REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION V
CAMARINES NORTE DISTRICT ENGINEERING OFFICE
F. PIMENTEL AVE., PASIG, DAET, CAMARINES NORTE

CONSTRUCTION OF ACTIVITY CENTER / COVERED COURT


( PHASE-I )
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE

CHECKED & SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED :

AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ


CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SECTION
SUMMARY OF QUANTITIES TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES
ITEM DESCRIPTION UNIT QUANTITY DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

A EARTHWORKS ARCHITECTURAL
803(1)a STRUCTURE EXCAVATION cu.m 79.25
1
· PERSPECTIVE OFFICE OF THE BUILDING OFFICIAL
804(1)a EMBANKMENT ( FROM STRUCTURE EXCAVATION ) cu.m 54.88
A 3 · SUMMARY OF QUANTITIES
1 6 · SITE DEVELOPMENT PLAN
804(1)b EMBANKMENT ( FROM BORROW ) cu.m 375.19
· LOCATION MAP
804(4) GRAVEL FILL FOR FOOTINGS, WALL FOOTINGS AND SLAB ON FILL cu.m 73.40 · PROJECT BILLBOARD
CITY / MUNICIPALITY
B PLAIN AND REINFORCED CONCRETE WORKS
· FLOOR PLAN
CROSS SECTION
2
900(1) b2 STRUCTURAL CONCRETE ( FOOTING AND SLAB ON FILL ) cu.m 77.45 A 3 ·
902(1) a1 REINFORCING STEEL FOR COLUMN FOOTING kgs 1036.54 2 6 · RIGHT SIDE ELEVATION
· LEFT SIDE ELEVATION
900(1) b4 STRUCTURAL CONCRETE FOR COLUMN cu.m 15.86
LINE AND GRADE
902(1)a1 REINFORCING STEEL FOR COLUMN FOOTING kgs 2053.93 · ROOF PLAN
FRONT ELEVATION
3
900(1)b6 STRUCTURAL CONCRETE BEAM cu.m 7.50 A 3 ·
900(1)a1 REINFORCING STEEL FOR CONCRETE BEAM kgs 1344.80 3 6 · REAR ELEVATION
· LONGITUDINAL SECTION
C FORMS AND FALSEWORKS

900(1) FORMS AND FALSEWORKS l.s 1.00


STRUCTURAL
D ROOF FRAMING AND ROOF WORKS 1
S
1047(2)b STRUCTURAL STEEL FOR TRUSSES kgs 10,539.60
3
· GENERAL NOTES
4 6
1047(2)c STRUCTURAL STEEL FOR PURLINS kgs 5608.80
pcs
LAND USE AND ZONING
1047(3)b METAL STRUCTURE ACCESSORIES ( SAGRODS ) 280.00
kgs 549.84
S
2
3
· FOUNDATION PLAN
1047(4) METAL STRUCTURE ACCESSORIES ( CROSS BRACING )
5 6 · ROOF FRAMING PLAN
1014(1)a2 PREPAINTED METAL SHEETS sqm 888.78

E MASONRY WORKS
S
2
3
· DETAIL OF RC BEAM
1046(2)a CHB ( NON LOAD BEARING INCLUDING REINFORCING STEEL ) sqm 106.02
6 6 · DETAIL OF COLUMN FOOTING
F FINISHING WORKS · DETAIL OF WALL FOOTING
1027(1) CEMENT PLASTER FINISH sqm 228.91
· DETAIL OF FULL TRUSS
· DETAIL OF SIDE FRAMING
G SAFETY AND HEALTH PROGRAM · DETAIL CONNECTION OF TRUSS ARCHITECTURAL

PERSPECTIVE B7

80
OCCUPATIONAL SAFETY AND HEALTH PROGRAM month 4.00
· DETAIL OF STRUT

50
CONSTRUCTION OF ( Name of project and location )

90
70
CONTR ACTOR :

50
30
N DATESTARTED :

50
30
CONTRACTCOMPLETIONDATE :

50
STRUCTURAL

30
CONTRACTCOST :

50
30
W E IMPLEMENTINGOFFICE/CONTACTNo. :

50
30
1220
SOURCEOFFUND :

