
3.25
1.25
1.00 32.00 Liter
4.75
3.50
8.25
6.00
0.25
dasi/Perata Penetrasi Macadam
lapen = 0.60
0.15
0.65
0.25
0.20 6.40 M3
0.95
6.40 M3

0.70
1.65
1.20
0.05

Pekerjaan Volume Satuan


u rendah fc’15 MPa (K.175)
P= 51
L= 4.5 volume ridgid = 45.9
T rigid = 0.2
P 100
198 M3
L 4.5 volume ridgid = 90
T rigid 0.2
P 69
L 4.5 volume ridgid = 62.1
T rigid 0.2
u rendah fc’10 Mpa (K.125)
4.50 M3
B0 (K-125) = 2.25
gan U 24 Polos
3+500 berat total = 1224
5280.60 Kg
3+600 berat total = 2400.6
3+669 berat total = 1656
HARGA DASAR SATUAN UPAH
-
HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN
( Rp.) ( Rp.)

1. Pekerja (L01) Jam 8,571.43 Rp 60,000.00


2. Tukang (L02) Jam 10,714.29 Rp 75,000.00
3. Mandor (L03) Jam 12,142.86 Rp 85,000.00
4. Operator (L04) Jam 12,142.86 Rp 85,000.00
5. Pembantu Operator (L05) Jam 8,571.43 Rp 60,000.00
6. Sopir / Driver (L06) Jam 10,714.29 Rp 75,000.00
7. Pembantu Sopir / Driver (L07) Jam 8,571.43 Rp 60,000.00
8. Mekanik (L08) Jam 10,714.29 Rp 75,000.00
9. Pembantu Mekanik (L09) Jam 8,571.43 Rp 60,000.00
10. Kepala Tukang (L10) Jam 12,142.86 Rp 85,000.00

DAFTAR
HARGA DASAR SATUAN BAHAN
#REF!

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Beton (Kasar) M01a M3 Rp 250,000.00 Base Camp


Pasir Urug (ada unsur
2 M01d M3 Rp 80,000.00 Base Camp
lempung)
3 Agregat Pecah Kasar M3 Rp 250,000.00 Base Camp
4 Lolos screen1 ukuran ( 0 - 5) M04a M3 Rp 144,000.00 Base Camp
5 Lolos screen2 ukuran ( 0 - 5) M04 M3 Rp 202,000.00 Base Camp
6 Lolos screen2 ukuran ( 5 - 9,5) M03 M3 Rp 177,000.00 Base Camp
7 Filler M05 Kg Rp 1,700.00 Base Camp
8 Batu Belah 10/15 M07 M3 Rp 221,000.00 Base Camp
9 Aspal M10 Kg Rp 8,700.00 Base Camp
10 Kerosen / Minyak Tanah M11 Liter Rp 15,000.00 Base Camp
11 Semen / PC (40kg) M12 Zak Rp 52,000.00 Base Camp
12 Kawat Beton M14 Kg Rp 15,100.00 Base Camp
13 Sirtu M16 M3 Rp 90,000.00 Base Camp
14 Paku M18 Kg Rp 15,000.00 Base Camp
15 Kayu Perancah M19 M3 Rp 2,264,000.00 Base Camp
16 Solar M21 Liter Rp 7,000.00
17 Minyak Pelumas / Olie M22 Liter Rp 57,000.00
18 Plastik Filter M23 M2 Rp 2,500.00 Base Camp
19 Baja Tulangan (Polos) U24 M39a Kg Rp 8,500.00 Base Camp
48 Chipping (kg) M41kg Kg Rp 111.00 Base Camp
HARGA PEROLEHAN

KETERANGAN
No.

1
2
3
4
5
6
7
8
9
10
11
12
13
HARGA PEROLEHAN ALAT

Harga Harga Sumber


Jenis Alat yang Data
digunakan

Asphalt Mixing Plant 2,310,000,000 2,310,000,000


Asphalt Finisher 450,000,000 450,000,000
Asphalt Sprayer 25,000,000 25,000,000
Compressor 4000-6500 L\M 75,000,000 75,000,000
Concrete Mixer 0.3-0.6 M3 45,000,000 45,000,000
Dump Truck 410,000,000 410,000,000
Generator Set 179,000,000 179,000,000
Wheel Loader 1.0-1.6 M3 1,074,000,000 1,074,000,000
Three Wheel Roller 6-8 T 187,000,000 187,000,000
Tandem Roller 6-8 T. 475,000,000 475,000,000
Tire Roller 8-10 T. 275,000,000 275,000,000
Water Tanker 3000-4500 L. 150,000,000 150,000,000
Asphalt Distribution 1,000,000 1,000,000
Keterangan

Sesuai dengan peraturan


dan ketentuan yang
berlaku
(Perpres yg berlaku)
ITEM PEMBAYARAN NO. :7.1 (8)
JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
SATUAN PEMBAYARAN :M3

No. URAIAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Kadar Semen Minimum

7 Perbandingan Air/Semen Maksimum


8 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
9 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku

2. ALAT
2.a. CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.

Kap. Prod. / jam = V x Fa x 60


1000 x Ts

Koefisien Alat / M3 = 1 : Q1

2.b. WATER TANK TRUCK


Volume Tanki Air
Kebutuhan air / M3 beton
Faktor Efiesiensi Alat
Kapasitas pompa air

Kap. Prod. / jam = pa x Fa x 60


1000 x Wc

Koefisien Alat / M3 = 1 : Q2

ITEM PEMBAYARAN NO. :7.1 (8)


JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
SATUAN PEMBAYARAN :M3

No. URAIAN
2.c. ALAT BANTU
Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1

Kebutuhan tenaga : - Mandor


- Tukang
- Tk Batu = 1
- Tk Kayu = 1
- Pekerja

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 0.0 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
ITEM PEMBAYARAN NO. :7.1 (10)
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa
SATUAN PEMBAYARAN :M3

No. URAIAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Kadar Semen Minimum
7 Perbandingan Air/Semen Maksimum
8 Perbandingan Camp. : Semen
: Pasir
: Kerikil Pecah
9 Berat Isi :
- Beton
- Semen
- Pasir
- Kerikil Pecah (Agregat Kasar)

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05
1.e. Kayu Perancah
1.f Paku

2. ALAT
2.a. CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk

- Menuang
- Tunggu, dll.

