Lars Enviro Pvt. Ltd.

2014

BUDGETARY PROPOSAL

Biogas Plant for Waste Water - 2600m³/day


&
Biogas Plant for Wet Cake (Pulp) - 230 MT/ day.

GREE Energy Tophill Project,


Bandar Lampung, Indonesia

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Lars Enviro in Brief

 Brains A dedicated team comprising of More


Than 83 Skilled and Experienced Brains

 Offices Corporate office in Nagpur and


Regional Offices in Tamilnadu and
Karnataka

 Assignments More Than 341 Assignments

 Anaerobic Installations More Than 217 Anaerobic Installations.

 Industries Served References in More than 25 types of


industries.

 Associates Associates in number of countries.

 Export Assignments Dubai, Sharjah, Nepal, Sri-Lanka,


Ecuador, Uganda, Turkey, Ghana,
Indonesia, Cambodia, Malaysia,
Ethiopia, Myanmar & Laos.

 Solution Total Wastewater Management and


Recycling Solutions.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

g2’s
Contents

Technical Proposal
I. Basic Design Data
II. Performance Guarantee
III. Treatment Scheme
IV. Process Description
V. Utility Requirements (GREE Scope )
VI. Battery Limits for Lars
VII. Brief Specification of LESAR Reactor
VIII. Lars Scope of Work
IX. PT. Energi Hijau Investama Scope of Work
X. Gree Scope of Work
XI. List of Supply Items (Lars Scope)
XII. List of Civil Units (PT. Energi Hijau Investama Scope)

Commercial Proposal
I. Price
II. Estimated Cost of Work ( Client Scope)
III. Manner of Payment
IV. Mode of Payments
V. Delivery
VI. Validity
VII. Warranty

Annexure – 1 Standard Definitions, Commercial Terms & Conditions.


Annexure – 2 Standard Electrical Specifications.
Annexure – 3 Performance Guarantee Test.
Annexure – 4 List of our Anaerobic Biogas Plant Installations.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Project Notes

 We have adopted 90 percentile effluent values for designing the

plant.
 We have designed few units considering future expansion such as

Buffer Tank & Gas Holder.


 Common advanced Gas Holder for WWTP (with future gas handling

provision) & for Wet Cake biogas.


 Independent Sludge Management System
 Maximum Units in Mild Steel to save civil expenditures.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Technical Proposal

I. Basic Design Data:

a. Biogas Plant for Waste Water

Characteristics of raw wastewater considered for designing the Biogas Plant (LESAR) are
as follows:

Key Converted
Sr. Items Parameters Unit Values / Adopted Unit
(90 Percentile) for design
1 Flow 2600 m3/d 2600 m3/d
2 pH 6.7 - 6.7 -
3 CODt 29.08 kg/m3 29080 mg/L
4 Assumed BOD 14.54 kg/m3 14540 mg/L
5 TSS 11.44 kg/m3 11440 mg/L
6 VSS 11.29 kg/m3 11290 mg/L
7 SO4 62.5 g/m3 62.5 mg/L
8 TP 122.1 g/m3 122.1 mg/L
9 TKN 582.4 g/m3 582.4 mg/L
10 O&G 152.7 g/m3 152.7 mg/L
Deg
11 Assumed Temp Not Given in Enq
36 – 39 C

It is assumed that the effluent does not contain any inhibitory substance for the
biological process. It is also assumed that all other parameters are within acceptable
limits prescribed by the concerned Pollution Controlling authority.

b. Biogas Plant for Wet Cake

Characteristics of pulp (wet cake) considered for designing the Biogas Plant (LESAR) are
as follows:

Pulp

 Qty - 230 MT/day


 Assumed Cyanide Content- Nil
 Assumed Age of cake - 48 hrs (Max)
 Moisture Content - 88.5 %
 Total Solid - 11.5 % (Dry Matter)
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

 Assumed Volatile Solids - 97.0 % (of Total Solids)


 Assumed Sand - 1–2%

Note – To treat above quantity of wet cake / pulp, we have proposed 2 nos. of
Bio-digesters ( LESAR).

It is assumed that the Pulp does not contain any inhibitory substance for the biological
process. It is also assumed that all other parameters are within acceptable limits
prescribed by the concerned Pollution Controlling authority.

II. Performance Guarantee:

a. Biogas Plant for Waste Water


5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

When the plant is subjected to above mentioned parameters, it shall give following
performance at steady state.

 COD Removal - 90 ± 5 %

 BOD Removal - 95 ± 5 %

 pH - > 7.0

 Biogas - 0.475 ± 5 % m3/Kg COD removed @


designed load
 Biogas Qty - Approx. 32500 m3/d ± 5 % @ designed
Load
 Biogas Quality - CH4 – 55 -60 %, CO2 -30 -40 %, H2S
<0.5%, other Gases and Moisture < 1 %

b. Biogas Plant for Wet Cake

When the plant is subjected to above mentioned parameters, it shall give following
performance at steady state.
 Biogas Qty - Approx. 26000 m3/day ± 5 % @ designed
Load (Approx. 1.8 - 2 m3/KG of VS
Reduced)

III. Treatment Scheme:


As per the attached Process Flow Diagram (PFD) for Biogas plant of Wastewater &

Wetcake (pulp).

IV. Process Description:

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

a. Biogas Plant for Waste Water


Raw wastewater from process shall be carried to treatment site by pumping up to buffer
tank by local partner PT. Energi Hijau Investama (EHI).

 Buffer Tank (BT):

In buffer tank the complex organics in the wastewater is subjected to hydrolysis.


Chemicals if required shall be dosed in this tank. The hydrolyzed effluent shall be
pumped from the buffer tank for anaerobic treatment in the LESAR.

 Lars Enviro Stirred Anaerobic Reactor (LESAR):

 It is non media, Continuously Stirrer Tank Reactor (CSTR).

 It is mesophillic reactor i.e. it operates best in temp range of 36 – 39 OC.

 The foundation shall be suitably designed based on local soil type. The floating
type / foundation ensuring equal settlement is the most preferred type of
foundation.
 Reactor will be fabricated at site using mild steel plates and structural members
confirming to relevant grades as per internationally accepted codes.
 The inside of the reactor shall be sand blasted and painted using chlorinated
rubber paint as per standard specifications.
 Reactor outside shall be wire brushed, cleaned / commercial sandblasted and
painted by synthetic enamel or aluminum paint as per client’s preference.
 In LESAR reactor the raw waste is introduced from top of the reactor. The
recycled sludge is also introduced from the top of the reactor. This mixed liquor
travels downward through the central shaft. In this central shaft, agitator
provides adequate mixing of raw waste and recycled sludge. From central shaft
liquor enters reactor near bottom of tank.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

 The reactor content outside central shaft is kept well mixed with set of agitators
located equidistant along the circumference of the reactor. This constant
agitation helps to maintain active, bacteria in suspension. These bacteria utilize
organic matter present in wastewater and produce biogas.
 The solids are separated from the outlet of reactor in Lamella Clarifier and
returned to the system by recirculation pumps. This recirculation of settled solids
helps to maintain adequate population of active bacteria inside reactor.
 The reactor is provided with following accessories to ensure efficient performance
and safety of the reactor:

 Pressure breaker and Vacuum breaker, in case pressure goes out of operating
range.
 Flare stack to flare the biogas generated in case it is not used.
 Gas flow meter for recording the quantity of gas generated.
 The treated effluent of LESAR reactor is discharged from the top of reactor to
utilize head available.
The biogas produced by anaerobic digestion inside the reactor is collected from reactor
roof. Biogas is then transferred to floating type gas holder (Approx. 884 m3). Gas
holder is fitted with all essential safety equipment such as breather valve, flame
arrestor etc. Biogas is then conveyed to blower for further utilization in boiler or biogas
engines.
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

b. Biogas Plant for Wet Cake

Cassava pulp shall be taken to hopper with the help of loaders. Screw mix pumps will
be provided to transfer the pulp to feed sump / mixing tank. Slurry from mixing tank
shall be then feed to the digester.