50
A B C D E

170
S 1.20
10.00
20.00
10.00
1.20

7 DEPARTMENT OF

60
30
PUBLIC WORKS AND HIGHWAYS

60
6.00

40
TEXT2920orcall(02)165-02foranyconcernonthisproject
50
SANITARY/PLUMBING
40 30
6 SLOPE SLOPE www.dpwh.gov.ph
6.00

40 320

2440

THIS SITE N
6.00

BUILDING
SCHOOL

W E

BUILDING
SCHOOL
4 0.50mm THK PREPAINTED METAL SLOPE
36.00

SLOPE
SHEETS RIB-TYPE LONG SPAN

ELECTRICAL
6.00

3
CANTEEN SCHOOL
BUILDING
6.00

BUILDING

2
SCHOOL

BUILDING
SCHOOL
SLOPE SLOPE
6.00

SCHOOL SCHOOL
1 BUILDING WATSAN BUILDING
MECHANICAL
GH

GATE GATE
TO LABO RROW TO LABO CENTRO

SITE DEVELOPMENT PLAN VICINITY MAP


SCALE 1:300m SCALE nts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· PERSPECTIVE PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF · SITE DEVELOPMENT PLAN PDS 1
· LOCATION MAP DONNA JEAN T. LACSON, uap A 3
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT · SUMMARY OF QUANTITIES ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) · PROJECT BILLBOARD
CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 1 6
ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE SECTION
ARCHITECT II
A B C D E A B C D E
20.00 1.20 5.50 4.00 5.00 5.50 1.20
6.00 4.00 4.00 6.00
1.50 1.50 APEX OF TRUSS

ROOF EAVES LINE ( SEE DETAIL OF TRUSS )


7

4.00
1.50
1.20

FOR FUTURE EXPANSION TOP OF BEAM


6.00

( NOT INCLUDED )
UP UP
ELEVATED

2.85
1.15 STAGE 1.15
3.30

elev.= +1.00m

4.50

4.50
6 STAGE

0.75 0.90
( NOT INCLUDED )
1.57 15.00 1.57 BLEACHER BLEACHER
( NOT INCLUDED ) ( NOT INCLUDED )
FINISH FLOOR LINE BASKETBALL COURT
NATURAL GRADE LINE
EARTHFILL MATERIALS
( NOT INCLUDED )

( NOT INCLUDED )

0.20
CROSS SECTION
BLEACHER

BLEACHER
6.00

SCALE 1:100m

7 6 5 4 3 2 1
0.50mm THK PREPAINTED METAL
SHEETS RIB-TYPE LONG SPAN

5 APEX OF TRUSS
1' x 1" THK FASCIA BOARD ON A 1"∅
G.I PIPE SCHEDULE 40 FRAME

FOR FUTURE EXPANSION


4.00
6.00

( NOT INCLUDED )
TOP OF BEAM

1.00 1.00 1.00

4
36.00

4.50

0.75 0.90
( NOT INCLUDED )

( NOT INCLUDED )
FFL ( STAGE )
BLEACHER

BLEACHER
BLEACHER

1.40
1.00
( NOT INCLUDED )
6.00

BASKETBALL FIN. FLOOR LINE


28.00

COURT NATURAL GRADE LINE

0.20
LEFT SIDE ELEVATION 0.50mm THK PREPAINTED METAL
SCALE 1:100m
SHEETS RIB-TYPE LONG SPAN
1' x 1" THK FASCIA BOARD ON A 1"∅

3 G.I PIPE SCHEDULE 40 FRAME

1 2 3 4 5 6 7
6.00

APEX OF TRUSS

FOR FUTURE EXPANSION


4.00

( NOT INCLUDED )
TOP OF BEAM
( NOT INCLUDED )

( NOT INCLUDED )
BLEACHER

BLEACHER

1.00 1.00 1.00


6.00

4.50

0.75 0.90

FFL ( STAGE )

1.40
BLEACHER

1.00
1
( NOT INCLUDED )
1.04

FIN. FLOOR LINE


NATURAL GRADE LINE
ROOF EAVES LINE
0.20

FLOOR PLAN RIGHT SIDE ELEVATION


SCALE 1:100m
SCALE 1:100m

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· FLOOR PLAN PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF · RIGHT SIDE ELEVATION PDS 2
· LEFT SIDE ELEVATION DONNA JEAN T. LACSON, uap A 3
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT · CROSS SECTION ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2 6
ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE SECTION
ARCHITECT II
A B C D E 7 6 5 4 3 2 1
1.20 20.00 1.20
APEX OF TRUSS
10.00 10.00

FOR FUTURE EXPANSION


4.00
( SEE DETAIL OF TRUSS )