Kap. Prod. / jam = V x Fa x 60


1000 x Ts

Koefisien Alat / M3 = 1 : Q1

2.b. WATER TANK TRUCK


Volume Tanki Air
Kebutuhan air / M3 beton
Faktor Efiesiensi Alat
Kapasitas pompa air

Kap. Prod. / jam = pa x Fa x 60


1000 x Wc

Koefisien Alat / M3 = 1 : Q2

ITEM PEMBAYARAN NO. :7.1 (10)


JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa
SATUAN PEMBAYARAN :M3

No. URAIAN

2.c. ALAT BANTU


Alat bantu

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1

Kebutuhan tenaga : - Mandor


- Tukang
- Tk Batu = 1
- Tk Kayu = 1
- Pekerja

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 0.0 / M3
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3

ITEM PEMBAYARAN NO. : 7.3 (1)


JENIS PEKERJAAN :Baja Tulangan U 24 Polos
SATUAN PEMBAYARAN : Kg

No. URAIAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan

II. URUTAN KERJA


1 Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
2 Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Baja Tulangan (Polos) U24
1.b. Kawat beton

2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya

3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja

Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA

SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 Kg.
Analisa EI-718

URAIAN ANALISA HARGA SATUAN

KODE KOEF. SATUAN KETERANGAN

L 1.50 KM
Tk 7.00 jam
Ks 288 Kg/M3

Wcr 0.66 -
Sm 288.0 Kg/M3 Berdasarkan
Ps 798.8 Kg/M3 JMF dari EE
gregat Kasar Kr 1,198.2 Kg/M3

D1 2.40 T/M3
D2 1.25 T/M3
D3 1.30 T/M3
D4 1.40 T/M3

(M12) 296.640 Kg
(M01a) 0.5850 M3 838.74
(M03) 0.8987 M3 1,258.11
(M19) 0.1000 M3
(M18) 0.8000 Kg

(E06)
V 500.00 liter
Fa 0.75 -
Ts
T1 8.00 menit
T2 4.00 menit
T3 2.00 menit
T4 3.00 menit
Ts 17.00 menit

Q1 1.324 M3/jam

(E06) 0.7556 jam

(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.75 -
Pa 100.00 liter/menit

Q2 23.68 M3

(E23) 0.0422 jam

Berlanjut ke hal. berikut.

Analisa EI-718

URAIAN ANALISA HARGA SATUAN


Lanjutan

KODE KOEF. SATUAN KETERANGAN


Qt 9.26 M3

M 1.00 orang
Tb 2.00 orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
P 2.00 orang

(L03) 0.7556 jam


(L02) 1.5111 jam
(L01) 1.5111 jam
Analisa EI-7110

URAIAN ANALISA HARGA SATUAN

KODE KOEF. SATUAN KETERANGAN

L 1.50 KM
Tk 7.00 jam
Ks 250 Kg/M3
Wcr 0.60 -
Sm 288.0 Kg/M3 Berdasarkan
Ps 633.0 Kg/M3 JMF dari EE
Kr 1,207.0 Kg/M3

D1 2.40 T/M3
D2 1.25 T/M3
D3 1.30 T/M3
D4 1.40 T/M3

(M12) 296.640 Kg
(M01a) 0.5113 M3
(M03) 0.9053 M3 Agregat Kasar
(M19) 0.0500 M3
(M18) 0.5000 Kg

(E06)
V 350.00 liter
Fa 0.75 -
Ts
T1 8.00 menit
T2 4.00 menit

T3 2.00 menit
T4 3.00 menit
Ts 17.00 menit

Q1 0.926 M3

(E06) 1.0794 jam

(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.75 -
Pa 100.00 liter/menit

Q2 23.68 M3

(E23) 0.0422 jam

Berlanjut ke hal. berikut.

URAIAN ANALISA HARGA SATUAN


Lanjutan

KODE KOEF. SATUAN KETERANGAN

(E20)

Qt 6.49 M3

M 1.00 orang
Tb 2.00 orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
P 2.00 orang

(L03) 1.0794 jam


(L02) 2.1587 jam
(L01) 2.1587 jam
Analisa EI-731

URAIAN ANALISA HARGA SATUAN

KODE KOEF. SATUAN KETERANGAN


L 1.50 KM
Tk 7.00 jam
Fh 1.10 -

(M39a) 1.1000 Kg
(M14) 0.0025 Kg

Ls

Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang
P 3.00 orang

M x Tk ) : Qt (L03) 0.0350 jam


Tb x Tk ) : Qt (L02) 0.0350 jam
P x Tk ) : Qt (L01) 0.1050 jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. :7.1 (8)
JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
SATUAN PEMBAYARAN :M3

PERKIRAAN HARGA JUML


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARG
(Rp.) (Rp.

