RAPID Draft v3.61
RAPID Draft v3.61
Internal
Involved PIC Remarks
All Fathin
All Hj Paimin
All Aznam
All Mike Gibb
All Satisy
All En Hyffny
All En Reza
Shafik En Hisam
Hafetz Joanna
Afi/Khoo Mr Muthu
Shafik Mira
All Fathin
All Mike Gibb
All Hamka
All Acap/Zita
All En. Zul
All Robert & Frenk
All En. Jamin
All En. Mark
All Frenk
All
All
Internal
Action Item PIC
Internal
Logbook RAPID Attachment (1/3/18 - 12/3/18)
Date Day
3/1/2018 Thursday
Internal
3/2/2018 Friday
Internal
3/3/2018 Saturday
Internal
3/4/2018 Sunday
Internal
3/5/2018 Monday
Internal
3/6/2018 Tuesday
3/7/2018 Wednesday
Internal
3/8/2018 Thursday
Internal
3/9/2018 Friday
Internal
3/18 - 12/3/18)
Activ
1. Mass Toolbox Talk
- Four language (Eng, Malay, Tamil, Bangla)
- Previous incident happened (floodlight caught on fire, cable fall, falling from height)
- Focused recognitions
- ZeTo Rules (Quiz)
Internal
1. Toolbox Talk Tour/Site Visit (En. Ghazali)
- Most rotating equipment is housed (protected by a fixed structure - because of weather condition)
- The recently commisioned PCP (Pengerang Co-generation Plant), have 4 massive gas turbines, of which 2 of them
are already running. SIEMENS was responsible for the construction of the PCP.
- Turbine (regardless gas or steam type) is only the prime mover, the shaft will transmit the kinetic energy into any
load e.g compressor & power generator
- The purpose of the PCP is to supply electricity and power to PIC, and the surplus will be sold to TNB (Tenaga
Nasional Berhad).
- concept of PCP (gas turbine) : External motor is required during the start of the operation to compress the air-
fuel mixture. Once temperature is self-sustaining for combustion to occur and drive the compressor, external
motor will be shut down. The gas ignited causes fluid (air) temperature to rise, essentially expanding, producing
hot jet stream in constricted flow, turning the shaft and drives the compressor to draw in more air, sustaining the
continuous combustion. The surplus of kinetic energy will turn the generator turbine blades which in turn
produces electricity. On the other hand, the waste heat from the gas will be channeled to waste heat boiler in
order to produce HP steam from Demin water. HP steam can be step down further to satisfy demand of MP, LP
and LLP steam.
- This is why it's called Co-gen. Cuz there are 2 types of boiler:
1) Waste Heat Boiler
2) Auxiliary Boiler
Consequence management of transportation in RAPID
Internal
1. Management walkabout with Mike
- Went for a site visit at P6A (LLDPE Project) by Samsung Engineering
- Divided into two separate groups, where each group went to separate section of the site.
- Mike emphasised that this walkabout is not about finding and putting blame onto anyone, rather, to provide
assistance to the contractors.
- Throughout the walkabout, Mike has demonstrated exceptional level of TELL ME, NURTURE TRUST and SHARED
SUCCESS through face-to-face engagement with general labor of multiple nationalities. A few souvenirs were given
to the general labor as token of appreciation for displaying knowledge and awareness on safety.
- Inspection tag in wrong color/ inspection yet to be conducted.
Quarterly color code for inspection
(Jan - Mar: Yellow; Apr- Jun: orange; Jul - Sep: Green; Oct - Dec: Blue; Do not use/ rejected: red)
- Presence of translator reduces language barrier
- One worker was found working with torn jean. This may pose hazard, as it may get stuck while climbing up/down
scaffold. However, he was not working on the scaffold that day.
- To prevent tripping and falling hazards (scaffolding tubes): barricade and signage
- Housekeeping
- Work limit - engineering design document. One pipe spool positioned on top of stands was not labelled with load
capacity. How to ensure the stands can withstand the load if the weight of load is not known/labelled ?
- Condition of PPE. Worker does not know when to replace PPE in case of visible crack/fatigue.
- "Comply and Intervene" with demonstration. Prize given to workers managed to answer the questions.
- STA - specific task assignment
Internal
1. Specialist (Bus Inspection)
- There are about 81 white buses (BB, standing bus type). Each can accommodate 95 passengers at one time.
- Bus is manufactured by SKS. Specifications are provided by PETRONAS based on SPAD requirement.