( NOT INCLUDED )
FOR FUTURE EXPANSION TOP OF BEAM
6.00

( NOT INCLUDED )

4.50
6

0.75 0.90
SLOPE SLOPE
FFL ( STAGE ) STAGE

1.40
BASKETBALL

1.00
FIN. FLOOR LINE COURT
NATURAL GRADE LINE
EARTHFILL MATERIALS

0.20
6.00

LONGITUDINAL SECTION
SCALE 1:100m

A B C D E
0.50mm THK PREPAINTED METAL

5 APEX OF TRUSS
SHEETS RIB-TYPE LONG SPAN
0.50mm THK PREPAINTED
END FLASHING

4.00
6.00

TOP OF BEAM

4 0.50mm THK PREPAINTED METAL SLOPE


36.00

SLOPE
SHEETS RIB-TYPE LONG SPAN

4.50
STAGE
( NOT INCLUDED )
BLEACHER BLEACHER
( NOT INCLUDED ) ( NOT INCLUDED )
6.00

FINISH FLOOR LINE


NATURAL GRADE LINE

0.20
REAR ELEVATION
SCALE 1:100m

3
A B C D E
0.50mm THK PREPAINTED METAL
SHEETS RIB-TYPE LONG SPAN
6.00

APEX OF TRUSS 0.50mm THK PREPAINTED


END FLASHING

4.00

2 SLOPE SLOPE

TOP OF BEAM

2.85
6.00

4.50

4.50
STAGE

0.75 0.90
( NOT INCLUDED )
BLEACHER BLEACHER
( NOT INCLUDED ) ( NOT INCLUDED )
1 FINISH FLOOR LINE
NATURAL GRADE LINE
BASKETBALL COURT
0.20

ROOF FRAMING PLAN FRONT ELEVATION


SCALE 1:100m
SCALE 1:100m

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· ROOF PLAN PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF · FRONT ELEVATION PDS 3
· REAR ELEVATION DONNA JEAN T. LACSON, uap A 6
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT · LONGITUDINAL SECTION ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 3 6
ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE SECTION
ARCHITECT II
GENERAL NOTES
1.0 STANDARDS AND REFERENCES
THE FOLLWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION
GENERAL CONSTRUCTION NOTES NOTE:
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED
IMPLEMENTING RULES AND REGULATION OF R.A. 9184, APPROVAL
BY AUTHORIZED DPWH OFFICIALS OF DETAILED ENGINEERING
OF THE PROJECT.
SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTS NEITHER
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES ( N.S.C.P ) VOL. 1 6TH EDITION RE-HANDLING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR 10mm∅ AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGN NOR
2010 WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM SHALL NOT BE LESS THAN 3.65 METER APART TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
HOPPER TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED OFFICIALS.
2.0 DESIGN CRITERIA 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOUS
SIX ( 6 ) METERS IN AGGREGATE LENGTH.
2.1 LOADING EDGES ) AS SHOWN BELOW.
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS THE DESIGN CONSULTANT SHALL BE HELD FULLY
A. DEAD LOAD 7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mm∅ STEEL RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES /
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
CONCRETE -23.56kN/m³ CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS STRUCTURES DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES
WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
STEEL -76.93kN/m³ MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.
150mm THK. CHB WALL -2.73 kPa 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & A
100mm THK. CHB WALL -2.11 kPa SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
B. LIVE LOAD 6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN ( 7 ) CONSECUTIVE DAYS ∅12 x 1000 LONG @
ROOF -23.56kN/m³ MID-DEPTH OF SLAB TYPICAL DETAIL OF COLUMN LAP SPLICE AND
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING DOWN INTO EDGE BEAM. EXTENDED
ROOMS -76.93kN/m³ COMPOUNDS OR OTHER APPROVED METHODS. 4-∅ 12@ 1800 LONG TOP BARS BEND @ EACH CORNER EXTERIOR GIRDER TO COLUMN CONNECTION
VESTIBULE -2.73 kPa BARS MINIMUM OF 1200 ( 4'-0" ) INTO BARS. 1-∅12 TOP &
7. STRIPPING OF FORMS AND SHORES : LAP SPLICE LENGTH:
C. WIND LOAD ( NSCP 2010 ) FOUNDATION -------------------------------------------------------------------------- 24 hrs. BOTTOM BARS AT ANY LEVEL NO MORE THAN
BASIC WIND VELOCITY V = 250 kph SUSPENDED SLAB EXCEPT WHEN ----------------------------------------------- 8 days 4-∅12 BOTTOM BARS
1-∅12 EA. ALTERNATE BARS SHOULD BE