A. TENAGA

1. Pekerja (L01) jam 1.5111 8,571.43


2. Tukang (L02) jam 1.5111 10,714.29
3. Mandor (L03) jam 0.7556 12,142.86

JUMLAH HARGA TENAGA


B. BAHAN

1. Semen (M12) Kg 296.6400 1,300.00


2. Pasir beton (M01a) M3 0.5850 250,000.00
3. Agregat Kasar (M03) M3 1.1982 250,000.00
4. Kayu Perancah (M19) M3 0.1000 2,264,000.00
5. Paku (M18) Kg 0.8000 15,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1. Conc. Mixer E06 jam 0.7556 86,631.92


2. Water Tanker E23 jam 0.0422 281,108.12
3. Alat Bantu Ls 1.0000 2,299.05

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

: PENINGKATAN JALAN WILAYAH TENGAH


KEGIATAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
PAKET PEKERJAAN : KECAMATAN MARON
LOKASI : KABUPATEN PROBOLINGGO
KABUPATEN :7.1 (10)
ITEM PEMBAYARAN NO. :Beton mutu rendah fc’= 10 Mpa
JENIS PEKERJAAN :M3
SATUAN PEMBAYARAN
PERKIRAAN HARGA JUML
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARG
(Rp.) (Rp.

A. TENAGA

1. Pekerja (L01) jam 2.1587 8,571.43


2. Tukang (L02) jam 2.1587 10,714.29
3. Mandor (L03) jam 1.0794 12,142.86

JUMLAH HARGA TENAGA


B. BAHAN

1. Semen (M12) Kg 296.6400 1,300.00


2. Pasir beton (M01a) M3 0.5113 250,000.00
3. Agregat Kasar (M03) M3 0.9053 250,000.00
4 Kayu Perancah (M19) M3 0.0500 2,264,000.00
5 Paku (M18) Kg 0.5000 15,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1. Conc. Mixer E06 jam 1.0794 86,631.92


2. Water Tanker E23 jam 0.0422 281,108.12
3. Alat Bantu Ls 1.0000 2,299.05

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
Analisa EI-731

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

: PENINGKATAN JALAN WILAYAH TENGAH


KEGIATAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
PAKET PEKERJAAN : KECAMATAN MARON
LOKASI : KABUPATEN PROBOLINGGO
KABUPATEN : 7.3 (1)
ITEM PEMBAYARAN NO. :Baja Tulangan U 24 Polos
JENIS PEKERJAAN : Kg
SATUAN PEMBAYARAN

PERKIRAAN HARGA JUML


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARG
(Rp.) (Rp.

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1050 8,571.43


2. Tukang (L02) jam 0.0350 10,714.29
3. Mandor (L03) jam 0.0350 12,142.86

JUMLAH HARGA TENAGA

B. BAHAN

Baja Tulangan
1. (Polos) U24 (M39a) Kg 1.1000 8,500.00
2. Kawat Beton (M14) Kg 0.0025 15,100.00

JUMLAH HARGA BAHAN

C. PERALATAN

1. Alat Bantu Ls 1.0000 102.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
Analisa EI-718

UAN

JUMLAH
HARGA
(Rp.)

12,952.38
16,190.48
9,174.61

38,317.47

385,632.00
146,250.00
299,550.00
226,400.00
12,000.00

1,009,990.65

65455.22844444
11,869.01
2,299.05

79,623.29

1,127,931.40
112,793.14
56,396.57
1,297,121.11
1,297,121.00
Analisa EI-7110

UAN

JUMLAH
HARGA
(Rp.)

18,503.40
23,129.26
13,106.58

54,739.24

385,632.00
127,817.31
226,312.50
113,200.00
7,500.00

860,461.81

93,507.47
11,869.01
2,299.05

107,675.53

1,023,861.87
102,386.19
51,193.09
1,177,441.15
1,177,441.00
Analisa EI-731

JUMLAH
HARGA
(Rp.)

900.00
375.00
425.00

1,700.00

9,350.00
37.75

9,387.75

102.00

102.00

11,189.75
1,118.98
559.49
12,868.21
12,868.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING H

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 3.2.(2a)
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber Galian
SATUAN PEMBAYARAN : M3

NO. KOMPONEN SATUAN

A. TENAGA

1. Pekerja (L01) Jam


2. Mandor (L03) Jam

JUMLAH HARGA TEN

B. BAHAN

1. Sirtu (M16) M3

C. PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E08) Jam
3. Motor Grader (E13) Jam
3. Tandem (E17) Jam
4. Water Tanker (E23) Jam
5. Alat Bantu Ls

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A +


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 3.1.(2)
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3

PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS

A. TENAGA

1. Pekerja (L01) Jam 0.8395


2. Mandor (L03) Jam 0.1049

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN
1. Compressor (E05) Jam 0.1049
2. Jack Hammer (E26) Jam 0.1049
3. Wheel Loader (E15) Jam 0.0000
4. Excavator (E10) Jam 0.1049
5. Dump Truck (E08) Jam 0.0000
6. Alat bantu Ls 1.0000

UMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
Analisa EI-322

MULIR STANDAR UNTUK


ISA MASING-MASING HARGA SATUAN

N WILAYAH TENGAH
LENANG KIDUL - PEKALEN (R.43)

Sumber Galian

PERKIRAAN HARGA JUMLAH


KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

0.4568 8,571.43 3,915.82


0.1142 12,142.86 1,386.85

JUMLAH HARGA TENAGA 5,302.67

1.1100 90,000.00 99,900.00

JUMLAH HARGA BAHAN 99,900.00

0.0000 480,834.11 0.00


0.0000 303,704.00 0.00
0.0055 538,834.13 2,952.79
0.0161 313,774.75 5,053.19
0.0078 281,108.12 2,186.40
1.0000 318.16 318.16