 Lars Enviro Stirred Anaerobic Reactor (LESAR):

 It is non media, Continuously Stirrer Tank Reactor (CSTR).

 It is mesophillic reactor i.e. it operates best in temp range of 36 – 39 OC.

 The foundation shall be suitably designed based on local soil type. The floating
type / foundation ensuring equal settlement is the most preferred type of
foundation.
 Reactor will be fabricated at site using mild steel plates and structural members
confirming to relevant grades as per internationally accepted codes.
 The inside of the reactor shall be sand blasted and painted using chlorinated
rubber paint as per standard specifications.
 Reactor outside shall be wire brushed, cleaned / commercial sandblasted and
painted by synthetic enamel or aluminum paint as per client’s preference.
 In LESAR reactor the raw waste is introduced from top of the reactor. The
recycled sludge is also introduced from the top of the reactor. This mixed liquor
travels downward through the central shaft. In this central shaft, agitator
provides adequate mixing of raw waste and recycled sludge. From central shaft
liquor enters reactor near bottom of tank.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

 The reactor content outside central shaft is kept well mixed with set of agitators
located equidistant along the circumference of the reactor. This constant
agitation helps to maintain active, bacteria in suspension. These bacteria utilize
organic matter present in wastewater and produce biogas.
 The solids are separated from the outlet of reactor in collection tank and returned
to the system by recirculation pumps. This recirculation of settled solids helps to
maintain adequate population of active bacteria inside reactor.
 The reactor is provided with following accessories to ensure efficient performance
and safety of the reactor:

 Pressure breaker and Vacuum breaker, in case pressure goes out of operating
range.
 Flare stack to flare the biogas generated in case it is not used.
 Gas flow meter for recording the quantity of gas generated.
The biogas produced by anaerobic digestion inside the reactor is collected from reactor
roof. Biogas is then transferred to floating type gas holder (Common for wastewater &
cake). Gas holder is fitted with all essential safety equipment such as breather valve,
flame arrestor etc. Biogas is then conveyed to blower for further utilization in boiler or
biogas engines.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

 Collection Tank:

Treated slurry from digester shall be then enters in to this tank for separation of solids
and liquid. The tank is a hopper bottom tank. In this tank solids get settled at the
hopper. Sludge from the hopper is re circulated back to the anaerobic digester while
balanced is sent to the dewatering system.

 Dewatering system:

Slurry shall be then feed to dewatering system for separation of solid and liquid. The
filtrate shall be then collected at the filtrate tank. The filtrate shall be then transferred
to hopper for makeup water.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

V. Utility Requirements (GREE scope):

a. Biogas Plant for Waste Water

Sr. No. Items Specifications


Connected Power Approx. 348 KW
1. Power
Operating Power Approx. 210 KW
2. Manpower 1 Chemist in general Shift. One operator in each shift.
Area
3. Approx. 3000 -3200 m2.
Requirement
Soda ash – 50 g/m3,
Seed sludge – Approx. 185 Tons
Chemicals & DAP – 0.5 Kg/ m3
4.
consumables Urea - 1 Kg/ m3
Micronutrients (FeCl3 – 7 g/m3, Nicl2 0.15 g/m3,
ZnCl2 0.15 g/m3, CoCl2 0.15 g/m3)

b. Biogas Plant for Wet Cake

Sr. No. Items Specifications


Connected Power Approx. 107 KW
1. Power
Operating Power Approx. 85 KW
2. Manpower 1 Chemist in general Shift. One operator in each shift.
Area
3. Approx. 1750 m2.
Requirement
Seed sludge – Approx . 75 Tons for Each digester
Poly – 2.5 Kg of Dry Solid Generated
Urea -25 Kg
Chemicals &
4. DAP -10 kg
consumables
Soda ash - as per Requirement
Micronutrients (FeCl3, Nicl2, ZnCl2, CoCl2) – as per
Requirement

VI. Battery Limits for Lars:


5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

a. Biogas Plant for Waste Water


 Raw Effluent @ 39°C : At the inlet of buffer tank.
 Treated Effluent : One meter pipeline from the outlet of Lamella
Clarifier.
 Power : From MCC to terminal boxes of motors.

 Biogas : From reactor to Flare Stack / outlet flange


of biogas blowers.
 Sludge Cake : At the outlet of dewatering system
 Filtrate : At the outlet of dewatering system / inlet of buffer
tank
 Service Water : At one point in plant area.

b. Biogas Plant for Wet Cake

 Wet Cake (Pulp) : At the inlet of Screw Mix Pump


 Plain Water/ Recycled water: At the inlet Mixing tank.

 Sludge Cake : At the outlet of dewatering system


 Filtrate : At the outlet of dewatering system / inlet of mixing
tank
 Power : From MCC to terminal boxes of motors.

 Biogas : Up to Flare Stack / up to Common Gas Holder


 Service Water : At one point in plant area.

VII. Brief Specification of Biogas Plant:


5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Design Details
1. Maximum KG COD / Day for LESAR Digesters. 75608
2. No. of LESAR Digester. 1 no.
3. Liquid Volume of LESAR Digester. Approx. 15122 m3
4. Total Tonnage Approx. 401 MT  2.5%
5. Top Entry Agitator for LESAR Digester. 1 no.
6. Side entry Agitators for LESAR Digester. 5 nos.
7. Total Lamella Clarifier Packs 1 Lot.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

VIII. Lars Scope of Work:

Description
Design & Detail Engineering for Biogas plant (CSTR).
Load data & GA drawings for civil units.
Details Structural design, fabrication & construction drawings for LESAR digester.
Supply of all electromechanical equipments and critical equipments mentioned in
clause no. X.
Detailed specifications of piping, valves, MCC panel, Cable rating, cable routing,
earthing details.
Supply of all piping and valves within Battery Limit.
Supply of Electrical items such as MCC Panel PBS, Cabling etc.
Procurement of steel plates and structural members as per our drawings and
specifications.
Supervision of Fabrication, Erection, Installation, Testing, Seeding &
Commissioning of the Biogas plant for 180 days at free of cost. More than 180
days on chargeable basis as mentioned in this offer.
To & From Air Tickets from India to Indonesia
Lodging & boarding (Food) expenses during commissioning & supervision of works.
Training to client’s staff for 10 days during commissioning.
Providing Laboratory Manual & Operational manual.