400
P = qh = [ ( GCpf ) - ( GCpi ) ] ( DESIGN WIND PRESSURE ) ADDITIONAL LOADS ARE IMPOSED SPLICED. MIN. DISTANCE BET.
WHERE: qh = VELOCITY PRESSURE WALLS --------------------------------------------------------------------------------- 24 days TOP & BOTTOM
GCpf= EXTERNAL PRESSURE COEFFICIENT BEAMS --------------------------------------------------------------------------------- 24 days
TWO ADJACENT BARS SPLICES

WITHIN CENTER
GCpi= INTERNAL PRESSURE COEFFICIENT COLUMNS ----------------------------------------------------------------------------- 24 days SHALL BE 600mm.

HALF OF "H"
SLAB

0
38mm

0
OPENING

6
D. SEISMIC LOAD ( NSCP 2010 ) 8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE CLEAR L/4

0
0
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST ( 4 ) DAYS PRIOR TO THE TOP BARS @ SUPPORT (CONT.)

6
V= Cvl W ( DESIGN BASE SHEAR ) POURING FOR APPROVAL. REQ'D. BOTT. BARS @ SUPPORT

400
RT 1-∅12 EA.
Vmax = 2.50 Col W Vmin = 0.11 Col W 9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORING UNTIL TOP & BOTTOM

JT. REINF.
R THE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH
Vmin = 0.80 ZNvl W ( ZONE 4 ) INTO TWO WAY SLAB EXTEND SECTION "A"

D
R BARS UP TO BEAM SUPPORT
WHERE: W = TOTAL DEAD LOAD OMIT TRIMMER BARS WHERE

6
OPENING IS FRAMED BY BEAM

0
T = NATURAL PERIOD = Ct ( Hn )²/³

0
WHERE: C = NUMERICAL COEFFICIENT NOTES ON FOOTINGS
h = BUILDING HEIGHT
TYPICAL SLAB SPLICE BOTTOM BARS AT
I = IMPORTANCE FACTOR = 1.50 1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 96 kpa TYPICAL CORNER SLAB DETAIL OPENING DETAIL MID SPAN
R= NUMERICAL FACTOR = 8.50 ( 2000 psf ). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, THE ACTUAL EXTRA TOP BARS
SIESMIC COEFFICIENT Cv = 0.44Nv SOIL CONDITION UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE
DEPOSITING CONCRETE. NOTES ON COLUMNS NOTES ON BEAMS AND GIRDERS @ SUPPORT
Ca = 0.64Na
NEAR SOURCE FACTOR ( 10km ) Nv = 1.2 2. FOOTINGS SHALL REST AT LEAST 15800mm BELOW NATURAL GRADE LINE UNLESS 1. PROVIDE EXTRA SETS OF TIES AT 100mm OC FOR TIED COLUMN REINFORCEMENT 1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIRDER AT
Na = 1.0 OTHERWISE INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL. ABOVE AND BELOW BEAM - COLUMN CONNECTIONS FOR A DISTANCE FROM FACE LEAST 6mm∅ FOR EVERY 4.50m OF SPAN, EXCEPT CANTILEVERS FOR WHICH THE
Z = SIESMIC ZONE = 0.40 ( ZONE 4 ) OF CONNECTION EQUAL TO THE GREATER OF THE OVERALL THICKNESS OF CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT
S = SOIL TYPE 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR COLUMN, 1 / 6 THE CLEAR HEIGHT OF COLUMN OR 450mm. IN NO CASE LESS THAN 20mm FOR EVERY 3.0m OF FREE SPAN.
FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE
2.2 DESIGN STRESSES DEPOSITED AGAINST A FORMWORK. CAST MONOLITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm 2. TYPICAL BARS BENDING AND CUTTING DETAILS SHALL BE AS SHOWN IN FIG. B - 1
A. CONCRETE AND NOT LESS THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN LAP SPLICES ARE ALLOWED
COMPRESIVE STRENGTH @ 28 DAY fc = 20.7 MPa ( 3,000 psi ) NOTES ON REINFORCEMENT MILLIMETERS. ONLY IN THIS PORTION
B. REINFORCING BARS 1. UNLESS OTHERWISE NOTED IN PLANS, THE STRENGTH OF REINFORCING BARS SHALL BE: 3. WHERE COLUMNS CHANGE SIZE, VERTICAL REINFORCEMENTS SHALL BE OFFSET L1 L2 L3
a. FOR BARS 16mm∅ AND GREATER A. FOOTINGS, FOOTING BEAMS AND GIRDERS -------------- fy = 275 mpa ( 40,000 psi ) AT A SLOPE OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL BE L2/3 L2/3 L3/3 L3/3
b. FOR BARS LESS 16mm∅ fy = 275 MPa ( 40,000 psi ) B. COLUMNS AND SHEAR WALLS ------------------------------- fy = 275 mpa ( 40,000 psi ) PROVIDED THRU OUT THE OFFSET REGION
2D 2D 2D 2D 2D
C. STRUCTURAL STEEL , ASTM-A36 4. UNLESS OTHERWISE INDICATED IN THE PLANS , LAP SPLICES FOR VERTICAL
FOR TRUSSES, BRACING & STRUTS fy = 250 MPa ( 33,000 psi ) C. BEAMS AND GIRDER -------------------------------------------- fy = 275 mpa ( 40,000 psi ) COLUMN REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN
D. NON-LOAD BEARING WALL PARTITION, BEDDED SLABS, FLOOR & ROOF SLABS, HEIGHT, AND THE SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR ∅. WELDING