LAH HARGA PERALATAN 10,510.54

DAN PERALATAN ( A + B + C ) 115,713.21


11,571.32
5,785.66
133,070.19
133,070.00

Analisa EI-312
AR UNTUK
MASING HARGA SATUAN

- PEKALEN (R.43)

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)

8,571.43 7,195.77
12,142.86 1,274.25

MLAH HARGA TENAGA 8,470.02

UMLAH HARGA BAHAN 0.00

173,561.20 18,213.21
22,296.00 2,339.70
480,834.11 0.00
524,192.47 55,007.85
303,704.00 0.00
508.20 508.20

H HARGA PERALATAN 76,068.97

TAN ( A + B + C ) 84,538.99
8,453.90
4,226.95
97,219.83
97,219.00
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 6.1 (2)(a)
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 8,571.43


2. Mandor (L03) Jam 0.0004 12,142.86

JUMLAH HARGA TENAGA

B. BAHAN

1. Aspal (M10) Kg 0.8487 8,700.00


2. Kerosene (M11) liter 0.2060 15,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1. Asp. Distribu E41 Jam 0.0002 298,558.10


2. Compressor E05 Jam 0.0002 173,561.20

LAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
Analisa EI-621

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 6.2 (1)
JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1176 8,571.43


2. Mandor (L02) Jam 0.0118 12,142.86

JUMLAH HARGA TENAGA

B. BAHAN

1. Chipping (M41) Kg 23.0000 111.00

JUMLAH HARGA BAHAN

C. PERALATAN

1. Wheel Load E15 Jam 0.0118 480,834.11


2. Dump Truck E08 Jam 0.0183 303,704.00
3. P. Tyre Rolle E18 Jam 0.0004 310,485.47
4. Alat Bantu Ls 1.0000 69.08

LAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN

Analisa EI-635a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 6.3(5a)
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2222 8,571.43


2. Mandor (L03) Jam 0.0222 12,142.86

JUMLAH HARGA TENAGA

B. BAHAN

Lolos
screen2
1. M3 0.4289 177,000.00
ukuran
( 9.5 - 19,0)
Lolos
screen2
2. (M04) M3 0.2281 202,000.00
ukuran ( 0 -
5)
3 Semen/ Fille (M05) Kg 21.0000 1,700.00
4 Aspal (M10) Kg 60.7700 8,700.00

JUMLAH HARGA BAHAN

C. PERALATAN
1. Wheel Load E15 Jam 0.0093 480,834.11
2. AMP E01 Jam 0.0222 4,962,918.82
3. Genset E12 Jam 0.0222 468,860.92
4. Dump Truck E08 Jam 1.4792 303,704.00
5. Asp. Finishe E02 Jam 0.0154 303,147.78
6. Tandem Roll E17 Jam 0.0195 313,774.75
7 P. Tyre Rolle E18 Jam 0.0065 310,485.47
8 Alat Bantu Ls 1.0000 130.48

LAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN

Analisa EI-662

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


PAKET PEKERJAAN : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
LOKASI : KECAMATAN MARON
KABUPATEN : KABUPATEN PROBOLINGGO
ITEM PEMBAYARAN NO. : 6.6.(2)
JENIS PEKERJAAN : Lapis Pondasi/Perata Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1667 8,571.43


2. Mandor (L03) Jam 0.0167 12,142.86

JUMLAH HARGA TENAGA

B. BAHAN

1. Agregat Kas (M03) M3 1.9158 177,000.00


2. Agregat Hal (M04) M3 0.4201 202,000.00
3 Aspal (M10) Kg 103.0000 8,700.00

JUMLAH HARGA BAHAN


C. PERALATAN

1. Wheel Load E15 Jam 0.0083 480,834.11


2. Dump Truck E09 Jam 0.0770 543,707.42
3. 3-Wheel Roll E16 Jam 0.0766 187,543.59
4. Asp. Spraye E03 Jam 0.3788
5. Alat bantu Ls 1.0000 97.86

LAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
Analisa EI-612a

SATUAN

JUMLAH
HARGA
(Rp.)

17.86
5.06

22.92

7,383.86
3,090.00

10,473.86

62.20
36.16

98.36

10,595.14
1,059.51
529.76
12,184.41
12,184.00
Analisa EI-621

SATUAN

JUMLAH
HARGA
(Rp.)

1,008.40
142.86

1,151.26

2,553.00

2,553.00

5,656.87
5,548.26
111.46
69.08

11,385.67

15,089.93
1,508.99
754.50
17,353.42
17,353.00

Analisa EI-635a

SATUAN

JUMLAH
HARGA
(Rp.)

1,904.76
269.84

2,174.60

75,910.56

46,067.58

35,700.00
528,699.00

686,377.14

4,491.23
110,287.08
10,419.13
449,228.83
4,681.72
6,105.76
2,025.17
130.48

587,369.40

1,275,921.15
127,592.12
63,796.06
1,467,309.32
1,467,309.00

Analisa EI-662

SATUAN

JUMLAH
HARGA
(Rp.)