IX. Local Scope of Work by PT. Energi Hijau Investama :


Description
Raw Waste Water piping & pumping up to inlet of Buffer Tank
Incomer cable connection to MCC Panel
Soil investigation report and Water table of proposed Biogas plant area.
All civil works, allied paintings and its supervision.
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Supply and erection of all ladder, railing, stair case, insert plates, insert pipes, puddle
flanges, manhole necks, etc. during civil construction.
All local works like. Fabrication, Erection, Installation of equipments, Piping, Valves, etc
supplied from India and its testing at site.
Supply of paint material, surface preparation & painting work as per Lars specifications.
Manpower, Water & Power for construction of plant.
Local conveyance like Airport pickup & Drop facilities.
To arrange for and bear the cost associated for mandatory inspection with third party
inspection to the biogas facility.
Liasoning with any statutory authority / seeking permission from local authority for
carrying out work, if any.
Assistance for visa & other formalities for LEPL personal.
Custom clearance inside Indonesia and its shifting till site for material supplied from
India and any documents required for transporting goods to site.
Biogas piping and burning system in boiler, Blower Room etc.
Loading / Unloading, Handling, Safe storage of the materials and labour hutment at
site.
Land development, area leveling, site cleaning, wood / tree cutting, etc.
Temporary piping and pumping arrangement for hydraulic testing

X. GREE Scope of Work:

Description
Any inspection if required need to be carried out by Client before dispatch from our
works.
Operational Manpower, Water & Power for operation of plant.

Supply of seed culture, chemicals, nutrients, consumables, lubricants, etc for


commissioning & operation, as the client will get the benefit to make a long term
purchase contract to the supplier in big quantity rather than contractor who will
purchase in smaller quantity.
Laboratory with apparatus, glassware, chemicals and manpower for testing raw and
treated wastewater
Treated wastewater handling / sludge disposal arrangement

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Supporting the contractor to any statutory authority / seeking permission from local
authority for carrying out work, if any.
Any other works not specifically mentioned above.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

XI. List of Supply Items (Lars Scope):


a. Biogas Plant for Waste Water
Sr.
No. Equipment Specifications
Anaerobic Treatment
1 Caustic Dosing System
Qty 1 No. Metering Pump, 1 No. Agitator with
PVC/Sintex tank.
2 LESAR Feed Pumps at BT
Type Horizontal, centrifugal, non clog, gland pack
MOC SS 304 all
Flow Approx. 163 m3/hr, 20 - 25 m head
Quantity 2 nos. [1 W + 1 SB]
Make KSB / Grundfos
3 Sludge Recirculation Pumps at Lamella Clarifiers
Type Horizontal, centrifugal, non clog, gland pack
MOC CI all
Flow Approx. 325 m3/hr, 20 -25 m head
Quantity 2 nos. [1 W + 1 SB]
Make KSB / Grundfos
4 Flame Arrestor
Quantity 1 no.
MOC CI body with SS bank
Make Fluidyne
5 Liquid Flow Meter on LESAR Feed Line
Type Electromagnetic type with totalizer
Flow 0 – 163 m3/hr
Quantity 1 no.
Make E&H
6 Liquid Flow Meter on LESAR Acidification Line
Type Electromagnetic type with totalizer
Flow 0 – 55 m3/hr
Quantity 1 no.
Make E&H
7 Liquid Flow Meter on Sludge Recirculation Line
Type Electromagnetic type with totalizer
Flow 0 – 325 m3/hr
Quantity 1 no.
Make E&H
8 Pressure Gauges For Liquid Flow
Type Bournden
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Quantity 1 Lot
Make Waree / ITEC
9 Pressure Gauges For Gas Flow
Type Diaphragm
Quantity 1 Lot
Make Waree / ITEC
10 Manometer
Type Glass 'U' Tube
Quantity 1 no.
Make Veksler/BVK
11 Temperature Indicator
Quantity 1 No.
Make Forbes Marshall
12 Temperature Gauges
Quantity Lot
Make Waree / ITEC
13 Top Entry Agitator
KW Approx. 11.2 KW
Quantity 1 no.
Make Gladwin
14 Side Entry Agitator
Angle Fixed
KW Approx. 5.5 KW
Quantity 5 nos.
Make Gladwin
15 Lamella Clarifier Packs
MOC FRP Plate 2.5 mm thickness
Quantity 1 Lot
16 Liquid level Indicator for Flare Stack
Quantity 1 no.
17 Biogas Blower with Motor (Common for present, expansion + cake)
Type Twin lobe, Root Type
MOC CI with 2% NI impregnation
KW Approx. 75 KW
Flow Approx. 3000 m3/hr @ 3500- 4000 mmwc
Quantity 2 nos. [1W + 1 SB]
Make Kay / PPI / Airvac / Everest
18 Biogas Flow Meter
Type Vortex
Flow 0 - 3000 m3/hr
Quantity 1 no.
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Make Forbs Marshall / E&H / Rosemmount


Prefabricated Items
19 Flare Stack
Qty 1 no. Manually Ignited
MOC MS
20 Central Column of Digester Inside
Qty 1 no.
MOC MS
21 Pressure & Vacuum Breaker (Safety Devise)
Qty One each (Total 2 nos. for 1diegster)
MOC MS
22 De-gassifier
Qty 1 no.
MOC MS
23 Lamella Clarifier
Qty 1 no.
MOC MS
24 Steel Plates & Structural Steel
Qty Approx. 401 MT  2.5%
Make Tata / Sail / Jindal / Lloyds
Sludge Management System
25 Sludge Sump Mixer
Type Slow Speed, Fixed
MOC CI all
Power Suitable
Quantity 1 no.
Make Biotec / Ganesh / IC
26 Sludge Pumps
Type Progressive Cavity Type
MOC CI all
Flow Suitable
Quantity 2 nos. [1 W + 1 SB]
Make Rotomac / Roto
27 Centrifuge
Type Solid Bowl type
Bowl MOC SS 304
Flow Suitable
Quantity 1 no.
Make Alfa Laval / Hiller
28 Poly Dosing System
Qty 1 No. Metering Pump, 1 No. Agitator with
PVC/Sintex tank.
Other Common Items

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

29 Interconnection Piping
Quantity 1 Lot
MOC of pipes
Reactor Feed Line Feed line in SS 304 – Schedule 5
Other Pipes MS Class 'C' / HDPE 6 Kg/cm2
HDPE – All HDPE pipes shall be underground
pipes.
Make TATA / Astral / Prakash Surya / Jindal
30 Valves
Quantity 1 Lot
MOC of Valves
Feed Line Butterfly valves – CI SS,
Other Valves on piping Butterfly valves - CI CI , Ball Valves – CI SS,
Check Valves – CI CF8M
Make of valves Intervalve / CoFlow / Delvalve
31 Electrical Items
MCC panel 1 no., ABB / Siemens / L&T
Cables Qty 1 Lot
Cable Make Polycab / Gloster
Motor Make Kirloskar / ABB / Siemens
Earthing material 1 Lot
Other Electrical Specifications as per Annexure - 2