0.96
D. PURLINS
COLD FORMED LIGHT GAUGE SHAPES fy = 248 MPa ( 35,000 psi ) PARAPET, CATCH BASIN, SIDE WALK ------------------------- fy = 227.5 mpa ( 33,000 psi ) OR APPROVED MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE
E. MASONRY UNITS ( CHB ) THAN ALTERNATE BARS ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL L2/5 L2/5 L3/5 L3/6
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH
NON-BEARING CHB WALL fm = 3.45 Mpa ( 500 psi ) AND THE VERTICAL DISTANCES BETWEEN THESE WELDS OR SPLICES OF
ASTM A 706. BARS SMALLER THAN 10mm MAY PLAIN.
F. WELD-USED E-60xx ELECTRODE ADJACENT BAR IS NOT LESS THAN 600mm WEB BARS
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE 2-12mm∅ SIDE BARS BOTTOM BARS
G. STRUCTURAL BOLTS, ASTM-A307 H
TOP BARS
a. Ft = 69.60 MPa ( 14,000 psi ) WITH TABLE A. & TABLE B ( TABLE OF LAP SPLICE & ANCHORAGE LENGTH ) UNLESS OTHERWISE
SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. CROSS-TIE
b. fv = 69 MPa ( 10,000 psi ) TABLE "A" TABLE "B"

350mm MAX.
TENSION BARS COMPRESSION BARS
GENERAL NOTES EMBEDMENT LENGTHS AND LAPPED EMBEDMENT LENGTHS AND LAPPED
SPLICES IN MILLIMETERS SPLICES IN MILLIMETERS

10
1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN

d
NOTES ON CONCRETE SLABS

H
fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi) fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi)

mi
AND DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. BAR SIZE BAR SIZE

n.
(DEFORMED) EMBEDMENT LAPPED (DEFORMED) EMBEDMENT LAPPED
2. IN REFERENCE TO THE DRAWING, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS EMBEDMENT LAPPED EMBEDMENT LAPPED

IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM 10mmØ 300 300 300 300 10mmØ 225 300 200 300
OF DRAWING ETC. TOP OF SLAB. 12mmØ 300 300 300 300 12mmØ 275 300 250 300
3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATION BETWEEN 2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS SLAB SHALL BE CUT AS
16mmØ 300 400 300 400 16mmØ 350 400 325 400
THE STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY FOLLOWS.
JOINT HOOP SPACE @ "2Sh" WHEN THERE ARE 20mmØ 20mmØ

CONF. REINF.
BOTH THE STRUCTURAL ENGINEER AND THE ARCHITECT. 400 550 350 500 450 500 475 500
4. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE ACI. 318 95 BUILDING BEAMS HAVING WIDTH OF AT LEAST ONE-HALF THE 25mmØ 25mmØ

D
600 800 550 750 550 625 550 625
CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK COLUMN WIDTH & DEPTHS NOT LESS THAN THREE
28mmØ 750 1000 650 850 28mmØ 625 675 625 675
ACCORDING WITH AISC SPECIFICATION ( 9th EDITION ) IN SO FAR AS THEY DO NOT CONFLICT
L1 L2 QUARTERS OF THE DEEPEST BEAM THAT FRAME
INTO FOUR SIDES OF THE COLUMN. ALL OTHER