1,428.57
202.38

1,630.95

339,098.91
84,867.16
896,100.00

1,320,066.07
4,006.95
41,854.14
14,357.40
0.00
97.86

60,316.36

1,382,013.38
138,201.34
69,100.67
1,589,315.39
1,589,315.00
PE

KEGIATAN
PAKET PEKERJAAN
LOKASI
KABUPATEN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO. KOMPONEN

A. TENAGA

1. Pekerja
2. Tukang
3. Mandor

B. BAHAN

1. Filter Plastik

C. PERALATAN
1. Alat Bantu

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA


E. PROFIT 10%
F. OVERHEAD 5%
G. JUMLAH HARGA ( D + E + F )
H. HARGA SATUAN PEKERJAAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

: PENINGKATAN JALAN WILAYAH TENGAH


: PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
: KECAMATAN MARON
: KABUPATEN PROBOLINGGO
: 2.4.(2)
: Anyaman Filter Plastik
: M2

PERKIRAAN HARGA
KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

(L01) Jam 0.1556 8,571.43


(L02) Jam 0.0778 10,714.29
(L03) Jam 0.0778 12,142.86

JUMLAH HARGA TENAGA

(M23) M2 1.0500 2,500.00

JUMLAH HARGA BAHAN

Ls 1.0000 186.67

JUMLAH HARGA PERALATAN

ARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


ARGA ( D + E + F )
ATUAN PEKERJAAN
Analisa LI-242

SATUAN

JUMLAH
HARGA
(Rp.)

1,333.33
833.33
944.44

3,111.11

2,625.00

2,625.00

186.67

186.67

5,922.78
592.28
296.14
6,811.20
6,811.00
DAFTAR KUANTITAS DAN HARGA
0

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL-PEKALEN (R.43)
STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No. Mata
Uraian Satuan Volume
Pembayaran

a b c d
DIVISI 1. UMUM
1.1 Mobilisasi Ls 1.00
1.2 Pembersihan Ls 1.00
1.3 Rambu Keselamatan Lalulintas Ls 1.00
1.4 Papan Nama Proyek Ls 1.00
1.5 Direksikeet Ls 1.00

Jumlah Harga Pekerjaan

DIVISI 2. PEKERJAAN TANAH


2.1 Galian Batu M3 13.50
2.2 Timbunan Pilihan dari sumber galian M3 9.00

Jumlah Harga Pekerjaan

DIVISI 3. STRUKTUR
3.1 Beton mutu rendah fc’10 Mpa (K.125) M3 4.50
3.2 Baja Tulangan U 24 Polos M3 5280.60
3.3 Beton mutu rendah fc’15 MPa (K.175) Kg 198.00

Jumlah Harga Pekerjaan

DIVISI 4. DRAINASE
4.1 Anyaman Filter Plastik M2 1078

Jumlah Harga Pekerjaan

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Perekat - Aspal Cair (LAPEN) Liter 32.00
5.2 Lapis Pondasi/Perata Penetrasi Macadam M3 6.40
5.3 Bahan Aspal untuk Pekerjaan Pelaburan Liter 318.97
5.4 Agregat Penutup BURTU M2 2,126.44
5.5 Lapis Perekat - Aspal Cair (AC-WC) Liter 488.38
5.6 Laston Lapis Aus (AC-WC) Ton 297.45

Jumlah Harga Pekerjaan


DAN HARGA

Harga Satuan Jumlah Harga


(Rupiah) (Rupiah)

e f

7,500,000.00 7,500,000.00
750,000.00 750,000.00
200,000.00 200,000.00
250,000.00 250,000.00
4,000,000.00 4,000,000.00
-

12,700,000.00

97,219.00 1,312,456.50
133,070.00 1,197,630.00

2,510,086.50

1,177,441.00 5,298,484.50
12,868.00 67,950,760.80
1,297,121.00 256,829,958.00

330,079,203.30

6,811.00 7,342,258.00

7,342,258.00
12,184.00 389,888.00
1,589,315.00 10,171,616.00
11,041.00 3,521,703.11
17,353.00 36,900,108.11
12,184.00 5,950,372.64
1,467,309.00 436,456,219.63

493,389,907.49
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No. Divisi Uraian

1 Umum
2 Pekerjaan Tanah
3 Struktur
4 Drainase
5 Perkerasan Aspal
(A) Jumlah Harga Pekerjaan
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
(C) Jumlah Total Harga Pekerjaan = (A) + (B)
(D) Dibulatkan

Terbilang : ( Sembilan ratus Tiga puluh juta Enam ratus Dua puluh Tiga ribu Rupiah )
ASI
EKERJAAN

Jumlah Harga
Pekerjaan
(Rupiah)

12,700,000.00
2,510,086.50
330,079,203.30
7,342,258.00
493,389,907.49
846,021,455.29
84,602,145.53
930,623,600.82
930,623,000.00

m ratus Dua puluh Tiga ribu Rupiah )


DURASI PEKERJAAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R
: STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No Uraian Satuan Volume Koefisien Sumber D

a c d Mandor

DIVISI 1. UMUM
1.1 Mobilisasi Ls 1.00
1.2 Pembersihan Ls 1.00
1.3 Rambu Keselamatan Lalulintas Ls 1.00
1.4 Papan Nama Proyek Ls 1.00
1.5 Direksikeet Ls 1.00

DIVISI 2. PEKERJAAN TANAH


2.1 Galian Batu M3 13.50 0.1049
2.2 Timbunan Pilihan dari sumber galian M3 9.00 0.1142

DIVISI 3. STRUKTUR
3.1 Beton mutu rendah fc’10 Mpa (K.125) M3 4.50 1.0794
3.2 Baja Tulangan U 24 Polos Kg 5,280.60 0.0350
3.3 Beton mutu rendah fc’15 MPa (K.175) M3 198.00 0.7556