b. Biogas Plant for Wet Cake

Sr. No. Equipment Specifications


1 Quick Mix Pumps
Qty 2 nos. [1W + 1SB]
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

2 Screw Pumps
Qty 4 nos. [2W + 2SB]
3 Mixer in Mixing Tank
Qty 1 no.
4 Caustic Dosing System
Qty 1 no.
5 Pressure & Vacuum Breaker (Safety Devise)
No. One each (Total 2 nos. for 1diegster)
6 Flame Arrestor
Qty 2 nos.
7 Liquid Flow Meter on LESAR Feed line
No. 2 nos.
8 Pressure Gauges For Liquid Flow
No. 1 Lot
9 Pressure Gauges For Gas Flow
No. 1 Lot
10 Manometer
No. 2 nos.
11 Moisture Trap
Qty 2 nos.
12 Temperature Gauge
Qty 1 Lot
13 Agitators for Digesters
Top Entry Agitators
No 1 Lot
Side Entry Agitators
No 1 Lot
14 Liquid level Indicator for Flare Stack
Qty 2 nos.
15 Flare Stack (Local/Site Fabricated)
Qty 2 nos. Manually Ignited
16 Mixer In Collection Tank
Qty 1 no.
17 Screw Pumps @ collection Tank
Qty 2 nos. [1W + 1SB]
18 Dewatering Unit
No 1 no.
19 Pumps for backwash near Dewatering Unit
Qty 2 nos. [1W + 1SB]
20 Filtrate Transfer Pumps
Qty 2 nos. [1W + 1SB]
21 Pumps at Intermediate Sump
Qty 2 nos. [1W + 1SB]
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

22 Dosing System
Qty 1 no.
23 Gas Flow Meter
No. 1 no. for Each Digester
24 Steel Plates & Structural Steel
Quantity Approx. 274 MT ± 2.5 %
25 Pre-Fabricated Items
Quantity 1 Lot
26 Piping
No. 1 Lot
27 Valves
No. 1 Lot
28 Electrical Items
No. 1 Lot
Other terms & conditions as per Annexure -2

XII. List of Civil Units (PT. Energi Hijau Investama Scope):

a. Biogas Plant for Waste Water


List of CIVIL Units
Volume,
Sr.
Height m3/
No Unit nos. MOC Diameter Length Width
/ SWD Area
.
m2
1 Buffer Tank 1 RCC 28.8 - - 3 1950

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

LESAR reactor
2 foundation 1 RCC 34.2 - - - 916
Gas Holder
3 Container 1 RCC 13.7 - - 6 884
4 Sludge Sump 1 RCC 5.8 - - 3 80
Centrifuge 1 RCC / - 3 2 - 6
Building Brick
5 Masonry
Lamella / RCC / Suitable -
Degassifier PCC
6 Foundation
Foundations for 1 RCC / Lot -
Equipments PCC
pumps, flare, pipe
7 supports
Biogas Blower 1 Brick 2 3 6
8 Room Masonry
MCC / Laboratory 1 RCC / - 4 3 12
Brick
9 Masonry
 All dimensions are in mtr.
 Dimensions may change after detailed engineering.

b. Biogas Plant for Wet Cake

List of CIVIL Units


Volume,
Sr. Height m3/
Unit nos. MOC Diameter Length Width
No. / SWD Area
m2
Mixing Tank
1 1 RCC 7.9 - - 3 147
LESAR reactor
2 foundation 2 RCC 22.1 - - - 385
Collection Tank
3 1 RCC 5.6 - - 3 73

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Filtrate Sump
4 1 RCC 4.6 - - 3 49
Intermediate Sump
1 RCC 2.5 1.5 7
Fan Screw Separator 1 RCC / Brick - 3 2 - 6
5 Building Masonry
Foundations for 1 RCC / PCC Lot -
Equipments pumps,
6 flare,
Weighing Room 1 Brick Suitable to weigh 230 MT Cake 12
7 Masonry
MCC / Laboratory 1 RCC / Brick - 4 3 12
8 Masonry
 All dimensions are in mtr.
 Dimensions may change after detailed engineering.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Commercial Proposal

I. Budgetary Price:

a. Biogas Plant for Waste Water


Our budgetary price for our scope of work mentioned in this offer for Biogas Plant
(CSTR) on FOB Mumbai Port, India basis shall be USD 1,300,000 (US Dollar One
Million Three Hundred Thousand Only).

b. Biogas Plant for Wet Cake


Our price for our scope of work mentioned in this offer for Biogas Plant (CSTR - 2 Nos.)
on FOB Mumbai Port, India basis shall be USD 880,000 (US Dollar Eight Hundred
Eighty Thousand Only).

The price mentioned above is exclusive of all taxes and duties in Indonesia.

We have considered maximum 180 days supervision of our engineer at free of cost,
above 180 days we shall charge you per diem charges of $ 250 (US Dollar Two
Hundred Fifty Only) per person per day.

The Price quoted above is at prevailing conversion rate :

1 USD = 62 INR

1 USD = 12599 IDR

.Any fluctuation in exchange rates shall be to your account.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

II. Estimated Local Cost of Work


( PT. Energi Hijau Investama Scope)

a. Biogas Plant for Waste Water

The estimated cost of work in local partner scope like civil works, Paint supply and
Painting work, Erection, Fabrication , Installation and other local works required for
Biogas Plant shall be approx. USD 1,800,000 (US Dollar One Million Eight
Hundred Thousands Only).

b. Biogas Plant for Wet Cake

The estimated cost of work in local partner scope like civil works, Paint supply and
Painting work, Erection, Fabrication , Installation and other local works required for
Biogas Plant shall be approx. USD 650,000 (US Dollar Six Hundred Fifty
Thousands Only).

The price mentioned above is exclusive of all taxes and duties in Indonesia.

The above prices are indicative figures which refer to Indian Rate and tentative liquid
volumes / area of the civil units in the offer will be confirmed at detail design stage.

III. Manner of Payments:


5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Client need to pay Lars Enviro for design, know-how, equipment supplies, guidance for
commissioning and training as specified in the contract, the following percentage of the
contract price.
1.1 100 % of the contract value through irrevocable, transferable, divisible and
confirmed letter of credit in four of Lars Enviro Pvt. Ltd by a 1 st class
international bank out which :
1.1.1 30 % of the contract value as an advance is required to be
remitted on submission of proforma Invoice for 30 % Advance to
Lars Enviro Pvt. Ltd.
1.1.2 70 % will be paid by the buyer against submission of shipping
documents. Lars Enviro Banker should be able to negotiate the
L/C on Lars Enviro’s behalf.
It is essential for 2nd party [buyer] to obtain necessary clearance and authorization from
the competent authorities in their country regarding setting up of plant. The buyer has
to ensure that mode of payment of advance and the letter of credit or any other
financial instruments to be established, mutually agreeable by both the bankers located
in the buyer’s and seller’s country for the purpose.

IV. Mode of Payments:


All payments except advance shall be made through an irrevocable, divisible,
transferable and confirmed letter of credit payable at sight in our favour from any
internationally accepted 1st class bank. Other payments shall be through money
transfer.

V. Delivery:
LESAR Digester shall be ready for commissioning within 10 months from date of
techno-commercially cleared purchase order along with advance and handing over the
dully hydro tested civil works.

Delivery is subjected to
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

 Timely release of payments.


 Construction of civil units within 3 months.
 Approval of layout and GA within 4 working days from your side.
 If approved drawings are revised, we shall need minimum 12 days to submit
revised drawings.
 Well equipped laboratory is made available from day 1 of pre-commissioning
activities. We recommend to have independent laboratory for ETP and to be use
QA/QC lab for ETP lab analysis
 Operators and helpers are made available round the clock from day 1 of seeding
process
 Analytical staff for routine daily analysis is made available from day 1 of seeding
process
 Raw waste and other utilities / consumables / chemicals required are made
available as per the requirement during seeding, commissioning and stabilization.
Commissioning means: Seeding of the plant and smooth running of all
equipments.