JOINT REINF.
L1/3 L1/3 L2/3 32mmØ 950 1300 850 1100 32mmØ 700 775 700 775
WITH THE LOCAL BUILDING CODE REQUIREMENT. TOP BAR TOP BAR CONDITIONS USE HOOP @ "Sh" CENTER
5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO THE
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS. FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE AS
6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN IN A TABLE "A" FOR TENSION BARS AND TABLE "B" FOR COMPRESSION BARS UNLESS

CONF. REINF.
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITION. L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR SPECIFIED IN PLAN. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN. AT LEAST TWO

Sh
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL,
STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS
APPROVAL BEFORE FABRICATION. FOR COL. BAR SPLICES SEE TABLE OF MIN. LAP 4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mm ∅ BAR SEPARATORS
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS,

COLUMN TIES AS
TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS SPLICE LENGTH OF COLUMN REINFORCEMENT

PER SCHEDULE
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, SPACED AT 1.0m ON CENTER IN NO CASE SHALL THERE BE LESS THAN TWO
(SPACING OF TIES ALONG THIS REGION SHALL NOT ( 2 ) SEPARATORS BETWEEN TWO LAYERS OF BARS.
ELECTRICAL AND MECHANICAL DRAWINGS. BE LESS THAN 100mm)
9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES BE AS
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER.
3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED SHOWN IN FIG. B - 2 UNLESS SPECIFIED ELSEWHERE.

CONF. REINF.
NOTES ON CONCRETE MIXES & PLACING BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN b

Sh
FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN

D
LOCATION
STRIPS SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS
1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF
NOTE:

t
JOINT REINF.
TWENTY EIGHT ( 28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION MAIN REINFORCEMENT
FOLLOW. 28 DAYS STRENGTH MAXIMUM SIZE OF MAXIMUM SLUMP AND SHALL NOT BE LESS THAN 0.0025 x GROSS CROSS-SECTIONAL AREA ( Ag ) OF THE SLAB ALL CONCRETE REINF. DETAIL SHOULD BE see note
WEB BARS
( SEE SCHEDULE BELOW ) DONE IN ACCORDANCE WITH THE LATEST see note

ht
ALL OTHERS, INCLUDING

t or 1/4D
AGGREGATE
4000 psi ( 27.6 mpa ) EDITION OF ACI DETAILING MANUAL.

t
SUSPENDED SLABS 20mm 100mm SLEEVES FOR UTILITY

CONF. REINF.
COLUMNS 4000 psi ( 27.6 MPA ) 20mm 100mm PIPES MAX 1/5D

D
D
BEAMS, SLABS 4000 psi ( 27.6 MPA ) 20mm 100mm SCHEDULE OF MINIMUM SLAB REINFORCEMENT
SLAB ON FILL 3000 psi ( 27.6 MPA ) 20mm 100mm 0.025m∅ SEPARATOR
THICKNESS MINIMUM TEMPERATURE BARS see note PROVIDE 3-10∅ EXTRA STIRR.
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS EACH SIDE OF SLEEVES
SUSPENDED SLABS ------------------------------------------------------------------ 20mm 100mm 10mm∅ @ 250mm EACH WAY
TYPICAL COLUMN ELEVATION SHOWING 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM
SLAB ON GRADE ----------------------------------------------------------------------- 40mm 125mm 10mm∅ @ 225mm EACH WAY REINFORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
WALLS ABOVE GRADE --------------------------------------------------------------- 25mm DOWELS AND TIES SPACING
BEAM STIRRUPS AND COLUMN TIES ----------------------------------------------- 40mm 150mm 10mm∅ @ 185mm EACH WAY
7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
WHERE CONCRETE IS EXPOSED TO 175mm 10mm∅ @ 150mm EACH WAY STRESSES OCCUR, SPLICES WHERE NO PERMITTED SHALL BE INDICATED IN THE TABLE "A"
EARTH BUT POURED AGAINST FORMS -------------------------------------------- 50mm LAP SPACE LENGTH: AND "B" WELDED SPLICES SHALL BE DEVELOP IN TENSION AT LEAST 125% OF THE
WHERE CONCRETE IS DEPOSITED 200mm 10mm∅ @ 140mm EACH WAY AT ANY LEVEL NO MORE THAN ALTERNATE BARS SHOULD BE SPLICED MIN. SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE
DIRECTLY AGAINST THE EARTH ----------------------------------------------------- 75mm DISTANCE BETWEEN TWO ADJACENT BARS SPLICES SHALL BE 600mm. SECTION IS ALLOWED TO BE SPLICED THEREIN.
CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· GENERAL NOTES PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF PDS 1
DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 4 6
ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE SECTION
ARCHITECT II
A B C D E A B C D E
20.00 1.20 20.00 1.20
6.00 4.00 4.00 6.00 10.00 10.00
1.50 1.50 5.50 4.00 5.00 5.50