DIVISI 4. DRAINASE
4.1 Anyaman Filter Plastik M2 1,078.00 0.0778

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Perekat - Aspal Cair (LAPEN) Liter 32.00 0.0004
5.2 Lapis Pondasi/Perata Penetrasi Macadam M3 6.40 0.0167
5.3 Bahan Aspal untuk Pekerjaan Pelaburan Liter 318.97 0.0004
5.4 Agregat Penutup BURTU M2 2,126.44 0.0118
5.5 Lapis Perekat - Aspal Cair (AC-WC) Liter 488.38 0.0004
5.6 Laston Lapis Aus (AC-WC) Ton 297.45 0.0222
N WILAYAH TENGAH
ENANG KIDUL - PEKALEN (R.43)
697 ; P = 3697 M, L = 4,50 M

Koefisien Sumber Daya Produktifitas Ketersiediaan Total


Prioritas Durasi
1 SD TK (oh) Produktifitas

Tukang Pekerja

0.8395 Pekerja 1.1912 3 3.5735 3.7778


0.4568 Pekerja 2.1889 2 4.3779 2.0558

2.1587 2.1587 Pekerja 0.4632 10 4.6324 0.9714286


0.0350 0.1050 Pekerja 9.5238 20 190.4762 27.72315
1.5111 1.5111 Pekerja 0.6618 15 9.9265 19.946667

0.0778 0.1556 Pekerja 6.4286 15 96.4286 11.179259

0.0021 Pekerja 480.0000 1 480.0000 0.0666667


0.1667 Pekerja 6.0000 1 6.0000 1.0666667
0.0021 Pekerja 480.0000 1 480.0000 0.6645124
0.1176 Pekerja 8.5000 15 127.5000 16.677958
0.0021 Pekerja 480.0000 1 480.0000 1.0174499
0.2222 Pekerja 4.5000 8 36.0000 8.2625976
Pembulatan
durasi

1
1
1
1
2

4
2

1
28
20

11

1
1
1
17
1
8
KEBUTUHAN TENAGA KERJA

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R
: STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No Uraian Satuan Volume Koefisien Sumber D

a c d Mandor

DIVISI 1. UMUM
1.1 Mobilisasi Ls 1.00 0.0004
1.2 Pembersihan Ls 1.00 0.0004
1.3 Rambu Keselamatan Lalulintas Ls 1.00 0.0004
1.4 Papan Nama Proyek Ls 1.00 0.0004
1.5 Direksikeet Ls 1.00 0.0004

DIVISI 2. PEKERJAAN TANAH


2.1 Galian Batu M3 13.50 0.1049
2.2 Timbunan Pilihan dari sumber galian M3 9.00 0.1142

DIVISI 3. STRUKTUR
3.1 Beton mutu rendah fc’10 Mpa (K.125) M3 4.50 1.0794
3.2 Baja Tulangan U 24 Polos Kg 5,280.60 0.0350
3.3 Beton mutu rendah fc’15 MPa (K.175) M3 198.00 0.7556

DIVISI 4. DRAINASE
4.1 Anyaman Filter Plastik M2 1,078.00 0.0778

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Perekat - Aspal Cair (LAPEN) Liter 32.00 0.0004
5.2 Lapis Pondasi/Perata Penetrasi Macadam M3 6.40 0.0167
5.3 Bahan Aspal untuk Pekerjaan Pelaburan Liter 318.97 0.0004
5.4 Agregat Penutup BURTU M2 2,126.44 0.0118
5.5 Lapis Perekat - Aspal Cair (AC-WC) Liter 488.38 0.0004
5.6 Laston Lapis Aus (AC-WC) Ton 297.45 0.0222
N WILAYAH TENGAH
ENANG KIDUL - PEKALEN (R.43)
697 ; P = 3697 M, L = 4,50 M

Koefisien Sumber Daya Produktifitas Ketersiediaan Total


Prioritas Durasi
1 SD TK (oh) Produktifitas

Tukang Pekerja

0.0021 480.0000 1 480.0000 0.0021


0.0021 480.0000 1 480.0000 0.0021
0.0021 480.0000 1 480.0000 0.0021
0.0021 480.0000 1 480.0000 0.0021
0.0021 480.0000 5 2400.0000 0.0004

0.8395 Pekerja 1.1912 3 3.5735 3.7778


0.4568 Pekerja 2.1889 2 4.3779 2.0558

2.1587 2.1587 Pekerja 0.4632 10 4.6324 0.9714


0.0350 0.1050 Pekerja 9.5238 20 190.4762 27.7232
1.5111 1.5111 Pekerja 0.6618 15 9.9265 19.9467

0.0778 0.1556 Pekerja 6.4286 15 96.4286 11.1793

0.0021 Pekerja 480.0000 1 480.0000 0.0667


0.1667 Pekerja 6.0000 1 6.0000 1.0667
0.0021 Pekerja 480.0000 1 480.0000 0.6645
0.1176 Pekerja 8.5000 15 127.5000 16.6780
0.0021 Pekerja 480.0000 1 480.0000 1.0174
0.2222 Pekerja 4.5000 8 36.0000 8.2626
Pembulatan Koefisien Sumber Daya lainnya
durasi

Mandor Tukang Pekerja

0.0021 0.0004 0.0021


0.0021 0.0004 0.0021
0.0021 0.0004 0.0021
0.0021 0.0004 0.0021
0.0004 0.0004 0.0021

4 1.4167 11.3333
2 1.0279 4.1116

1 4.8571 2.3301 9.7143


28 184.8210 0.0012 554.4630
20 149.6000 1.1417 299.2000

11 83.8444 0.0060 167.6889

0.1 0.0133 0.0667


1 0.1067 1.0667
1 0.1329 0.6645
17 25.0169 250.1694
1 0.2035 1.0174
8 6.6101 66.1008
No Uraian Kode Predecessor Successor