VI. Validity:

The offer is valid for a period of 30 days, from the date of submission.

VII. Warranty:
All mechanical equipments supplied by Lars shall be under warranty for 12 months from
the date of supply.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Annexure - 1

Definition of GENERAL TERM

 ERECTION: When all the equipments, Agitators, interconnecting Piping,


valves, Instruments and its accessories are put in place /civil units and
connected to power / other units.
 COMMISSIONING: It means seeding of the plant & smooth running of all
the equipments.
 HANDING OVER: The trial runs will be conducted on designed organic /
hydraulic load / at ‘available load’ which shall not be exceeding either the
designed organic load or designed hydraulic load in any case. Upon
successful trial runs, plant will be handed over.
 DELIVERY: It describes as completion of erection part and start of
commissioning.
 WARRANTEE: The liability in respect of any direct failure of equipment
supplied and commissioned by LEPL or any loss, injury or damage
attributable thereto, is limited to making good by replacement or repairs,
defects which under proper use appear herein, provided the equipment is
operated and maintained in accordance with our instructions, and arise
totally from months from the date of commissioning of the equipment.
 STATUTORY VARIATIONS: Any changes in Govt. duties, taxes, levies or
policies affecting the PO will be under client scope. Documentary evidence
shall be submitted on request.
 FORCE MAJEURE CLAUSE: This clause is included in contracts to remove
liability for natural and unavoidable catastrophes that interrupt the
expected course of events and restrict participants from fulfilling
obligations.

COMMERCIAL TERMS AND CONDITIONS

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

1. NATURE OF CONTRACT: Our offer is separated in two different parts


Supply of material & Erection and Commissioning.
2. SCOPE OF SUPPLY: The scope of supply is as per Bill of Materials
finalized at the time of PO.
3. ADDITION TO THE SCOPE OF WORK: All Items other than scope of
work is additionally chargeable on the basis of Item Rate.
4. EFFECTIVE DATE OF ORDER: From the date of cleared Wo/Po along with
advance.
5. DELIVERY: Subjected to following conditions.
a) Advance is received within 7 day of submission of required
documents from our side.
b) Inspection on prorate basis.
c) Payments within 10 days of submission of respective proforma
invoice.
d) The firm purchase order is received within 7 days after LOI.
e) Construction of civil units within agreed time.
f) Approval of layout and GA within 4 working days from your side.
g) If approved drawings are revised, we shall need minimum 12 days
to submit revised drawings.
h) Well equipped laboratory is made available from day 1 (First day) of
pre-commissioning activities. We recommend to have independent
laboratory for ETP and not to be use QA/QC lab for ETP lab analysis
i) Operators and helpers are made available round the clock from day
1 of seeding process
j) Analytical staff for routine daily analysis is made available from day
1 of seeding process.
k) Permission to work round the clock at the site.
l) Raw waste and other utilities / consumables / chemicals required are
made available as per the requirement during seeding,
commissioning and stabilization.
6. PRICE VARIATION: Any variation in prices of the equipments due to
changes in taxes, levies & Govt. duties shall be under client scope.
7. DELAYS IN PAYMENTS: This may hold up the work and other parallel
activities.
8. Consequential Damages: Neither party shall at any time lible to other
for any loss nor profits or any similar indirect damages.
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

9. ACCEPTANCE OF THE PLANT: Incase the plant is not commissioned


after the supply within a period of 30 days due to the non availability of
Inputs or any other reason whatsoever, attributable to purchaser, the
plant will be deemed to have been successfully commissioned and the
purchaser do hereby expressly agree for the same. All related payments
should be released accordingly.
10. WARRANTY of the equipments shall be 12 months from the date of
delivery or as per the supplier or vendor. Submittal of all technical
performance curves and warranty certificated provided by the vendor or
supplier shall be under LARS scope. The equipment warranty valid against
defective workmanship and/or poor performance of the system only. Our
liability is limited to repair or replace the same and not subjected to any
wear and tear or supply of consumables and spares due to regular
operation of the system.
11. CANCELLATION: The client or purchaser cannot unilaterally cancel
the order at any time in whole or in part. In the event of order being
cancelled by purchaser, all cost incurred/ committed by the seller including
the cost of part of work executed/ under process on date of receipt of such
written notice for cancellation has to be paid by seller.
12. GENERAL: All Conditions or other matters pertaining to this offer
not expressly stipulated will be a matter of mutual discussions and
agreements at the time of accepting the order.
13. OFFER VALIDITY: Our Offer will be valid for a period of 30 days
from the date of this order.
14. TECHNICAL CONFIRMATION: The client and consultant shall give
there technical approval on the items listed in the BOM so as unable us to
start ordering and purchasing of the material.
15. DISPATCH: All ‘C’ forms, road permits, any local document required
for transit of goods shall be under client scope.
16. INSURANCE: Insurance of the material is under client scope, unless
otherwise agreed specifically.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

17. OPERATING MANUAL: Submission of plant operating manual is


under LARS scope after handing over the plant.
18. CHANGE IN DESIGN: Any change in designing or inlet/ outlet will
make a change in offer technically & commercially.
19. EXCESS MATERIALS: Since we shall be sending to site some items
in excess for smooth and uninterrupted erection and commissioning such
items which remain unused will be our property and will be removed by us
and the purchaser do hereby expressly agrees not to prevent the same.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Annexure - 2

STANDARD ELECTRICAL SPECIFICATIONS


ELECTRICAL SPECIFICATIONS

MCC panel shall be fully compartmentalized and free standing floor mounting.
Maximum height of panel shall be 2.1 mtr and depth of compartment 400 mm.
Double front type panel shall be provided if no of feeders are more. Painting
shall be Epoxy based powder coating (RAL 7032). Thickness of panel shall be
16 SWG. Panel to be provided with Neoprene gaskets. Cable entry shall be
from the bottom as a standard feature. Top cable entry may be provided, if
required. Each starter of MCC will consist of :

A) SFU ( Switch Fuse Unit ) or MPCB – Minimum feeder size shall be


350 mm x 300 mm.

1. Contactor

2. Overload Relay

3. ON / Trip indication.

4. Emergency stop stay – put push button.

5. Motor rating above 11.0 KW, Star Delta starter will be provided.

6. Incomer of MCC will be: MCCB (Moulded Case Circuit breaker) shall be
provided to incomer cable.

B) Earthing

Earthing would be done using G.I. pipe rods as per I.S. standards. G.I.
conductor earthing will be done for all electrical equipment and noncurrent
carrying metallic structures / tanks. G.I. conductors will be used for lightning
protection, connected directly to separate earth pit.

C) Push Button Station

Push button station will be provided near the motor wherever required with
lock and key system. Flameproof push button station (as per IS 2148) will be
provided for flameproof section and non-flameproof push button station (as per
IS 2147) will be provided for non-flameproof section.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

D) Cable Laying

G I open type cable trays will be provided for indoor application. Cables will be
buried in trenches for outdoor cables.

E) Erection Material

Double compression glands will be provided in flameproof section and single


compression glands will be provided in the non-flameproof section.