7 7 TRUSS-1 TRUSS-1

1.50
1.20

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
FOR FUTURE EXPANSION FOR FUTURE EXPANSION

RCB-1

RCB-1
6.00

6.00
( NOT INCLUDED ) ( NOT INCLUDED )
ELEVATED
STAGE

3.30
elev.= +1.00m
C1F1 C1F1

6 WF 6 TRUSS-1 TRUSS-1
3.00

12mm∅ ROUND BARS SAGROD


w/ STD. NUTS AND WASHERS

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
2" x 6" x 2.5mm THK G.I PURLINS

RCB-1

RCB-1
6.00

6.00
WF

WF
SPACED @ 0.84m

16mm∅ ROUND BARS X-BRACING


STANDARD TURNBUCKLE
3.00

( TYPICAL EVERY OTHER BAY )


C1F1 C1F1

5 5 TRUSS-1 TRUSS-1
3.00

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
RCB-1

RCB-1
6.00

6.00
WF

WF
3.00

C1F1 C1F1

4 4 TRUSS-1 TRUSS-1
36.00

36.00
3.00

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
RCB-1

RCB-1
100mm THK SLAB-ON-FILL
6.00

6.00
WF

WF
elev.= +0.20m
3.00

C1F1 C1F1

3 3 TRUSS-1 TRUSS-1
3.00

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
RCB-1

RCB-1
6.00

6.00
WF

WF
3.00

C1F1 C1F1

2 2 TRUSS-1 TRUSS-1
3.00

STRUT-3
STRUT-2

STRUT-2
STRUT-1

STRUT-1
RCB-1

RCB-1
6.00

6.00
WF

WF
3.00

C1F1 C1F1

1 1 TRUSS-1 TRUSS-1

WF
FOUNDATION PLAN ROOF FRAMING PLAN
SCALE 1:100m SCALE 1:100m

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· LEFT SIDE ELEVATION PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF · RIGHT SIDE ELEVATION PDS 2
DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 5 6
ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE SECTION
ARCHITECT II
CL 3"∅ G.I PIPE SCHEDULE 40
( BOTTOM CHORDS ) 0.40
1.20 10.00
0.30
5.50 4.00 0.50 2 21 "∅ G.I PIPE SCHEDULE 40 0.15
0.76 0.72 0.67 ( TOP CHORDS )
0.50 0.50 0.40
0.50 2"∅ G.I PIPE SCHEDULE 40

0.15
0.50
0.60 0.84 0.53 ( WEB MEMBERS )
0.84
0.60
0.84
0.60

0.40

0.40
APEX OF TRUSS 0.84
0.84
0.84

0.40
0.84

0.15
0.84
0
0.5 0.50 0.15
0.84

SECTION
1.07
0.8
4 DETAIL OF TRUSS-1 SPOT DETAIL "A"
SCALE: 1:15m

0.65
SCALE 1:25m
150mm X 150mm X 12mmTHK MS BASE PLATE w/
8 0.8
4 4-16mm BOLT w/ NUTS & WASHERS
1.0
0.50mm THK PREPAINTED METAL
SHEETS RIB-TYPE LONG SPAN
4
0.8
0.50mm THK PREPAINTED
1.0
3 END FLASHING
4 2"∅ G.I PIPE SCHEDULE 40
3.70

0.8
( TOP & INSIDE FRAME )
4.00

3"∅ G.I PIPE SCHEDULE 40


( BOTTOM CHORDS )
84
0.