- Since seatbelts are compulsory as per PTS requirement, deviations were deliberated by Group Technical
Authority (GTA) specifically for RAPID project since most of the passengers are going to stand during the journey
to/from work. Management of Change (MOC) was initiated as part of the risk assessment and concluded that at
35 km/h, risk of hazard is kept at minimum, hence the installation of electronic speed limiter.
- 5 buses were inspected using HSE HITS checklist. Part of official documentations were required to be displayed at
windscreen, and part is kept inside the bus.
- General bus requiremnets, such as seatbelts (for driver), windshield, rear-view mirrors, electrical system, bus
enginer and tyres, first aid kits, fire extinguishers, breakdown triangle and reflective sticker.
- Bus operators faced challenges as some of the workers steal the bus emergency window hammer breakers, while
some lean on the emergency windows (breaks easily), causing it to accidentally break.
Internal
1. Audit Inspection with En. Muthu
Audit: to review Substation HSE Commissionning Readiness
Audit Scope: HSE compliance within substation including
- LOTO, PTW, IH, OH, ER, Substation safety - to get checklist
Package and Contractor: 22, Punj Lloyd
Documents in substation:
- Single line diagram - circled in red with DG written is Diesel Generator
- Guideline for substitution & FAR building
- Emergency response flow chart for TCF/ Tank area
- Substation emergency map
- PTW
- Competency certificates
- Chargeman info
- Substation team contact number
Note:
1. even temporary energization of substation will fall under precom procedure, so blue tape
2. transition is the period between constrution and precom
3.
Internal
1. Audit Inspection with En. Muthu - Cont.
Findings
- Access control even during construction phase
- Insufficient light for work
- Portable air cond provided for work
- Substation induction conducted for personnel
- Gaps immediately closed by Punj Lloyd after recommendation suggested
- Tripping hazard of scaffolding tubes - barricade immediately
- Pre-com signage: barricade with blue and white tape instead of red and white tape
- Water used for eye wash in UPS cannot be kept overnight due to the possibility of fungi growth. Eye eash was
moved to unconggested area.
- Suggested security should be trained with fire extinguisher.
- Suggested to have a checklist for PPE: check once a week.
Internal
1.1. Walkabout with Dr. Colin and En. Saifuddin in Package 1 CCSM
Drone video shooting with En. Irwan
To increase PIC capacity to deal with a pendemic and to raise awareness among key persons. The main purpose of
this tabletop exercise is to delay the rate of infection and to protect PETRONAS' reputation (as per verbal
communication with Dr. Mazlan).
Internal
1. Confined Space Entry
- Stand-by person and fire watcher can be the same person, depending on situation. Stand-by person is
responsible for the communication with the entry person but is not allowed to enter the confined space. A
standby person has to contact relevant party in case of an emergency. Fire watcher is responsible to put off any
fire and allowed to go into the confined space if it is big enough to fit the entry person and him. A fire-watcher has
to continue look after the work until it is cooled down though the work is stopped.
- Ensure clearance in the entrance to allow exit.
- 4 tests: O2, LEL, toxic gas (CO, NO2) with a similar gas tester, adjust K factor.
Internal
Activity
5. Engagement with En. Ghazali (Head of Specialist)
- To share proposed activities with specialist
- To study the HSE HITS checklist (Scaffolding, Confined Space, Lifting & Rigging, Electricity, Transportation)
CEFS PIC 6 training modules: HAZMAT, breathing apparatus, basic fire protection system, rope rescue, basic industrial fire
fighting and truck loperator training.
Internal
2. Engagement with En. Paimin (Head of Safety, Refinery and Cracker) and Mr. Zulashraf (Safety Engineer)
- to be involved in night walkabout
- to be involved in Area Based Ownership Program (ABOP)
- to attend the RAPID commissioning induction
3. Emergency drills
Incident: Pile collapse
Location: P28B
Parties involved: Contractors, CEFS, CMF
No. of IP: 3
Notes:
- Vast site: all junctions shall be indicated by a flag man.
- IP shall be labelled (ideal situation)
- In the case there is a hole, dont move the pile save the IPs first.
- In the real case (no hole), move the falling pile up and save the IPs.
- During evacuation, make sure movinf fast but not running.
- Do not play handphones.