F) Motor Cover

All motor covers shall be of GI material only

G) Internal Wire

All internal wires of MCC Panel are copper wires.

H) Miscellaneous Details

 MOC of bus bar shall be Aluminium with heat shrinkable PVC sleeves
with colour code of red, yellow, blue for phase identifications
 No capacitor/CVT shall be provided in the panel.
 10 % spare feeders subjected to maximum of 3 nos. shall be provided
without switchgears.
 No additional NO/NC contact shall be provided for PLC provision.
 All meters shall be digital type.
 Thickness of gland shall be 3mm.
I) Power & Control Cables

Motor Cable no & Size MOC

upto 1.5 kW 1 No. X 3 core x 2.5 mm2 Copper

above 1.5 kW & 5.5 kW 1 No. X 3 core x 4.0 mm2 Copper

above 5.5 KW & 11 KW 1 No. X 3 core x 6.0 mm2 Copper

2 Nos. X 3 core x 10.0


15 KW & Above Copper
mm2

18.5 KW 2 Nos. X 3 core x 10.0 mm2 Copper

above 18.5 KW & upto


2 Nos. X 3 core x 16.0 mm2 Copper
26 KW

30 KW 2 Nos. X 3 core x 25.0 mm2 Copper

above 30 KW & upto 45 2 Nos. X 3 core x 25.0 mm2 Copper


5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

KW

52 KW 2 Nos. X 3 core x 35.0 mm2 Copper

above 52 KW & upto 75 Copper


2 Nos. X 3 core x 50.0 mm2
KW

90 KW 2 Nos. X 3 core x 70.0 mm2 Copper

100 KW 2 Nos. X 3 core x 95.0 mm2 Copper

Control cable for push


1 No. X 3 core x 1.5 mm2 Copper
button station

For DOL Starter Motor rating Cable size

Upto 5.5 KW 2.5 mm2

7.5 KW 4.0 mm2

9.3 KW 4.0 mm2

11.0 KW 4.0 mm2

Internal Wire Copper

For Star – Delta


Motor rating
Starter

Cable size Cable size


Power
(supply side) (motor side)

15.0 KW 10.0 mm2 4.0 mm2

18.5 KW 10.0 mm2 4.0 mm2

22 KW 16.0 mm2 6.0 mm2

30 KW 25.0 mm2 10.0 mm2

45 KW 50.0 mm2 25.0 mm2

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Annexure - 3

PERFORMANCE TEST

The trial runs will be considered as successful if the performance standards as


mentioned above are met as per the procedure detailed below:

Performance test shall be conducted at designed organic load at a hydraulic load


not exceeding the design flow. The inlet parameters for the test shall not exceed
the design conditions during test period. The influent condition shall not deviate
more than 5% from the design condition.

The trial runs will be conducted for a continuous period of 72 hours. If designed
organic / hydraulic load is not available upon reaching stabilized state, trial runs
shall be conducted at ‘available load’ which shall not be exceeding either the
designed organic load or designed hydraulic load in any case.

Influent and Waste Water sample values of different parameters will be based
on average of daily values determined from a composite sampling. The
performance test shall be started with a 3 days’ notice to Client after reaching
steady state. Client shall ensure uninterrupted supply of raw Waste Water
conforming to the inlet design conditions and all utilities including power,
chemicals, manpower etc. during stabilization/ commissioning period prior to
test runs and also during trial runs. If trial runs cannot be conducted due to
reasons attributable to client within 6 months from the date of hydraulic testing
or within 3 months from the date of seeding, the plant will be deemed to be
taken over by the client and the related payments, if any shall be released
immediately along with handover certificate.

Upon successful completion of trial runs, client shall formally take over the plant
and issue a performance cum handover certificate.

The commissioning for the purpose this order would mean seeding of the plant
and smooth running of all equipments.

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

Annexure - 4

List of Anaerobic Installations


Design
Sr. flow,
No. Name of client Nos. m3/d State
1 A.B.Grains Pvt. Ltd. (Guru Teg Bahadur Sugars) I 360 Punjab
2 A.B.Grains Pvt. Ltd. (Guru Teg Bahadur Sugars) II 360 Punjab
3 Agribiotech Industries Ltd. I 400 Rajasthan
4 Anand Distilleries Pvt. Ltd. I 350 Maharashtra
5 AP Co-op Oilseed Growers Fedn Ltd. I 240 Andhra Pradesh
6 Alkoplus Producers Pvt. Ltd. I 155 Maharashtra
7 Arian Breweries & Distilleries Ltd I 925 Rajasthan
8 Athini Farmers Sugar Factory Ltd. I 450 Karnataka
9 Athini Farmers Sugar Factory Ltd. I 450 Karnataka
10 Athani Sugars Ltd. I 1400 Karnataka
11 Badami Sugars Ltd. I 400 Karnataka
12 Bajaj Hindusthan Limited, I 750 Uttar Pradesh
13 Bajaj Hindusthan Ltd. – I I 750 Uttar Pradesh
14 Bajaj Hindusthan Ltd. – II I 750 Uttar Pradesh
15 Bajaj Hindusthan Ltd. - III I 750 Uttar Pradesh
16 Bajaj Hindusthan Ltd. – IV I 750 Uttar Pradesh
17 Balaji Distilleries Ltd. I 1200 Tamil Nadu
18 Balezaf Alcohol & Liquors Factory I 260 Export
19 Barmalt (India) Pvt. Ltd. I 1150 Haryana
20 Bannari Amman Sugars Limited I 450 Tamil Nadu
21 Bannari Amman Sugars Limited II 550 Tamil Nadu
22 Bannari Amman Sugars Ltd, (Thirunnamalai) II 1500 Tamil Nadu
23 Bannari Amman Sugars Ltd. Madras I 1500 Tamil Nadu
24 Bannari Amman Sugars Ltd. Nanjangud I 1500 Karnataka
25 Bannari Amman Sugars Ltd. Nanjangud I 1400 Karnataka
26 Bannari Amman Sugars Ltd. Nanjangud I 1400 Karnataka
27 Bannari amman Sugars Ltd. -(Unit -III)Kollegal I 1500 Tamil Nadu
28 Bannari Amman Sugars Ltd. Sinnapulliur I 550 Tamil Nadu
29 Bannari Amman Sugars Ltd. Sinnapulliur I 350 Tamil Nadu
30 Bhalkeshwar Sugars Ltd. I 500 Karnataka
31 Bhandara Dairy Ltd. I 200 Maharashtra
32 Bharat Starch Industries Ltd. I 90 Karnataka
33 Bhavani Distilleries & Chemicals Ltd. I 0 Tamil Nadu