1.38
84
0. 3"∅ G.I PIPE SCHEDULE 40
( BOTTOM CHORDS )

1.38
4.15
2 21 "∅ G.I PIPE SCHEDULE 40
68
0. ( TOP CHORDS )
2"∅ G.I PIPE SCHEDULE 40
20
0. ( WEB MEMBERS )

1.38
1.10
LC 150mm X 50mm X 15mm X 3mm THK
G.I PURLINS
0.50mm THK PREPAINTED METAL
0.30

SHEETS RIB-TYPE LONG SPAN 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40
TOP OF BEAM 22.40
12mm∅ THREADED SAGRODS
COMPLETE w/ NUTS AND WASHERS
DETAIL OF SIDE FRAME
0.50

300mm X 300mm X 12mm THK 6.00


SCALE 1:60m
MS BASEPLATE w/ 6-16mm∅ 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
ANCHORBOLT w/ NUTS AND
0.45
WASHERS
0.30

0.40
0.25
STRUT 3
0.45 2"∅ G.I PIPE SCHEDULE 40
2.20 ( TOP & BOTTOM CHORDS )
6.00 2"∅ G.I PIPE SCHEDULE 40
0.10
NOTE : 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 ( WEB MEMBERS )
TIE JOINTS ( WHETHER HOOKS OR 6.00
WELDS ) SHOULD BE ROTATED TO REDUCE 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
0.45
0.25

THE RISK OF FAILURE DUE TO SPALLING.


RCB-1

1.10
0.10

0.65
10mm∅ TIES & INNER LOOP
SPACED, 4@50mm; 4@100mm;
4@150mm& REST @200mm,O.C. STRUT 2
0.05 0.20 0.05
STRUT 1 2"∅ G.I PIPE SCHEDULE 40
TYPICAL 2"∅ G.I PIPE SCHEDULE 40 ( TOP & BOTTOM CHORDS )
10mm∅ TEMPBARS SPACED @
( TOP & BOTTOM CHORDS )
0.40m O.C, BOTHWAYS DETAIL OF TRUSS ANCHORAGE 2"∅ G.I PIPE SCHEDULE 40
SCALE 1:25m
2"∅ G.I PIPE SCHEDULE 40 DETAIL OF STRUT ( WEB MEMBERS )
FINISH FLOOR LINE 100mmTHK SLAB-ON-FILL ( WEB MEMBERS ) SCALE 1:40m
0.20

1.50 4"THK CHB WALL


NATURAL GRADE LINE FIN. FLOOR LINE
0.45 PLASTERED FINISH

0.20
EMBANKMENT BAR X NAT.GRADE LINE
10mm∅RSB STIRRUPS SPACED:
4@50mm, 4@100mm, 4@150mm, 6.00 10mm∅ HORIZONTAL BARS
& VERTICAL BARS SPACED

0.60
& REST@200mm O.C L=5.55m
14-20mm∅ MAINBARS
0.075

L/4=1.39m L/4=1.39m @ 0.40m


0 C
L 3-12mm∅ EQUALLY

0.20
.4 0.25 0.25
0 WF1 SPACED BARS
1.75

11-16mm∅ BASEBARS
0.45
1.50

EQUAL SPACES BOTHWAYS 0.40


0.50

0.50

DETAIL OF WALL FOOTINGS


0.075

SCALE 1:30m
0.075 @ MIDSPAN @ SUPPORT
COLUMN L/5=3.70m MAINBARS L/5=3.70m
6-16mm ∅ MAINBARS
FOOTING EXTRABARS NOTE:
2-16mm ∅ EXTRA CUTBAR
PLAN BAR X
0.35

SECTION PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED


IMPLEMENTING RULES AND REGULATION OF RA 1984; APPROVAL BY
THE AUTHORIZED DPWH OFFICIALS OF DETAILED ENGINEERING
DETAIL OF COLUMN FOOTING DETAIL OF RC-BEAM SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTS NEITHER
0.10

GRAVEL BEDDING DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICAL
EARTHFILL MATERIALS SCALE 1:25m SCALE 1:30m INTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART
OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.
SECTION / ELEVATION

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
Ar.ARC
REPUBLIC OF THE PHILIPPINES
· DETAIL OF RC BEAM
PREPARED / DESIGNED BY :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF · DETAIL OF COLUMN FOOTING
PDS 3
· DETAIL OF WALL FOOTING DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER ACTIVITY CENTER / COVERED COURT · DETAIL OF FULL TRUSS ARCHITECT / SPECIAL AGENT
AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
( PHASE-1 ) · DETAIL OF SIDE FRAMING CHECKED BY :
ENGINEER III - CHIEF, PLANNING & DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 6 6
· DETAIL CONNECTION OF TRUSS ELMER CEZAR A. ZALETA, uap
MUNICIPALITY OF LABO, LABO, CAMARINES NORTE · DETAIL OF STRUT SECTION
ARCHITECT II