DIVISI 1. UMUM
1.1 Mobilisasi A - B
1.2 Pembersihan B A C,D
1.3 Rambu Keselamatan Lalulintas C B E
1.4 Papan Nama Proyek D B E
1.5 Direksikeet E C,D F

DIVISI 2. PEKERJAAN TANAH


2.1 Galian Batu F E G
2.2 Timbunan Pilihan dari sumber galian G F H

DIVISI 3. STRUKTUR
3.1 Beton mutu rendah fc’10 Mpa (K.125) H G I,K
3.2 Baja Tulangan U 24 Polos I H,K J
3.3 Beton mutu rendah fc’15 MPa (K.175) J I L

DIVISI 4. DRAINASE
4.1 Anyaman Filter Plastik K H I

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Perekat - Aspal Cair (LAPEN) L J M
5.2 Lapis Pondasi/Perata Penetrasi Macadam M L N
5.3 Bahan Aspal untuk Pekerjaan Pelaburan N M O
5.4 Agregat Penutup BURTU O N P
5.5 Lapis Perekat - Aspal Cair (AC-WC) P O Q
5.6 Laston Lapis Aus (AC-WC) Q P -
JENIS HUBUNGAN
BARCHART KEGIATAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R.43)
: STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No Uraian Durasi Kode Predecessor

1.1 Mobilisasi 1 A -
1.2 Pembersihan 1 B A
1.3 Rambu Keselamatan Lalulintas 1 C B
1.4 Papan Nama Proyek 1 D B
1.5 Direksikeet 2 E C,D
2.1 Galian Batu 4 F E
2.2 Timbunan Pilihan dari sumber galian 2 G F
3.1 Beton mutu rendah fc’10 Mpa (K.125) 1 H G
3.2 Anyaman Filter Plastik 11 I H
3.3 Baja Tulangan U 24 Polos 28 J I
3.4 Beton mutu rendah fc’15 MPa (K.175) 20 K J
5.1 Lapis Perekat - Aspal Cair (LAPEN) 1 L K
5.2 Lapis Pondasi/Perata Penetrasi Macadam 1 M L
5.3 Bahan Aspal untuk Pekerjaan Pelaburan 1 N M
5.4 Agregat Penutup BURTU 17 O N
5.5 Lapis Perekat - Aspal Cair (AC-WC) 1 P O
5.6 Laston Lapis Aus (AC-WC) 8 Q P
AYAH TENGAH
G KIDUL - PEKALEN (R.43)
= 3697 M, L = 4,50 M

Successor
1 2 3 4 5 6 7 8
B
C,D
E
E
F
G
H
I,K
I
J
L
M
N
O
P
Q
-
Bulan Ke - 1
9 10 11 12 13 14 15 16 17 18
19 20 21 22 23 24 25 26 27 28
29 30 31 1 2 3 4 5 6 7
Bulan Ke - 2
8 9 10 11 12 13 14 15 16 17
2
18 19 20 21 22 23 24 25 26 27
28 29 30 31 1 2 3 4 5 6
Bulan Ke - 3
7 8 9 10 11 12 13 14 15 16
Bulan Ke - 3
17 18 19 20 21 22 23 24 25 26
27 28 29 30 31
BARCHART KEGIATAN

KEGIATAN : PENINGKATAN JALAN WILAYAH TENGAH


NAMA PAKET : PENINGKATAN JL. KLENANG KIDUL - PEKALEN (R
: STA. 0+000 - STA. 3+697 ; P = 3697 M, L = 4,50 M
LOKASI : KECAMATAN MARON
TAHUN ANGGARAN : 2017
DANA : APBD

No Uraian Durasi Jumlah

1 Mobilisasi 1
Pekerja 0.0021
Mandor 0.0004
2 Pembersihan 1
Pekerja 0.0021
Mandor 0.0004
3 Rambu Keselamatan Lalulintas 1
Pekerja 0.0021
Mandor 0.0004
4 Papan Nama Proyek 1
Pekerja 0.0021
Mandor 0.0004
5 Direksikeet 2
Pekerja 0.0021
Mandor 0.0004
6 Galian Batu 4
Pekerja 11
Mandor 1
7 Timbunan Pilihan dari sumber galian 2
Pekerja 4
Mandor 1
8 Beton mutu rendah fc’10 Mpa (K.125) 1
Pekerja 10
Tukang 2
Mandor 5
9 Anyaman Filter Plastik 11
Pekerja 168
Tukang 0.01
Mandor 84
10 Baja Tulangan U 24 Polos 28
Pekerja 554
Tukang 1.000
Mandor 185
11 Beton mutu rendah fc’15 MPa (K.175) 20
Pekerja 299
Tukang 1
Mandor 150
12 Lapis Perekat - Aspal Cair (LAPEN) 1
Pekerja 0.07
Mandor 0.01
13 Lapis Pondasi/Perata Penetrasi Macadam 1
Pekerja 1
Mandor 0.1
14 Bahan Aspal untuk Pekerjaan Pelaburan 1
Pekerja 1
Mandor 0.1
15 Agregat Penutup BURTU 17
Pekerja 250
Mandor 25
16 Lapis Perekat - Aspal Cair (AC-WC) 1
Pekerja 1
Mandor 0.2
17 Laston Lapis Aus (AC-WC) 8
Pekerja 66
Mandor 7
AN WILAYAH TENGAH
KLENANG KIDUL - PEKALEN (R.43)
+697 ; P = 3697 M, L = 4,50 M