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

34 Bilagi Sugars Ltd. I 400 Karnataka


35 Brihan Maharashtra Sugar Syndicate Ltd. I 170 Maharashtra
36 Brihan Maharashtra Sugar Syndicate Ltd. II 175 Maharashtra
37 Brihan Maharashtra Sugar Syndicate Ltd. III 250 Maharashtra
38 Brima sagar Maharashtra Distillery ltd. IV 125 Maharashtra
39 Burns Philp India Limited, I 200 Maharashtra
40 Carlsberg Brewries Ltd. Ponta Sahib Unit I 400 Himachal Pradesh
41 Carlsberg Brewries Ltd., Hyderbad Unit I 1000 Andhra Pradesh
42 Carlsberg India Pvt. Ltd. Patna I 750 Bihar
43 Carlsberg India Pvt. Ltd. (Aurangabad unit) I 300 Maharashtra
44 Carlsberg India Pvt. Ltd. (Aurangabad unit) I 450 Maharashtra
45 Charminar Breweries Ltd. (Skol Breweries) I 1000 Andhra Pradesh
46 Charminar Breweries Ltd. (Skol Breweries) I 1600 Andhra Pradesh
47 DABUR India Ltd. I 180 Uttarakhand
48 Deccan Sugar Pvt. Ltd. I 500 Maharashtra
49 Desta Alcohol & Liquors Factory PLC I 100 Export
50 Devans Modern Breweries Ltd. I 600 Jammu & Kashmir
51 Devans Modern Breweries Ltd. Kotputhli I 500 Rajasthan
52 Dhanalaxmi Sugars Pvt. Ltd, (Condensate) I 1728 Tamil Nadu
53 Dhanalaxmi Sugars Pvt. Ltd. (Sugar ETP) I 500 Tamil Nadu
54 Dharani Sugars & Chemicals Limited, I 360 Tamil Nadu
55 Dharani Sugars & Chemicals Ltd. I 500 Tamil Nadu
56 Dinshaws Frozen Foods Ltd. I 150 Maharashtra
57 Empee Sugars & Chemiclas Ltd. Ambasamudram I 1200 Tamil Nadu
58 Empee Sugars Ltd. Naidupet I 500 Andhra Pradesh
59 Gemini Distilleries Pvt. Limited, I 400 Karnataka
60 India Glycols Limited, I 550 Uttarakhand
61 India Glycols Limited, I 540 Uttarakhand
62 India Glycols Limited, II 540 Uttarakhand
63 India Glycols Limited, III 540 Uttarakhand
64 India Glycols Limited, IV 729 Uttarakhand
65 India Glycols Limited, V 600 Uttarakhand
66 India Glycols Limited, VI 600 Uttarakhand
67 Indian Sugars Mfg Co. Ltd. I 500 Karnataka
68 J. P. Distilleries Ltd. (SLN Unit- Dharwad) I 400 Karnataka
69 J.P. Distilleries Ltd. Kunigal I 600 Karnataka
70 J.P.Group (SLN Distilleries PVT. Ltd) I 260 Karnataka
71 Kals Breweries Pvt. Ltd. I 1500 Tamil Nadu
72 Kamadhenu Ventures Combodia Ltd. Combodia I 1100 Export
73 Khemani Distilleries Pvt. Ltd. I 550 Daman
74 Knowledge Integration Services India Pvt. Ltd.,- Plant 1 I 702 Export
75 Knowledge Integration Services India Pvt. Ltd.,-Plant 2 I 540 Export
76 Knowledge Integration Services India Pvt. Ltd., - Plant 3 I 780 Export
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

77 Knowledge Integration Services India Pvt. Ltd.,- Plant 3 I 780 Export


78 Knowledge Integration Services India Pvt. Ltd.,- Plant 4 I 540 Export
79 Knowledge Integration Services India Pvt. Ltd.,- Plant 4 I 726 Export
80 Knowledge Integration Services India Pvt. Ltd.,- Plant 5 I 1000 Export
81 Knowledge Integration Services India Pvt. Ltd. - Plant 6 I 2025 Export
82 Knowledge Integration Services India Pvt. Ltd. - Plant 6 I 2025 Export
83 Knowledge Integration Services India Pvt. Ltd. Plant 7 I 760 Export
84 Knowledge Integration Services India Pvt. Ltd. Plant 8 I 720 Export
85 Knowledge Integration Services India Pvt. Ltd. Plant 9 I 720 Export
86 Knowledge Integration Services India Pvt. Ltd. Plant 10 I 1575 Export
87 Knowledge Integration Services India Pvt. Ltd. Plant 11 I 876 Export
88 Knowledge Integration Services India Pvt. Ltd. Plant 12 I 1050 Export
89 Knowledge Integration Services India Pvt. Ltd. Plant 13 I 0 Export
90 Kool Breweries Ltd. (Carlsber -Dharuhera,Haryana) I 600 Haryana
91 Kothari Sugars & Chemicals Ltd., I 720 Tamil Nadu
92 Kothari Sugars & Chemicals Ltd., I 435 Tamil Nadu
93 Kothari Sugars & Chemicals Ltd., -Kattur I 377 Tamil Nadu
94 KMG Company Limited (Myan Aung Site) I 1300 Export
95 Lakshya Food (India) Ltd. I 200 Haryana
96 Lao Brewery Co. Ltd. (Carlsberg -Laos) I 4000 Export
97 Lokmangal Sugar Ethanol & Co-gen Ind. Ltd.-BC I 1000 Maharashtra
98 Lokmangal Sugar Ethanol & Co-gen Ind. Ltd. - BC I 1350 Maharashtra
99 Lokmangal Mauli Industries Ltd. I 1000 Maharashtra
Lokmangal Sugar Ethanol & Co-gen Ind. Ltd. Bibee-
100 darfal I 500 Maharashtra
Lokmangal Sugar Ethanol & Co-gen Ind. Ltd. Bibee-
101 darfal I 500 Maharashtra
102 Lokmangal Agro Industries Ltd. Bibee-darfal I 500 Maharashtra
103 Lokmangal Agro Industries Ltd. Bibee-darfal I 500 Maharashtra
104 Luna Chemicals Ltd. I 400 Gujrat
105 Luna Chemicals Ltd. I 400 Gujrat
106 Luna Chemicals Ltd. 1 400 Gujrat
107 Luna Chemicals Ltd. 1 400 Gujrat
108 Lupin Ltd. I 300 Maharashtra
109 Manali Sugars Ltd. I 500 Karnataka
110 Marchha Biotech Ltd. I 140 Maharashtra
111 Malbros International Pvt. Ltd. I 480 Punjab
112 Mojj Engineering System ltd. I 245 Maharashtra
113 Mojj Engineering System ltd. I 245 Maharashtra
114 Morya Grain Distilleries Pvt. Ltd. I 250 Maharashtra
115 Mount Everest Breweries Ltd I 550 Madhya Pradesh
116 Mount Shivalic Breweries Ltd, Derabassi I 700 Punjab
117 Mount Shivalik Breweries Ltd, Saha I 500 Haryana