- crowd control is needed
Internal
2. Management walkabout with Jacob
3. Visit to MCF
- 4 color codes: green (not critical) waiting time 1 hour, yellow, red (immediate treatment), black (deceased)
- the priority of patient attendance is determined using the Triage system according to the color code system above
- 5 emergency bed and 3 normal bed
- approx 15 beds in total (approx 8 in store)
- Day shift: 1 emergency specialist, 13 RMO, 1 OH doctor
- In case of communicable disease: need to notify the government (Ministry of Health)
- Emergency trolley in yellow zones
- 2 type-A ambulances (recommended capacity - 5)
Internal
2. Specialist (Lifting operation)
- Inspected 2 type of crane: Mobile crane and crawler crane
- All drivers need to have the proper license and qualification in order to be competent to operate the crane (RAPID Pass, C
Competency slip)
- Load charts is the schematic or graphical chart which can provide the amount of load allowable for specifc length of boom
arm and working radius.
- If a lifting work requires additional working radius, an additional extension (jib) can be added to increase the working radi
however the amount of load that can be lifted is significantly reduces.
- Rigging and fitting activity can only be executed by trained personnel who have undergone training
- Daily crane inspection needs to be done by the crane operator following a set of checklist specified to the type of crane
- Load Moment Indicator is a system which aids the crane operator by sensing (directly/indirectly) the overturning moment
the equipemnt (load multiplied by radius),
- In the event of a crane lifting over its capacity or over hoist, LMI will trigger the light alarm, followed up by sound alarm an
then shut off power to equipment functions that can increase severity of loading (i.e. hoisting). However, function that
decrease severity remains operation (i.e. lowering)
- Sling used for lifting is color coded
- Tagline is used to maneuver the load to the designated place.
Internal
2. Social Performance (SP) Tier 2 Audit at Punj Lloyd (as observer)
- 2 execs and 1 manager (Joanna) in SP HSE Central Directorate (CD). Camp Audit will have their own Subject Matter Expert
(SME) in various subjects, and from various consultation companies to maintain neutrality. PETRONAS as project owner,
observes, oversees and ensure work is done by the consultant. Most of the worker in Punj LLoyd camp (P-22) is from mainl
India, Pakistan, and Bangladesh. Audit is conducted ever 6 months.
- The team convenes in main meeting room at site and were divided into 4 subdiciplines (Food Quality & Hygiene [FQH],
Health Safety and Environment [HSE], Operation & Maintenance [OM], and Security).
- The team went to the manager's office in the kitchen, and scrutinise the official documents pertaining workers' vaccinatio
for typhoid, medical record). A few of the expiration dates of the typhoid injection were wrong.
- Hazard Analysis and Critical Control Points (HACCP) is widely used to control food quality by attempting to avoid hazards
rather than inspect finished products for the effect of those hazards.
- Storage area for kitchenware were checked. A few of items were not in their correct storage compartment. Kitchen utens
were not supposed to be placed together with food items.
- For every meal, sample of the raw meat/perishable ingredients must be stored for up to atleast 3 days in the freezer and
must be labelled accordingly.
- Monitoring station for pest control must be adequate.
- Procedure for thawing of meat must be correct.
Internal
2. Welfare inspection with Welfare team led by Mr. Edil
- Split into two teams for inspection in two buildings each.
Problems found:
- Malaysian (SMQA) complained food is dry. Request food comes with more sources and gravy
- Water disruption - 10-4pm.
- Vietnamese (MQC) complained about food hygiene. Worm was found in food.
- Inconsistent salary pay.
4. HSE Induction
-
5. EESB 500,000 safe man hour with no LTI at ASU Power Plant
- Safe man hour is not achievable without cooperation from everyone
- the goal is to complete project within goal and budget and so that everyone can go back safely to your loved one
-2.There is no work
Scaffolding that is with
Inspection so important
Nicholas that we cannot
in Samsung take time to do it safely.
Package
- Experience of wearing harness and working at height
- Scaffoding tubes with different color labels - to differentiate between the contractors
- Green tag and red tag
- Check about the angle of ladder
(I didnt really learn much, someone please update ya - Khoo)
Internal
4. Night Walkabout - Package 1 CCSM
- Hazards at night are entirely different than in the day.
- Visibility, fatigue management, and lack of supervision are among the issues.
- Grinder was found without handle
- Scaffolding tubes not properly set aside - tripping and slip hazard
- Fire blanket not being used when welding
- Proper face shield not being used when welding
More problems?
Internal
2. Walkabout with Robert and FrAnk
- Harnesses with no lifeline. Conflcting statement by worker and supervisor.
- PTW violation
- Do not drop object during scaffolding works. Objects must be passes from person to person
- PMA license lasts for 15 months