1 2 3 4 5 6 7 8 9

0.00208333
0.00041667

0.0020833
0.0004167

0.0020833
0.0004167

0.0020833
0.0004167

0.0010417
0.0002083

3 3 3 3
0.375 0.375 0.375 0.375

2 2
0.5 0.5
Bulan Ke - 1
10 11 12 13 14 15 16 17 18

10
2.3985891
5

15 15 15 15 15 15 15 15
0.0005 0.0005411 0.0005411 0.0005411 0.0005411 0.0005411 0.0005411 0.0005411
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5

20 20 20 20 20 20 20 20
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
19 20 21 22 23 24 25 26 27

15 15 15
0.0005411 0.0005411 0.0005411
7.5 7.5 7.5

20 20 20 20 20 20 20 20 20
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
28 29 30 31 1 2 3 4 5

20 20 20 20 20 20 20 20 20
0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67

15 15 15 15
0.0572391 0.0572391 0.0572391 0.0572391
7.5 7.5 7.5 7.5
Bulan Ke -
6 7 8 9 10 11 12 13 14

20 20
0.04 0.04
6.67 6.67

15 15 15 15 15 15 15 15 15
0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Bulan Ke - 2
15 16 17 18 19 20 21 22 23

15 15 15 15 15 15 15
0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391 0.0572391
7.5 7.5 7.5 7.5 7.5 7.5 7.5

0.0133333
0.0666667

1
0.1
24 25 26 27 28 29 30 31 1
1
0.2

1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5


15 15 15 15 15 15 15 15
2 3 4 5 6 7 8 9 10
1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
15 15 15 15 15 15 15 15 15
Bulan Ke - 3
11 12 13 14 15 16 17 18 19
1
0.2

0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8


8 8 8 8 8 8 8 8
20 21 22 23 24 25 26 27 28
29 30 31
No Uraian Durasi

DIVISI 1. UMUM
1.1 Mobilisasi 1
1.2 Pembersihan 1
1.3 Rambu Keselamatan Lalulintas 1
1.4 Papan Nama Proyek 1
1.5 Direksikeet 2
DIVISI 2. DRAINASE
2.1 Anyaman Filter Plastik 11
Filter Plastik
DIVISI 3. PEKERJAAN TANAH
3.1 Galian Batu 4
3.2 Timbunan Pilihan dari sumber galian 2
Sirtu (M16)
DIVISI 4. STRUKTUR
4.1 Beton mutu rendah fc’10 Mpa (K.125) 1
Semen (PC)
Pasir Beton
Agregat Kasar
Kayu Perancah dan/atau Bekisting
Paku
4.2 Baja Tulangan U 24 Polos 28
Baja Tulangan (Polos) U24
Kawat Beton
4.3 Beton mutu rendah fc’15 MPa (K.175) 20
Semen (PC)
Pasir Beton
Agregat Kasar
Kayu Perancah dan/atau Bekisting
Paku
DIVISI 5. PERKERASAN ASPAL
5.1 Lapis Perekat - Aspal Cair (LAPEN) 1
Aspal
Kerosene
5.2 Lapis Pondasi/Perata Penetrasi Macadam 1
Agregat Kasar
Agregat Halus
Aspal
5.3 Bahan Aspal untuk Pekerjaan Pelaburan 1
Aspal
Kerosene
5.4 Agregat Penutup BURTU 17
Chipping
5.5 Lapis Perekat - Aspal Cair (AC-WC) 1
Aspal
Kerosene
5.6 Laston Lapis Aus (AC-WC) 8
Lolos screen2 ukuran ( 9.5 - 19,0)
Lolos screen2 ukuran ( 0 - 5)
Semen/ Filler
Aspal
Jumlah Satuan Biaya Total Biaya

1 2 3 4

1.0500 M2 2,500.00 2,625.00

1.1100 M3 90,000.00 99,900.00

296.64 Kg 1,300.00 385,632.00


0.5113 M3 250,000.00 127,825.00
0.905 M3 250,000.00 226,325.00
0.0500 M3 2,264,000.00 113,200.00
0.5000 Kg 15,000.00 7,500.00

1.1000 Kg 8,500.00 9,350.00


0.0025 Kg 15,100.00 37.75

296.640 Kg 1,300.00 385,632.00


0.5850 M3 250,000.00 146,250.00
1.1982 M3 250,000.00 299,550.00
0.1000 M3 2,264,000.00 226,400.00
0.8000 Kg 15,000.00 12,000.00

0.8487 Kg 8,700.00 7,383.86


0.2060 liter 15,000.00 3,090.00

1.9158 M3 177,000.00 339,098.91


0.4201 M3 202,000.00 84,867.16
103.0000 Kg 8,700.00 896,100.00

0.9760 Kg 8,700.00 8,491.44


0.0659 Ltr 15,000.00 988.80

23.000 Kg 111.00 2,553.00

0.84872 Kg 8,700.00 7,383.86


0.206 liter 15,000.00 3,090.00

0.4289 M3 177,000.00 75,910.56


0.2281 M3 202,000.00 46,067.58
21.000 Kg 1,700.00 35,700.00
60.770 Kg 8,700.00 528,699.00
Bulan Ke -
5 6 7 8 9 10 11 12 13 14
Bulan Ke - 1
15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 1 2 3
4 5 6 7 8 9 10 11 12 13
Bulan Ke - 2
14 15 16 17 18 19 20 21 22 23
24 25 26 27 28 29 30 31 1 2
3 4 5 6 7 8 9 10 11 12
Bulan Ke - 3
13 14 15 16 17 18 19 20 21 22
23 24 25 26 27 28 29 30 31