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

118 Myanmar carlsberg co., Ltd. I 1000 Export


119 Naran Lala (Chincholi Sugar) I 726 Karnataka
120 Narmada Gilatin Ltd. I 2000 Madhya Pradesh
121 Natural Sugars & Allied Industries Ltd. I 750 Maharashtra
122 Natural Sugars & Allied Industries Ltd. I 500 Maharashtra
123 Natural Sugars & Allied Industries Ltd. I 550 Maharashtra
124 Nava Bharat Agro Products Ltd I 400 Andhra Pradesh
125 Nava Bharat Agro Products Ltd I 600 Andhra Pradesh
126 Nava Bharat Agro Products Ltd I 0 Andhra Pradesh
127 Nicholas Piramal India Ltd. I 160 Tamil Nadu
128 Nirani Sugars Ltd. I 400 Karnataka
129 Nirani Sugars Ltd. II 1000 Karnataka
130 Nitta Gelatin India Ltd. I 930 Keral
131 Nitta Gelatin India Ltd. I 930 Keral
132 Nitta Gelatin India Ltd. I 0 Keral
133 NSL sugars Ltd. (SCM) I 750 Karnataka
134 NV Distilleries & Breweries (P) Ltd. I 1125 Punjab
135 Oasis Alcohols Ltd. I 700 Maharashtra
136 Orangecity Beverages Pvt. Ltd. I 100 Maharashtra
137 Parag Breweries Ltd. (Carlsburg, WB) I 750 West Bengal
138 Parle Buiscuits Pvt. Ltd. [Waste Encare] I 200 Maharashtra
139 Parle Buiscuits Pvt. Ltd. [Waste Encare] I 200 Haryana
140 Parle Buiscuits Pvt. Ltd. [Waste Encare] I 80 Rajasthan
141 Parle Buiscuits Pvt. Ltd.-Khopoli [Goldfinch] I 50 Maharashtra
142 Parle Buiscuits Pvt. Ltd. Neemrana [Goldfinch] I 82 Rajasthan
143 PERFETTI Van Melle I 120 Tamil Nadu
144 Pioneer Distilleries Ltd. Dharmabad I 500 Maharashtra
145 Pioneer Distilleries Ltd. Dharmabad(UB Group) I 700 Maharashtra
146 Pioneer Distilleries Ltd. Dharmabad(UB Group) I 700 Maharashtra
147 Pioneer Jellice Industries Ltd. I 930 Tamil Nadu
148 Prasad Sugar And Agro Product Ltd., Rahuri I 500 Maharashtra
149 Privilege Industries Ltd. (Brewery) I 420 Maharashtra
150 Punarnava Rasyan Pvt. Ltd. I 39 Maharashtra
151 Rajshree Sugars & Chemicals Ltd. I 750 Tamil Nadu
152 Rajshree Sugars & Chemicals Ltd. I 1000 Tamil Nadu
153 Renault Nissan Automotive India Pvt. Ltd. I 8.3 Tamil Nadu
154 Renuka Sugars Ltd. Gujrat I 600 Gujrat
155 Renuka Sugars Ltd. Athani i 1020 Karnataka
156 Renuka Sugars Ltd. Athani - CPU I 1500 Karnataka
157 Ruchi Soya Industries Ltd. I 600 Andhra Pradesh
158 SAB Miller (CDBL, Meerut) I 1300 Uttar Pradesh
159 SAB Miller (Haryana Breweries Ltd.) I 1500 Haryana
160 SAB Miller (Pals Breweries, Aurangabad : Phase I) I 1300 Maharashtra
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

161 SAB Miller (Pals Breweries, Aurangabad : Phase II) I 600 Maharashtra
162 SAB Miller (Rochees Breweries, Nimrana) I 1400 Rajasthan
163 SAB Miller (Malabar unit, Kerla I 300 Keral
164 SAB Miller India Ltd. (Pals unit, Aurangabad) I 625 Maharashtra
165 SAB Miller India Ltd. (Fosters unit, Aurangabad) I 500 Maharashtra
166 Saikrupa Sakhar Karkhana Ltd. I 500 Maharashtra
167 Sagar Industries & sugars Ltd. I 550 Maharashtra
168 Satish Sugars Ltd. I 450 Karnataka
169 Satish Sugars Ltd. I 850 Karnataka
170 Satish Sugars Ltd. I 450 Karnataka
171 SCM Sugars Ltd. I 600 Karnataka
172 SCM Sugars Ltd. (NSL Sugar) I 800 Karnataka
173 Sevanagala Sugar Industries Ltd. I 300 Export
174 Shakti Sugars Ltd. I 1000 Tamil Nadu
175 Shree Distillery Pvt. Ltd., I 225 Export
176 Shri Prabhulingeshwar Sugars & Chemicals Ltd. I 1250 Karnataka
177 Siddapur Distilleries Ltd. I 550 Karnataka
178 SNJ Breweries Pvt. Ltd. I 1200 Maharashtra
179 Sovereign Distillery Ltd. (USL) I 820 Karnataka
180 Specta Technology Solutions Pvt. Ltd. (Sikkim) I 275 Sikkim
181 SVK Milk Producers Pvt. Ltd. I 100 Maharashtra
182 Synergy Biorefineries Pvt. Ltd. I 647 Andhra Pradesh
183 The Andhra Petrochemicals Ltd. I 72 Andhra Pradesh
184 The Andhra Sugars Ltd, Bhimadolu I 225 Andhra Pradesh
185 The Andhra Sugars Ltd, Tanaku I 950 Andhra Pradesh
186 The Andhra Sugars Ltd,Taduvai I 300 Andhra Pradesh
187 The Crown Beer Internationals Pvt.Ltd. I 750 Andhra Pradesh
188 The Crown Beer Internationals Pvt.Ltd. I 1250 Andhra Pradesh
189 The Jeypore Sugar company Ltd. I 1000 Andhra Pradesh
190 The Jeypore Sugar company Ltd. II 1000 Andhra Pradesh
191 The Saswad Mali sugar Factory Ltd. I 350 Maharashtra
192 The Ugar Sugars Works Ltd. I 360 Karnataka
193 The Union Paper Mill I 1800 Export
194 Thiru Arooran Sugars Limited, I 360 Tamil Nadu
195 Thiru Arooran Sugars Limited, II 360 Tamil Nadu
196 Thiru Arooran Sugars Ltd., [Ambika Sugars] I 0 Tamil Nadu
197 Thiru Arooran Sugars Ltd., [Ambika Sugars] II 1400 Tamil Nadu
198 Tilaknagar Industries Ltd. I 250 Maharashtra
199 Trident Sugar Ltd. I 600 Tamil Nadu
200 Turkish Sugar Factory, (Erzurum) I 3600 Export
201 Turkish Sugar Factory, (Eskisehir) I 4800 Export
202 Turkish Sugar Factory, (Kastamonu) I 3600 Export
203 Turkish Sugar Factory, (Kayseri) I 6000 Export
5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP
Lars Enviro Pvt. Ltd. 2014

204 Turkish Sugar Factory, Burdur I 4800 Export


205 United Breweries Ltd. (Empee Chennai) I 650 Tamil Nadu
206 United Breweries Ltd. Kalyani II 900 West Bengal
207 United Breweries Ltd. Dharuhera III 400 Haryana
208 United Spirit Ltd, (MDL, Aurangabad) I 300 Maharashtra
209 United Spirit Ltd, (MDL, Aurangabad) I 700 Maharashtra
210 United Spirits Ltd I 247 Maharashtra
211 United Spirit Ltd, (Rosa) I 750 Uttar Pradesh
212 United Spirit Ltd, Hospet I 180 Karnataka
213 United Spirit Ltd, Hospet I 180 Karnataka
214 Vaibhav Liquors Pvt. Ltd. I 360 Maharashtra
215 Valsad Cooperative [AMUL] I 130 Maharashtra
216 Vitthalrao Shinde SSK Ltd I 1600 Maharashtra
217 Wilson Distilleries Pvt. Ltd. I 200 Karnataka

5
GREE Energy Tophill Project, Indonesia | 226/14-15/R0 - WWTP